Language selection

Search

Patent 1236445 Summary

Third-party information liability

Some of the information on this Web page has been provided by external sources. The Government of Canada is not responsible for the accuracy, reliability or currency of the information supplied by external sources. Users wishing to rely upon this information should consult directly with the source of the information. Content provided by external sources is not subject to official languages, privacy and accessibility requirements.

Claims and Abstract availability

Any discrepancies in the text and image of the Claims and Abstract are due to differing posting times. Text of the Claims and Abstract are posted:

  • At the time the application is open to public inspection;
  • At the time of issue of the patent (grant).
(12) Patent: (11) CA 1236445
(21) Application Number: 1236445
(54) English Title: PNEUMATIC DEICER AND DEICING METHOD
(54) French Title: METHODE ET DISPOSITIF PNEUMATIQUE DE DEGIVRAGE
Status: Term Expired - Post Grant
Bibliographic Data
(51) International Patent Classification (IPC):
  • B64D 15/18 (2006.01)
  • B64D 15/16 (2006.01)
(72) Inventors :
  • ELY, DUAIN N. (United States of America)
  • MACARCHENIA, JOSEPH H. (United States of America)
(73) Owners :
  • GOODRICH (B.F.) COMPANY (THE)
(71) Applicants :
  • GOODRICH (B.F.) COMPANY (THE)
(74) Agent: NORTON ROSE FULBRIGHT CANADA LLP/S.E.N.C.R.L., S.R.L.
(74) Associate agent:
(45) Issued: 1988-05-10
(22) Filed Date: 1983-09-21
Availability of licence: N/A
Dedicated to the Public: N/A
(25) Language of filing: English

Patent Cooperation Treaty (PCT): No

(30) Application Priority Data:
Application No. Country/Territory Date
431,952 (United States of America) 1982-09-30

Abstracts

English Abstract


PNEUMATIC DEICER AND DEICING METHOD
ABSTRACT OF THE DISCLOSURE
An inflatable deicer boot for mounting on an
airfoil with at least one leading edge tubular member
positioned in the area of the stagnation line of the
airfoil. The boot also has a plurality of upper and
lower inflatable passages on either side of the leading
edge tubular member. In the inflation sequence of the
deicing cycle, the leading edge tubular member is
inflated before inflation of the upper and lower
inflatable passages to crack the ice formed on the
outside surface of the boot at the stagnation line of
the airfoil. The upper and lower inflatable passages
are then inflated to shatter and eject the ice formed on
the boot over the upper and lower inflatable passages.
Means are then provided to deflate the tubular member
for a predetermined time after which the deicing cycle
is repeated.


Claims

Note: Claims are shown in the official language in which they were submitted.


The embodiments of the invention in which an exclusive
property or privilege is claimed are defined as follows:
1. A pneumatically inflatable deicer boot for
mounting on an airfoil, said boot having a leading edge
centerline, said centerline dividing said boot into an
upper section and a lower section, said upper section
and lower section being formed of two piece fabric outer
plys and inner plys sewn to provide a carcass providing
a plurality of upper inflatable passages in said upper
section and a plurality of lower inflatable passages
in said lower section, the fabric supporting air trans-
port within the boot, said boot being characterized by
at least one leading edge, continuously integral, tu-
bular member formed of resilient rubberlike material
with spaced apart edges and including a fabric strip
fastened to a fabric tape backed by a filler member
bridging the edges, the fabric strip having a plurality
of stiff fibers defining a channel; the tubular member
being positioned in the area of said leading edge cen-
terline; and means to substantially inflate said lead-
ing edge tubular member and thence operative to inflate
said upper and lower inflatable passages while maintain-
ing substantial inflation of said leading edge tubular
member for cracking of ice formed on the outside sur-
face of said boot at said leading edge centerline
whereby the ejection of ice covering said upper and
lower sections of said boot is facilitated.
2. An inflatable deicer boot in accordance with
claim 1, wherein said means to inflate said leading
edge tubular member prior to inflation of said upper
and lower inflatable passages includes an air inlet and
outlet opening at one end of said tubular member and
an air opening at the other end with said air opening
in communication with said upper and lower inflatable
passages.

