Field of the Invention
The present invention relates to a method of
operating an adsorption plant or installation having
a multiplicity of cyclically operated pressure-swing
adsorbers, especially for the cleaning and rectification
(component separation) of a gas or gas mixture.
More particularly, the invention relates to the
operation of a system having a multiplicity of adsorbers
of the type which can be regenerated (discharge of
adsorbed material) by changing the pressure within the
adsorber gas. The invention is especially applicable
to the operation of an adsorber system utilizing individual
adsorbers.
Ba~kqround of the Invention
A process utilizing pressure-swing adsorbers
for the cleaning and rectification of gases, especially
utilizing a plurality of adsorbers, is known in the art
with the i~portant advantage that thermal regeneration
of the adsorber gas is not required.
557'
~99
An installation for the purposes described can
comprise a multi21ici~y o~ adsorbers which undPrgo, in each
operating cycle, a predetermined number of adsorption phases,
pressure--relie~ or pressure-equaliza' iOII phases, purging
phas~s and rep~essurization or pr~ssure buildup phases.
; For the cleanin~ and rectification of gases, especiallythe cleaning of natural gas or the rectification of noble or
inert gases, air, sewer gases, cracking gases, hydrogen-rich gas
- mixtures or mixtures of gaseous hydrocarbons, it is a common
practice nowadays to utilize adsorption proresses because of
the high economy and effectiveness.
In recent years, this field has seen an increased rate
of growth because of the introduction of quasi-isothermal pro-
cesses which are generally referred to as pressure-swing
adsorp~ion processes.
In these processes, the deso~ption or regeneration of
the chnr~ed or loaded adsorption medium is not effected by an
increase in temperature which must be followed by a cooling to
the ~dscrpt~on temperature, but rather exclusively by a reduc-
tion in pressure over the loaded adsorbent, i.e. a pressurerelier~ of the adsorber, whereby the adsorption stage is
effected at least during its later phases by the passing of a
purge gas through the medium.
It is also known9 in this pressure-swing adsorption
technique, to utilize the gas freed upon the pressure relieving
of a loaded adsorber, more or less completely to increase the
pressure (during respective pressure build-upFhases) in other
adsorbers which have previously been brought to low-pressure
levels by the respective pressure relief phasesO
- 2 -
~ 5 ~7
16999
For example, Ger~an patent doc~Dent (open 2ppl' cation
- OEfenlegungsschrift) D~-OS 2~ 34 34~ ~escribes a process for
the cleaning or rectification oE an input gas mixture by
pressure-swing adsorpt.on units totaling nine in the installa-
tion. Each of ti~se adsorbers is assigned six valves.
Following the adsorption phase at high pressure, each
adsorber, in turn, undergoes a plurality of pressure-relief
stages and the gas initi.ally found in the interstices of ~he
adsorption agent and later al30 adsorbed components, is
withdrawn and in part used for pressurization of adsorbers
which have been brought to their low pressure levels and must
be repressurized.
The first pressure-relief stage is effected by connecting
the adsorber in question with another adsorber already at the
lower -p.l~ssure level characteriæed by the first pressure-~elief
stage, i e. by equallzation of pressure between the two
adsor'u*rc;. Naturally, the adsoLber initially at the lower
press~lre tllereby attains a higher pressure as part of its
repressuri.zation s~age.
. In this manner each pressure-relief stage and each
repres3urization stage can be effecte~ by pressure equalization
between adsorbers.
In the last pressure-relief stage, gas is withdrawn as
residual gas and this pressure-relief stage can be followed by
a cotmterflow purging of the adsorber to eliminate as best as
possible the adsorbed components from the adsorptive medium.
The subsequent repressurization phases are then carried
out for the most part by pressure equalization with othe~ ad-
sorbers at high pressure with thR last repressurization stag~
eff~cted to the adsorption pressure w.ith product gasO
llZ75iS~
699
In such installa~ions, the durations of the individual
phases within a cycle may be o the order o seconds, while ~he
total cycle betr~een readiness for the adsorpt~on phase to a
repetition of such readiness, may be of the order of several
minutes.
As a result of the high speed at which thP pressures and
gas flows must be changed over for the numerous phases o each
cycle and between adsorbers~ the system can be deemed to be
under considerable stress. In other words, the high sequencing
and alternation speeds place significant scrain upon the oper-
atlng meNbers such as valves, and even static m~mbers such as
conduits and fittings. The problem is increased by the prac-
tical require~ent that the system operate without maJOr replace-
ment or modification or periods of up to ten years in a more
or less continuous manner.
en such systems are constructed for long-term
operatlon, it is found that despite the most effective choice
of d~s~gn, varlous failuxe problems arise primarily as a result
- of ~ arial fatigue or wear. As a result, adsorbers, valves
and e/ n the ducts connecting the adsorbers with one another,
the v~lves with one another, or the adsorbers with the valves,
can ail and result in detrimental conditions within the system
manifested, for exa~ple, by pressure losses and leakageO For
example, the valves, ducts or adsorbers ~ay leak pressurized
gas to the environment or valves may leak pressurized gas into
unpressurized regions, etc~
In conventional installations of the aforedescribed type
it is frequently required to brlng the entire installation to
standstill so that the components can be checked and tested,
efects ascertained and failures replaced, repaired or modifled
55~'
11~99
before the system is again placed :Ln operationO The downtimes
which this approach necessitates are significant economic disad-
vantages but are even more d~rir~ntal ~han can be mea~ured by
the loss of operating tlme, since installations of the type
described are frequently provid~d in adsorption systems in
which the recovered fractions of the original or incoming gas
must be obtained in substantially constant quantities practi-
cally continuously for other units making use oE these fractions
or for distribution to consuming lnstallationsO
Objects of the Invention
It is, therefore, the principal object of the present
invelltion to provide a method of operating a pressure-swing
adsorber installation whereby the disadvantages of the earlier
system mPntloned above can be obviated and an improved operating
effie~ency and continuity obtained.