3. An inflatable deicer boot in accordance with
claim 2, wherein said air outlet is connected to a man-
ifold in communication with all of said upper and lower
inflatable passages.
4. An inflatable deicer boot in accordance with
claim 1, wherein said leading edge tubular member has a
bleeder channel and at least one surface of said outer
plys and inner plys has a multitude of minute passages
for facilitating evacuation of air from said boot.
5. An inflatable deicer boot in accordance with
claim 4, wherein said surface is of uncoated fabric with
interstices through which the air may pass during
deflation of said boot.
6. A method of removing ice from a pneumatical-
ly inflatable deicer boot configured for mounting on
an airfoil and having a plurality of spanwise passage-
ways formed of two piece fabric plys sewn to provide
said passageways including a continuously integral tu-
bular member formed of resilient rubberlike material
with spaced apart edges and including a fabric strip
fastened to a fabric tape backed by a filler member
bridging the edges, the fabric strip having a plurality
of stiff fibers defining a channel, located on leading
edge of such airfoil, comprising initially inflating
said tubular member positioned in the area of the lead-
ing edge centerline of said boot for cracking ice, thence
inflating the remaining of said fabric formed passage-
ways for a predetermined period of time after said
leading edge tubular member is substantially inflated
for ejecting ice, deflating said leading edge tubular
member and other inflatable passageways for a second
predetermined period of time and then repeating the cy-
cle starting with inflation of said leading edge tubular
member.

7. The method of claim 6, wherein said leading
edge tubular member and said other passages are inflated
for about four to six seconds.
8. The method of claim 6, wherein a vacuum is
applied to said boot for deflating said leading edge
tubular member and said other passages.
11

Description

Note: Descriptions are shown in the official language in which they were submitted.


~3~
-- 1
PN~UMATIC DEICER AND DEICING METHOD
BACKGROUND OF THE INVENl'ION
This invention relates to p~eumatic deicers of
the type in which a boot of resilient material such
as rubber is attached to the leading edge of an airfoil
and has inflatable passages which are alternately
extended by inflation pressure to break up ice accumula-
tion which tends to form on the surface of the airfoil.
One of the problems with deicers used heretofore,
especially on aircraft which travel at relatively slow
speeds, has been the difficulty'in cracking the ice
cap which builds up at the leading edge. This ice
cap in some cases has remained substantially intact and
has been moved outwardly as a unit when the passages
have been in1ated rather than being cracked to facili-
tate total removal of the ice.
SUMMARY OF THE INVENTION
The pneumatic deicer of this invention provides a
method and deicer construction which cracks the ice cap
at the airfoil stagnation line during the initial part
of the in~lation sequence. This two-step inflation
sequence may be provided by only one air pressure
source and through one air connection so as to minimize
the weight of the deicer and auxiliary equipment which
is-very important on aircraft.
In accordance with one aspect of the invention
there is provided a method of removing ice from an
inflatable deicer boot mounted on an airfoil comprising
. .

~L~36~5
initially inflating at least one leading edge tubular
member positioned in the area of the leading edge
centerline of said boot for cracking said ice, inflating
said other passages for a predeterminedL period of tlme
after said tubular member is inflated for ejecting said
ice, deflating said leading edge tubular member and
said other inflatable passages for a second predeter-
mined period of time and then repeat.in~ the cycle
starting with inflation of said leadiny edge tubular
member.
In accordance with another aspect of the invention
there is provided an inflatableldeicer boot for mounting
on an airfoil, said boot having a leading edge center-
line, said centerline dividing said boot into an upper
section and a lower section, a plurality of upper
in1atable passages in said upper section, a plurality
of lower inflatable passages in said lower section,
said boot being characterized by at least one leading
edge tubular member positioned in the area of said
leading edge centerline and means to inflate said
leading edge tubular member prior to inflation of said
upper and lower inflatable passages for cracking of ice
~ormed on the outside surface of said boot at said
leading edge centerline whereby the ejection of th~ ice
coYering said upper and lower sections of said boot is
facilitated.
To the accomplishment of the foregoing and
related ends, the invention, then, comprises the
features hereinafter fully described and particularly
pointed out in the claims, the following description
.. .
., .

~3~
and the annexed drawings setting forth in detail a
certain illustrative embodiment of the invention, this
being indicative, however, of but one of the various
ways in which the principles of the invention may be
employed.
BRIEF DESCRIPTION OF THE DRAWINGS
In the drawings:
Fig. l is a schematic end view of an airfoil
showing the surface configuration of a deicer boot
embodying the invention during the initial part of the
inflation sequence.
Fig. 2 is a schematic end vie~ like Fig. l showing
the surface configuration of the deicer boot in the
latter part of the inflation sequence.
Fig. 3 is a plan view of the deicer boot with the
position of the inflatable passages, manifold and air
inlet port being shown in dotted lines and parts being
broken away.
Fig. 4 is an enlarged sectional view taken along
the line 4-4 of Fig. 3 with parts being broken away.
DETAILED DESCRIPTION
Referring to Figs. l and 2, an inflatable deicer
boot 10 is shown mounted on a leading edge 12 of an
airfoil 14. In the deflated condition of the deicer
boot 10, an outside surface 16 has a configuration,
shown in solid and dotted lines, which substantially
conforms with the surface of the leading edge 12 of the
airfoil 14. During the inflation sequence of the deicer

~L23!69~
-- 4
boot deicing cycle, a leading edge tubular member 18 is
initially inflated to the configuration of the outside
surface 16 shown in solid lines in FigO 1 to crack the
ice cap which forms on the boot 10. Following the
inflation of the leading edge tubular member 18, upper
inflatable passages 20 and lower inflatable passages 22
are inflated so that the outside surface 16 of the
deicer boot 10 will have a configuration such as that
shown in solid lines in Fig. 2. After th~ leading edge
tubular member 18 and upper and lower inflatable pas-
sages 20 and 22 have been inflated for a predetermined
time, the air is removed from the deicer boot 10 and the
outside surface 16 returns to the configuration shown in
Fiy. 1 in solid and dotted lines. The deicer boot 10
remains in the de~lated condition for a predetermined
time and then the deicing cycle is repeated starting
with the in~lation sequence described hereinabove.
The deicer boot 10 is shown in greater detail in
Figs. 3 and 4 where it is in the condition prior to
installation on the airfoil 14. The deicer boot 10 has
a surface ply 24 which may be of neoprene. The outer
sur~ace ply 24 is adhered to a gum ply 26 of resilient
rubber or other rubberlike material. Fastened to the
gum ply 26 is the leading edge tubular member 18 and a
two-piece outer ply 28 of suitable fabric. The outer
ply 28 is sewn to a two-piece inner ply 30 by stitches
32 to provide a sewn carcass construction with the
upper inflatable passages 20 and lower inflatable
passages 22.
The deicer boot 10 has a leading edge centerline
, . . .

~36~
-- 5 --
34 which divides the boot into an upper section 36 and
a lower section 38 with the lower inflatable passages
22 in the lower section and the upper inflatable pas-
sages 20 in the upper section. As shown in Fig. 4, the
deicer boot 10 is covered by an inner surface ply 40 of
neoprene or other suitable material. The leading edge
tub~lar member 18 may be of fabric reinforced resilient
rubberlike material with spaced-apart edges fastened to
a coated fabric tape 41 which is attached to a gum
filler member 42. A fabric strip 44 is also fastened
to the tape 41 in the space between the edges of the
tubular member 18. The fabric strip 44 has a plurality
of closely spaced elements such as stiff fibers 46
projecting toward an opposing surface of the tubular
member 18 forming a bleeder channel 47.
Tapered fillets 48 and 50 may be positioned
between the inner surface ply 40 and the inner ply 30 to
provide a smooth surface 16 of the boot 10. Also
sealing strips 52 and 54 are provided between the outer
ply 28 and inner ply 30 at the edges of the leading
edge tubular member 18 as shown in Fig~ 4.
An air inlet and outlet opening 56 is provided at
one end of the tubular member 18 which in this embodi-
ment is the inboard end. The air inlet and outlet
opening 56 is in communication with suitable inflation
and deflation means for conveying air under pressure to
the deicer boot 10 and evacuating air from the boot.
An air opening 58 is provided in the leading edge
tubular member 18 at the outboard end of the boot 10 for
the communication of air between the leading edge
.