~ nother o~ject of the invention is to provide an improved
method oE operating a multiadsorber pr.essure-swing adsorption
sys ee~ ch permits rapid detection of a failure and repair or
replace~ent without terminating the output of the installation
in sp~te of the unavailability of normally operating ~omponents.
Yet another object of the invention is to provide an
improved method of operating an adsorber system, utilizing
pressure-swing adsorption techniques, which affords a continuous
output notwithstanding possible failure of componen~s of the
system. -
~lZ7S5'7
11~ 99
Summary of the Inventio_
These objects and others which will become ~pparenthereinafter are at~ained in an improved metho~ of operating a
-- pressure-s~/ing adsorber installa~ion comprising a multiplicity
of adsorbers capable of undergoing, in a given operating cycle,
adsorption at an elevated pressure, a plurality of pressure
relief stages and ultimate purging, and a repressurization
phase, the installation having valves for selec~ively connecting
the adsorbers so that at least in part the pressuri~ation and
pressure relief phases are effected by connQcting each adsorber
with one or more ~her adsorbers at higher or lower pressure
levels in the respective cycles of operation.
According to the invention, the adsorbers and/or the
valves o the pressure-sw;ng adsorber installation are assigned
measuxable physical parameters which are cont~nuously monitored
and, UpO}I the development of differences between sPtpoint values
for these parameters and actual values thereof, a determination
is ma~e that a particular element (adsorber, valv~, conduit
lengt~3 is de~ective. The deEective element of the apparatus is
blocked and the operation of the remaining adsorbers is modified
in sucl~ m~nner tl~t the adsorbe-s in part are cycled through the
respect-Lve phases and in part are held in certain phases with
redistribution of the function of the isolated ele~ent until all
of the re~aining adsorbers can be cycled identically through
corresponding phases, thereby maintainlng the output continuity
of the installation.
For carrying out the process of the present invention,
each of the valves of the p~essure-swing adsorption installation
can be provided with a setting indicator whlch signals the po-
sition of the valve. If the signal setting d~es not coincide
55~
ll~9gwith the setpoin~ se~ing~ an output si~nal is triggered ~o
constitu~e a failure aler~ which can be used to automatically
closP off the defective elei~ nt. The settLng si~naler thus
clearly indicates a deEective valve and has, therefore, an
- importan~ advan~age although i~ is not capable of signaling a
; valve failure in the fo.rm of leakage past ~h~ valve seat.
Such leakage failures are, of course, of a nature that
their effects are readily noticeable although the failures
themselves are difficult to ascertain since the valves usually
communicate with adsorbers or ducts to which otner adsorbers,
valves and duc~s connect and hence isolating a ~ailure result-
ing from valve leaXage has been difficult heretofor~O
The system of the present invention enables even these
failures to be rapidly detected and localized~
According to the invention, a sealing defect in a valve
whicn resul~s in a change in the pressures upstream and down-
strec..,T, of the sea~ of the expected values is provided with
detectvrs for these upstream and downstream pressure stages
res-~cti.vely and these detectors provide signals which are com-
pared with setpoint values.
Upon deviation frorn the setpoint value the location ofthe defective valve can be signaled.
According to the invention, these sensors are commutated
or scanned by the monitoring system in th~.-sequence and cadence
of the valve operation or at a higher rate with the output being
monitored by logic circuitry capable o discriminating indi-
vidual failures from the collected data for all of the valvesO
Since the systen. of the present invention monitors at
least one physical parame~er of each element wnich might be
defective for the comparison with the setpoin~ value ~entioned
~75~7
earlier,the scanning of commuta-ting system rnay be used,together
with appropriate logic circuitry,not only for the pressures up-
B stream and downstream of each valve ~ but also for the otherparameters,ie.valve setting or parameters characteristic of effeG
tlve adsorber operation.
For example,the parameters of adsorber operation may be a
pressure in the adsorber,e4 an absolute pressure,a pressure chang~
~ difference in pressure between phases)or a variation in pres-
sure with time,depending upon thenature of the pressure-swlng pro-
cess and the pressure-monitoring means of available or desirable
or whichever pressure measuremen-t is most significant.Additionally
the difference be-tween adsorption and desorption pressures is of
importance in the type of measurement as well.
For example,i-t is possible to obtain a prede-termined pressure
chan~e by automatic control of a valve within a predetermined time
In this case the pressure may be monitored in part by the change
in valv~ setting with time or by monitoring the position of the
valve at a predetermined point in the cycle.
Pr~ssure-swlng adsorption systemscan also operateso thatin-
dividual phase changes,i~ valve alternations,do not occur inaccor-
dance ~i~l a predetermined time plot,but rather in accordance
with a pressure plan. In this case valves switch over whenthe pres-
sure inpredeterminedportionsof theapparatus,for exampleinthe ad-
sorbers vrtheir connectingducts,attain predeterminedvalues.Thus,
since thevalve characteristics are ~now~ onecanmonitor thetime u~
til valvechangeover orfrom avalve switchoverand comparethis with a
setpoint valueof thetime. Here againthemonitoring of aparameter,
namely time~ allows thepressure conditionsto be ascertained and a de-
fective state detected.
Thus,when referenceis madeto anoperating parameterin thebroad
sense itmust beunderstood thatnumerous processparame-ters areinter-
dependent andthatit i5 impossibleto monitor any ofthem tocontrol
~12~5t~7
any other or determine whether a particular element oE the system
maybedefective Furthermore, -the monitoringsystemmayreflectsi-
multaneous use of aplurality of parame-ters, generally time~ valveposi-
tion and pressure.
~ccording to the invention, in a best mode thereof, the pressure-
-- - swing adsorber i nstallation is opera-ted in accordance with a predeter-
mined time plan or schedule~ ie. switchover is effected at predetermined
times during each cycle for each adsorber and the cycles of -the multipli-
ci-ty of adsorbers are synchronized with one another. In this case it has
been found to be especi ally advantageous to use the pressure in the ad-
sorbers and/or in the conduits connected thereto as the physical para-
meter to be moni tored and as the basi s for detec-ting def ec cive valves
In principle, a valvewhich has lost its seal can result inhigher
or lower pressures than the setpoint pressure. mus when actual or
measured pressure exceeds the setpoint pressure for the precise point
in time or monitoring procedures~ a defective valve is signaled for all
valves whi ch are disposedbetween the measuring location or the adsor~
er at which the pressure is measured and all apparatus elements at which
a higher pressure prevails~
Natu:r;llly~ when the deviation from the setpoint value is down-
ward, a defective valve is signaled for any value which is disposed
between the measuring location and apparatus elements at which a
lower pressure prevails.
By monitoring the pressure in successive phases of the same or
associated adsorber and in other adsorbers which from time to time
are connected with the adsorber monitored as described, a comapri-
son between actual value and setpoint value can be made over a portion
of a cycle or several cycles to enable detection and isolation of the
single defective valve causing the deviation from the setpoint
value in either direction.
_y_ 1,
I
llZ~SS7
Brief Description of the Drawinq
The above and other objects, features and advantages
of the present invention wll] become more readily apparent from
the following description, reference being made to the accom-
panying drawing in which:
FIG. 1 is a plant schematic of a pressure-swing ad-
sorber installation having nine adsorbers operated in accord-
acen with the method of the present invention, the assOciated
valves and the conduits thereof in accordance with the presen-t
invention;
FIG, lA is a block diagram illustrating a monitoring
system which can be used in accordance with the preseni invèn-
tion;
FIGS, 2 and 3 are sequence diagrams illustrating the
~ ~p~rl D~ ~D~
various modes of o_~ra~ion ~$r the adsorbers of FIG, l;
FIG, 4 is a diagram similar to FIG, 1 of a six-adsorb-
er systerrl in accordance with the invention; and
FIGS. 5 - 7 are timing diagrams showing the sequencing
relationships for various aspects of the operation of the system
of FIG~ a.
Specific Description and Examples
In the following description, reference will be had to
FIGS, 1 and 4 showing pressure-swing adsorption plants with nine
and six adsorbers respectively and illus-trating how, upon defect
or failure of one of the adsorber elements, or more, the system
compensates to maintain continuity of output,
For convenience, similar reference numerals have been
used in both Figures and naturally identical reference numerals
refer to identically functioning parts,
_10--
1~75t~7
For each adsorber assigned a single-digit reference
numeral 1, 2, e-tc. the associated valves have been designated
by two-diyit members with the first digit corresponding to the
adsorber number in questiOn. Thus -the valves associated with an
adsorber 1 are valves 11, 12, 13, 14~ 15, 16 and the valves as-
sociated with adsorber 2 are 2-, 22, 23, 24, 25, 26, etc. Ancil-
lary valves have been given hundreds numerals.
FIG. lA is applicable to the system of FIGS. 1 - 4 and
generally illustrates the monitoring principles involved.
~IG. lA, more particularly, shows a possible monitor-
ing system in accordance with the invention, it being understood
that any conventional commutating, pressure-monitoring or time
arrangement may be used.
In the embodiment illustrated, however, a valve se-
quencer 31)0 is shown to be connected to each of the valves of
the pre~S!lre-Swing adsorber installation, only valves 11 and 14
being sh~hn in FIG. lA for the adsorber 1 Like the other
valves tn t:he system, these valves are electromagnetically or
servo-ac-tuated as represented by the coils 311 and 314 which
act UpG~ ~iagramma~ically illustrated armatures or valve mem-
bers 3:11' and 314~, respectively. Each of the valve members
can be c~nnected to a position sensor 301,~302, e.g in the
form oE a linear differential transformer whose output can be
digitalized by any conventional means (see SERVOMECHA~ISM PRAC-
TICE, McGraw-Hill Book Co., New York~ ~Y 5 1960, pp 44ff) to pro-
vide inputs to the monitoring circuit 303~ The latter can be
any conventional commutator or distributor system feeding a
single actual-value signal to a comparator 304 for comparison
with a corresponding setpoint signal from a setpoint monitor or
memory 305, the monitor and memory being addressed by the
central processor 306 (see shapter 4, pp 453 etc. of HANDBOOK OF
TELEMETRY AND REMOTE CO~TROL, McGraw-Hill Book Co.~ New York, ~Y
~11-
llZ~557
1967). In other words, each position of each valve member is
monitored sequen-tially and compared with the associated set-
opint value, predetermined for the process relationship, with
the comaprator 304 feeding the result into the logic circuitry
307 for display at 308 of the value identification for any valve
whose setting deviates from the associated setpoint value.
As poin-ted out in the H~DBOOK OF '~ELE~TRY A~D REMOTE
CO~TROL (op. cit.), the CPU 306 can be controlled by a clock 309,
i.e. a clock pulse generator, assuring synchronization of the
detection and the comparison and the operation of the logic cir-
cuit to display the appropriate defective vaIve. ~aturally, the
logic circuit 307 can also operate the controller 310 to cut out
a defect:ive portion of the adsorber installation and the valve
sequence 300 which, via line 321, is also synchronized by the
clock 30~.
; In addition to the valve-position detectors, each
valve 11, 14 .~. is flanked by a respective pair of pressure
sensorS lla~ ; 14a, 14b; ... which are digitalized pressure-
-electrical transducers whose output signals are delivered to
the mon~tor 303 for comparison in the appropriate sequence co-
ordicated with the valve switchovers, with setpoint values from
unit 305~ Here again any defect in a particular valve is ascer-
tained by comparing the high-pressure and low-pressure values on
opposite sides of a closed valve with the appropriate setpoint
values at any predetermined point in time of the operation of
the apparatus.
A further pressure sensor la, whlch may be the same as
a valve-flanking pressure sensor, can have its output connected
to the monitor to provide a signal representing the actual pres-
sure in the respective adsorber. Here again a setpoint value
stored which is recalled from the memory and compared with the
assigned actual pressure value of the adsorber apprOpriate to
-12~
llZ~S57
the particular po1nt in the opera~ing sequenc~ for indicating
on the display 308 any adsorber ~ailure.
~ihether the failure is an adsorber failure or a valve
failure or a duct ~ai1ure, the faul.ty unit can be cut out of
the system by triggering appropriate valves automatically or
manually.
FIG. 1 shows a nin~-adsorber system in accordance with
the present invention with a nor~al operating scheme represented
by the sequence diagram of FIG. 2.
Crude gas is delivered via line 107 to the adsorber 1
with va~ve 11 open so that the more readity adsorbed components
are retairled on the adsorbent medium while the less readily ad-
sorbed components pass through the adsorber via valve 12 and are
dischar~ed through line 104 as a product ga3.
~i~ the end of the adsorption phase, the crude gas is
switch~d to another adsorber, in the embodiment illustrated to
the ad~scber 4, and the pressure in adsorber 1 is reduced to
a fi7~ i; intermediate pressure E(L). In FIG. 2, the operating
cycl~ Eor each adsorber is shown to orcupy 13 time frame periods
2~ or s`~tS~ the fi.rs- six of which are occupied by the adsorption
phase whlt~h is followed by the 7th time stage in the :Eorm of a
reduct.ion in pressure to the first intermediate level Et in the
seventh time stagP. This reduction in pressure to the first
inter~ed~ate level El is e~fected by pressure equal;zation with
the adsorber 5 upon the opening of the valves 15.and 55.
ThereaEter, the pressure in adsorber 1 is dropped to a
second intermed-ate pressure (E2) by pressure equalization with
adsorber 6 via valves 16 and 66 and then to a third intermediats
pressure (E3) by pressure equalization with adsorber 7 via valves
16 and 76. During this pressure reduction in adsorber 1, the
pressur~ ln adsorbers 5, 6 and 7 are respectively raised to
higher l~vels Bl,B2 and B3 in the 7th,8th and 9th time stages.
557
Thereaft~r, the pressure in adsorber 1 is dropped ~urther
in the fo~rt~ pressure-rel-ef s~age ~4 hy opening valves 13,~3,84.
At ~his point, the gas form t~e adsorber 1 flows tnrough ~he ad-
sorber 3 as a p~lrging or sparging gas for ~he la~ter adsorber
. . which is in its final stages of desorption. For the adsorber 8,
therefore, this corresponds to th~ purging phase S2 in the 10th
ti~s frame o~ the adsorber cycle illustra~ed in FIG. 2. The re-
sulting gas mixture of purged gas and dasorbed components,passes
via line 105 into ~he pressure-compensating and equalizing
vessel 1()1.
In the 11th time rame of the adsorber 1 ~ valv~s
83 and 34 close and valves 93 and 94 open to establish the 5th
pressure relie phase E5 in which gas from the înterstices OL the
adsorption medium in adsorber 1 passes as an in;.tial purging gas
through the adsorber 9 (purging stage Sl) before 10wing into
line 1~5~ Both purging stages are effected by passing the
purgirlg gas in counter10w to the passage of the gas during the
adsorption stage.
In ~he 12th time frame, valves 13~93 and 94 close and
any resldual gas in adsorber 1 is vented through valve 14 as a
residual gas into ~k~ vessel 101 to complete the depressuriza-
tion of the adsorber 1 (stage E6) and prepare the adsorber for
the purging.
In the 13th time frame, the initial purging Sl is car-
ried out by connectng adsorber 1 with adsorber 2 which is
still under an elevated pressure (in its stage E5 as the diagram
of FI~. 2 shows, corresponding to its time frame i-ll) via opened
valves 23,13 and 14. The purge gas and sparted desorbed gas flows
via line 105 into the vessel 101.
In the 14th time frame the adsorber 1 undergoes 2nd
stage purging S2 by closure o~ valve 23 and opening of valve 33,
1~275'~7
so that adsorber 1 receives the purge gas in the counterflow
clirection from adsorber 3 which is then in i~s 4th expansion
stage E4 and its tenth time frame. ~gain ~he purged gas is
discharged ~nto vessel 131.
'rhe purging stage is followed by a repressurization
stage of our phases.
~ lore specifica-lly, in the 15th time frame of the cycle
o~ adsorber 1, valve 14 is closed and valves 46 and 16 are
opened tv eclualize prssure between adsorber 4 in its third
lV pressu~e relief stage E3 which corresponds to the first repres-
surizati~n stage B3 of adsorber 1.
~ the 16th time frame, adsorber 1 is brought to the
2nd repressurization stagre B2 by closure o valve 46 and opening
of valv~ 5~ to relieve the pressure in adsorber 5 (correspc>nding
to its ~.d pressure relief stage ~2) by pressure equalization
; with a~s~ r 1.
T~e 17th ti~a fraMe results in a pressure equalization
between alsorber 1 ~or its third repressurization phase Bl, via
open va~ves 65 ancl 16, with the adsorber 6 in its initial pres-
sure relief stage ~1, valve 5S being closed.
The las~ pressure increase to tl~ stage B of adsorber 1
is effected by product gas at the ac~sorption pressure branched
- 15 -
llZ~S57
of~ ~rom J.ine 102 by opening the valves 102 and 15. Adsorber
1 is thus ready fsr a new adsorption cycle o the '18th time
fra~e and phases just desc-ribed.
The above-described program of valve operations results
from the programming of the valve sequencer 300 and the control
of the clock 309 and can be effected automatlcally~
The adsorber numbers are given alon~ th~ ordinate in
th~ diagram of FIG. 2 and for a given refer~nce tirne frame
~ along the upp~r horizontal row o the table of this
figure~ the co-rresponding phases are given together with t~e
time frame number from 1-18 starting with 1 for the commencement
of the cycle of each adsorber~ FIGS. 3 and 5 through 7 are
diagrams similar to FIG. 2, except that the diagra~s o FIGS.
5 th ~o~gh 7 relate to the operation of the 6th adsorber system
of FI~,I, 4.
From FIG. 2 it will be apparent that three adsorbers
are coittlnuously in an adsorption phase although offset from
one al~other by two time frames so ~'nat a~ any point in time
each adsorber only receives one third of the crude g~s which
is being processed. The output is, however, continuous.
Naturally each oE the adsorbers is normally sequenced
as has been described for adsorber 1. T'ne only dif~erence
between the sequencing o~ adsorber 1 and adsorbers 2 through 9
is a time offset as the diagram of FIG. 2 shows.
- 16 -
LlG99 llZ75S7
In the example of FIG. 1, nine adsorbers are usecd in the
absenGe of a defect or failure, the adsorption stage being
effected over six time slots of the cycle and the pressure re-
lief being effected over six time slots and in six distinct
pressure stages El - E6~ The purging requires two time slots
or phases Sl and S2 and the repressurization stages are four
in number, namely, B3, B2, B1 and B, respectively. To demonstrate
the principles of the invention, adsorber 9 is assumed to fail
or tc> be cut out from the system with a revision in the sequenc-
. o ing as represented in FIG. 3.
It is thus possible to define the system in terms of its
phase number j which can be calculated as follows:
j = T - 2 ( i - 1)
. in WhiCll T is the number of time slots or phases ( eighteen in
the case of FIG. 2 and sixteen in the case of FIG. 3) and i
is the number (in order) of the adsorber of the sequence. For
ex;.asr;t~le, i is the adsorber number in FIGS. 2 and 3 since the
nine adsorbers of FIG. 2 and the eight adsorbers of FIG. 3 are
ope:rated in their numbered sequence.
O The maximum number of time slots or phases is calculated
as Eollows:
TMAX = 2nA ~ 2m = 2n
where n = the number of adsorbers,
nA is the number of adsorbers simultaneously operating in
an adsorption stage and
m is the number of pressure stages El . . . . Em.
.
llZ~557
1699
Associated with each phase number j is a pressure
characteristic pj which is a predetermined pressure level. For
the apparatus of FIGS. 1 and 2 ~ith nine adsorbers~ the follow-
ing relationship of phase number and pressure characteristic
can be established ( pressure characteristic ranging from 0,
representing no elevated pressure, to 6 representing the maxi-
mum pressure:
TABLE 1
PHASEPRESSURE PHASE PHASE
10 NU~BERCHARACTERISTIC DESIGNATION DESCRIPTION
j = 1pj = 6 A 1, Adsorption
j = 2pj = 6 A 2. Adsorption
j = 3pj = 6 A 3. Adsorption
j = ~pj = 6 A 4. Adsorption
j - 5 pj = 6 A 5. Adsorption
j a 6pj = 6 A 6. Adsorption
j 7 pj = 5 El 1, Pressure Relief
; j ~ 8pj = 4 E2 2, Pressure Relief
j = 9pj = 3 E3 3, Pressure Relief
20 j = 10pj = 2 E4 4. Pressure Relief
j = 11pj = 1 E5 5, Pressure Relief
j = 12pj = 0 E6 6. Pressure Relief
j = 13pj = 0 Sl 1, Purging
j = 14pj = 0 S2 2. Purging
25 j = 15pj = 2 B3 1. Repressurization
j = I6pj = 3 B2 ~ 2. Repressurization
j = 17pj = 4 Bl 3. Repressurization
j = 18pj = 5 B 4. Repressurization
- 18 -
llz~scj7
`699
As can be seen from FIG. 1, each adsorber is associated
with six valves, namely~ three valves for pressure equalization
and one valve each Eor crude gas entry, product gas discharge
and residual gas ven-ting. The valves are opened by sequencer
300 in the following relationship:
TABLE 2
. ~
VALVE FUNCTION - OPENING AT j =
.
Vil, Vi2 Crude gas inlet/product gas 1 to 6
outlet
Vi3 Pressure relief/purging 10, 11, 13 and 14
Vi~ Venting residual gas/purging 12, 13 and 14
Vi5 First pressure relief/third
equalization and product feed 7, 17 and 18
Vi'i Seond and third relief/firs-t
and second equalization 8, 9, 15 and 16
(i number of adsorber)
_ . . ~ . . . . . _
- The valves Vil - Vi6, of course, are correlated with the
correspondingly numbered valves 1 through 6 of each adsorber,
i.e. the valves 11 - 16 of adsorber 1 and the valves 71 - 76
of adsorber 7 by way of example.
As can be seen from Table 1, for the adsorber 1 of FIG.
- 1, with time slots T over 1 - 18, the following pressure
characteristics pj apply:
- - 19 -
.
~lZ75~i7
ig9
TA13LE_3
_
T 1 2 3 4 5 6 7 8 910 11 12 13 1415 16 17 18
pj 6 6 6 6 6 6 5 4 32 1 0 o 0 2 3 4 5
.. .. _ _ . . _
Correspondingly,the operation of the valves must provide
after valve pressures represented by the pressure characteristics
PV as represented in Table 4:
TABLE 4
. . . _ . . _
~:r 1 2 3 4 5 6 7 8 9 10 11 12 13 1~ 15 16 17
Vi~ 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
Vi3 ~ 2 .l 2 1 2 1 2 ~ 2 1 2 1 2 1 2
. Vi~l 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Vir, 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
- Vi.~i 3 4 3 4 3 4 3 4 3 4 3 4 3 4 3 4 3
__
It will be seen from the foregoing that each valve at
each phase of the pressure swing cycling of the respective adsor-
ber is associated with a characteristic discernible pressure
which will deviate from the predetermined pressure if the valve
leaks or is defective.
A defect in the sealing of the valve produces a pressure
differential between the valve afterpressure (characteristic Pv)
- 20 -
;
ll~S~7
699
:
. ~
and the valve forward pressure (i.e. the adsorber pressure re-
presented by the pressure characteristic pj), which are directly
measurable, e~g. with the system of FIG. lA, to indicate a pres-
sure deviation from the set point value at the end of each phase.
The monitoring system can be sequenced so tha-t these deviations
are detected only for those phases or time slots in which a
pressure equalization occurs between two closed volumes (for
example at j = 7, 8~ 9, 15, 16 and 17).
The pressure differential at a valve ~p is defined by
P Pv ~ Pj '
10 ~hell a failure arises L p deviates from 0 with ~p being greater
than 0 when gas flows into an adsorber through a leaking valve
and is negative when gas flows out of the adsorber through the
leaking valve.
The pressure deviations from 0 can of course represent
15 a defect in any one of a number of valves at any particular
point in the operation of the system. To localize the defectlve
valve, therefore, it is necessary to monitor the operation for
a given adsorber over at lest a number of phases of the cycle~
using, for example, a particular adsorber as a reference with
20 which the monitored adsorber is connected in pressure equaliza-
tion. Naturally, any adsorber at any point in the monitoring
; can be the reference adsorber and the choice of the two adsorbers
-21-
~ .
.,.` .
112~557
1699
for the reference and test purp~es can be made from the dia-
gram of FIG. 2 which shows the adsorbers connected for pressure
equalization in accordance with the sequencing program previously
described.
The detection of a failure is exemplified by the following:
Example 1
In an apparatus as shown in FIG. L using the time sequenc-
ing of the valves and adsorbers represented in FIG. 2 with six
pressure stages ( m = 6) a low pressure is detected in time slots 7.
In other words a detector system of the type shown in FIG. lA
- has at its pressure sensor la a pressure value which is less
than the corresponding set point pressure from the set point
gernerator 305 so that the comparator 304 signals this effect.
In the sense of the previous definition, this deviation is
o~ a negative value.
To identify the defective valve which has brought about
this neyative deviation, the following considerations ap~ly:
From l'able 3 is is apparent that the adsorber 1 at j = 7
shou]d have a pressure characteristic pj = 5. The possible
failure of one of the valves associated with adsorber 1 can
only lie in a valve having a pressure characteristic PV less
than 5. From Table 4, for the time slot 7, this is the case for
valves Vi3, Vi4 and Vi 6, i.e. valves 13, 14, and 16 in the case
of adsorber 1. This applies, of course, also to the valves
associated with the adsorber which is brought into pressure
.
- 22 -
., ` .
5'~
1699
equalization in tirne slot 7 with t:he adsorber 1, namely, ad-
sorber 5 (see FIG. 2).
The pressure stage jE in which the adsorber 5 is found
upon pressure equa]ization with adsorber 1 can be calculated
. 5 by the previous equations or can be read directly from FIG. 2
and the present case jE - 17.
From Table 4 it is apparent that in time slot 17 valves
Vi3, Vi4 and Vi6 have a pressure characteristic Pv below 5. Thus
:` the possible failure can also be found in valves 53, 54 or 56.
In the cycling of these possibly defective valves, there
are those which are connected with pressure relief ducts (for
- ex.~nple the valves Vi5) and those which are associated with
-.: adsorbers which ~re in time slot 7 of adsorber 1 for a lower
pres.sure characteristic pj than 5. This can be determined, of
co~?.rse, by calculation or from FIG. 2.
l;`or adsorber 2, for example, in the time slot T - 7,
1 ~ 2, the phase number i is 5 so that the pressure characteris-
t.ic pj equals 6 for this adsorber as can be ascertained from
Table 1. This means that the valves of adsorber i are not
defective.
The logic circuitry makes corresponding comparisons
for all of the adsorbers and-from these comparisons it can be
shown that the additional valves 65, 75, 85 and 95 might pos-
sibly be defective. Thus the defective seal resulting in the
~5 fall of the pressure in adsorber 1 below its set point value
.: must be found in one of the valves 13, 14, 16, 53, 54, 56, 65,
` 75, 85 and 95.
. .
~ - 23 -
- , ' ~
llZ~5iS7
11699
With further cycling of adsorber 1, corresponding cal-
culacions are made and the number of possible valve failures
is reduced, i.e. the list is progressively narrowed, especially
when the negative deviation -turns into a positive deviation with
further cycling. For example, if in time slot 17 the adsorber
1 develops a higher pressure than its set point value (positive
deviation) a list of possible valve failures can be derived ana-
loyously to the foregoing.
The pressure characteristic of adsorber 1 in time slot
17 from Table 3 is p = 4. If a positive deviation is detected,
all valves are suspect which have a pressure characteristic Pv
greater than 4. From Table 4 these can be seen to be valves
Vil~ Vi2 and Vi5. Valve Vi5 is immediately eliminated because
during this phase it is open so that suspect valves are only
valves 11 and 12~
During this phase~ moreover, the adsorber 1 is in pres-
sur* e~ualization with adsorber 6, rendering valves 61 and 62
suspect and since the pressure relief duct is connected via
optn valve Vi5 and is used by adsorbers 7, 8 and 9 simultaneously,
valves 75, 85 and 95 are also suspect.
The suspect list is thereby narrowed to valves 75, 85
and 95 since only these valves appear in the lists obtained with
both positive and negative deviations.
.To determine which of these three valves is defective,
;~5 the pressur~`s are monitored in the other adsorbers and, for
example, it can be determined by a positive deviation of the
pressure in adsorber 9 in its time slot 8 that valve 9S is
defective.
.
- 24 -
~lZ~C357
This method of eliminating nondefective valves
or ascertaining the defective valve from the suspect sets
can be summarized as follows:
First negative deviation in adsorber 1 in time
slot 7, suspect valves: 13, 14, 16, 53, 54, 56, 65, 75,
~5 and 95.
First positive deviation in adsorber 1 in time
slot 17, suspect valves: 11, 12, 61, 62, 75, 85 and 95.
A first positive deviation in adsorber 9 in time slot 8,
suspec-t valves: 91, 92, 51, 52, 95, 55, 16, 26, 36 and
- ~6.
The defective valve is thus clearly identified
as 95 since only this valve is present in all three sets.
The method of the present invention for deter-
mining the failure in any system of n adsorbers can be
carried out automatically by a special purpose computer
whose memory contains the tables and the set point values
with any suspect valves being registered from cycle to
~ cycle and the final determination made by logic circuitry
,~ 20 through conventional AND gates selecting the common member
of all suspect sets.
Once the defective valve is identified, the ad-
sorber associated therewith is cut off from the system by
; closing all of its associated valves and by closing manual
valves which can be provided as ancillary shutoff devices
although these valves have not been shown in the drawing.
This naturally eliminates any further problem with the
defective valve.
With an adsorber installation having n adsorbers
of which nA are simultaneously operating in the adsorption
stage and wherein m pressure stages are provided, the total
number of time slots or phases is given by the relationship
- 25 -
557
699
T - 2nA+2m as previous]y stated. The time slo-t number for an
¦ adsorption phase is 2n~.
When, as a result of the cut out of one or more adsorbers,
e.g. a total of x adsorbers, the new phase count or number of
- S time slots T ~ 2nA ~ 2m - 2x. Thus if -the number of pressure
stages m is retained, the maximum number of adsorbers which can
be cu-t out while re-taining continuity of operation is nA ~ 1.
To permit the same gas flow to be cleaned, the adsorption stage
rust be reduced to 2(n~ - x) time slots.
The product yield is dependent upon the number of pres-
sure stages m. With shutdown of x adsorbers without changing the
num~er of pressure stages m, the installation can have the same
procl~.ct yield as with the fùll number of adsorbers. Further-
more, with the adsorption time reduced as noted, the original
out,put of -the produc-t gas can be maintained, of course with a
mor- rapid cycling.
Upon blocking oE a defective adsorber and the modifica-
ticn of the time slot number in accordance with the new sequence,
the~ following steps are taken:
0 1. The faulty adsorber is isolated or blocked by clos-
ing all of its associated valves as illustrated and, in addition,
;; by additional manual valves.
.:.
2. Upon cu-t out of the adsorber i in a time slot j of
B even numbers, all of the adsorbers of numbers up to(i ~
are operated two further time slots in their original pro-
gram and, when j is an odd number, the adsorbers up to
- 26 ~
llZ~S57
11699
1 are operated two further time slots or phases
- in thelr original program.
All other adsorbers are held in their time slots or phases
at whcih they were at the time of detection and blockage of the
defective adsorber i. After these two time slots or phases~
all of the adsorbers are operated with the new sequence which
can be established by automatic programming of the valve sequencer.
During the resynchronization operation, pressure equali-
zation or transfer betwen two adsorbers is normally carried out
but for those adsorbers which are temporarily inactive or are
to be subject to maintenance, gas can be vented by additional
valires at respective vent ducts.
3. The volume of the crude gas per adsorber to be
cLe.-~ned is kept the same as its original value during the two
synchronization time slots and thereafter is raised by a factor
nA
n ~ x
A
s~ that the installation has the original product output.
~o minimize loss of the product it is possible even during
the two syncnronization time slots to increase rate of feed of
the crude gas to the adsorbers, especially when the latter are
operating at less than peak capacity. The maximum product loss,
however, extends only over four time slots.
The following examples are illustrative of these points:
Exam~le 2
~5 With a pressure swing adsorption in~tallation having nine
- 27 -
llZ75i57
1699
; adsorbers as shown for example in FIG. 1 and the sequencing
of FIG. 2, a failure of a valve func-tion ls detected in adsorber
1 in time slot 9.
Adsorber 1 is cut ou-t of the system and the installation
is resequenced ~r eight adsorbers, Thls resequencing has been
illustrated in FIG~ 3 and, as is apparent, has only two adsorbers
simu:Ltaneously in adsorption stages. The number of adsorption
time slots is reduced from 6 to 4.
In the following Table 5, the time slot numbers of the
ind~fidual adsorbers are given with the second column represent-
ing the state upon cut out of adsorber 1. The third and fourth
columns show the synchronization process and the fifth column
the resynchronized process which represents the starting point
of t--e eight adso~ption program of FIG. 3.
. . .
lS TABLE 5
Nine-Adsorber Program Pro ram
. . . ~ ., _ . _ . .
Ads~ No. Phase No. Phase No. Phase No. Phase No.
. 1 9 -- _ _
2 7 8 9 7
3 5 6 7 5
, 4 3 4 5 , 3
1 2 3
6 17 17 17 15
7 15 15 15 13
8 13 13 13 11
9 11 11 11 9
.. . _.
- 28
1699 11~ 7
, .
The relief gases of adsorber 2 in time slots 7 and 8
during the synchronization are vented via the additional valve
- 115, 116 (FIG. 1) since the corresponding adsorbers 6 and 7
terstwhile time slots 17 and 16~ respectively) are retained
against secIuencing.
- Example 3
A six adsorber se-t up is shown in FIG. 1 for a pressure
change adsorption installation. This system is operated in ac-
cordance with the sequence diagram of FIG. 5. If it is assumed
~10 that a failure occurs of a valve in time slot 8, the resulting
adsorber is cut out and the system is resecIuenced for five ad-
sorbers as shown in FIG. 6. The synchronization is represented
~ in Table 6.
.~ TABLE 6
15Six-Adsorber Program Eight-Adsorber Program
: Ak.;~ o. Phase No~ Phase No~ Phase ~o. Phase No.
.~ ~3
,. 2 6 7 8 6
. 3 4 5 6 4
4 2 3 4 2
- 5 12 12 12 10
.: 6 10 10 10 8
.. . _ . ... ..
The vented gas from adsorber 2 passes via valve 115 at
time slot 7 (see FIG. 4).
- 29 -
55'i'
1699
Example 4
The appara-tus shown in FIG. 4 with six adsorbers has
failures of adsorbers 2 and 3 in time slots 9 and 7, respectively. -
The result is a resequencing for four adsorbers as shown in
~ FIG. 7. The synchronization process is illustrated in Table 7
- ~ and takes twice the number of time slots as the previous resyn-
chronization.
. TABLE 7
. .
Six~Adsorber Five-Adsorber Four-Adsorber
. Program Program Program
.- Phase Phase Phase Phase Phase Phase Phase Phase
: . No.No. No. No. No. No. No. No.
... .
1 11 11 11 9 9 9 7
2 9 - - _ _ _ _
3 7
4 5 6 7 5 6 7 5
` 5 3 4 5 3 4 5 3
1 2 3 1 2 3
~ .
.
- 30 -