~23~L5
tubular member and the upper inflatable passages 20 and
lower inflatable passages 22 as through a manifold 60.
As shown in Figs. 1 and 2, the leading edge
tubular member 18 is positioned in the area of the
leading edge centerline 34 which is preferably posi-
tioned in the area of a stagnation line 62 of the
airfoi1 14 when the aircraft is in a normal flight
attitude.
In the operation of the deicer boot 10, the
deicing cycle has an inflation sequence including the
first initial inflation of the leading edge tubular
member 18. Air is injected into air inlet opening 56 at
a s-uitable pressure which for this embodiment is around
18 pounds per square inch. This causes the tubular
member 18 to inflate to the position shown in Fig. 1 for
cracking the ice cap in the area o~ stagnation line 62.
After the initial inflation, the air passes
through opening 58 and into the manifold 60 whereupon
the upper inflatable passages 20 and lower in~Latable
passages 22 are inflated to the position shown in Fig~
2 which further shatters the ice layers of the ice cap
from the upper section 36 and lower section 38 of the
deicer boot 10. The application of inflation air is
then discontinued and a vacuum applied to the air inlet
and outlet opening 56 whereupon the air in the upper
and lower inflatable passages 20 and 22 flows to the
manifold 60 and air opening 58 through a multitude of
minute passages in uncoated surfaces of the outer ply 28
and inner ply 30. The inflation air then passes through
the air opening 58 into the leading edge tubular member

18 which con~eys the air to the air inlet and outlet
opening 56 through the bleeder channel 47 provided by
the lnterstices between the stiff fibers 46 in the
tubular member.
In accordance with the embodiment shown in Figs. 1
through 4, the two-step inflation sequence is provided
with only one air pressure source connected to the air
inlet and outlet opening 56; however, it is understood
that two sources may be used with separate valves con-
necting the sources to the leading edge tubular member
18 and to the upper and lower inflatable passages 20
and 22. It is also understood that where desirable two
or more leading edge tubular members 18 may be provided
in the area of the leading edge centerline 34 for crack
in~ the ice cap in the area of the airfoil stagnation
line 62.
The air pressure and the time during which the
deicer boot is inflated is determined in accordance
with the ice buildup on the deicer boot 10. In the
operation of the embodiment shown, the leading edge
tubular member 18 and upper and lower inflatable
passages 20 and 22 are inflated for about four to six
seconds. Also the air inlet and outlet opening 56 and
the air opening 58 may be positioned near the ends of
the deicer boot 10. In the present embodiment the air
inlet and outlet opening 56 and the air opening 58 are
located within about two to six inches from the ends
of the leading edge and the tubular member 18 which has
a length of from about 50 to 250 inches. In this
embodiment the upper and lower inflatable passages 20
... .

9~23~
and 22 are part of a sewn carcass; however, the passages
may be continuous integral tubes like the leading edge
tubular member 18 connected to the manifold 60.
In operation, after the inflating air has been
removed from the boot 10 in a deflating operation, the
boot remains in the deflated condition with the outside
surface 16 of the boot having a configuration such as
that shown in Fig. 1 in dotted and solid lines for a
predetermined period of time. Thereafter the deicing
cycle is repeated starting with the inflation of the
leading edge tubular member 18.
While a certain representative embodiment and
details has been shown for the purpose of illustrating
the invention, it will be apparent to those skilled in
the art that various changes and modifications other
than those referred to may be mad~ therein without
departing from the invention.
.
. .

Representative Drawing

Sorry, the representative drawing for patent document number 1236445 was not found.

Administrative Status

2024-08-01:As part of the Next Generation Patents (NGP) transition, the Canadian Patents Database (CPD) now contains a more detailed Event History, which replicates the Event Log of our new back-office solution.

Please note that "Inactive:" events refers to events no longer in use in our new back-office solution.

For a clearer understanding of the status of the application/patent presented on this page, the site Disclaimer , as well as the definitions for Patent , Event History , Maintenance Fee  and Payment History  should be consulted.

Event History

Description Date
Inactive: IPC from MCD 2006-03-11
Inactive: Expired (old Act Patent) latest possible expiry date 2005-05-10
Grant by Issuance 1988-05-10

Abandonment History

There is no abandonment history.

Owners on Record

Note: Records showing the ownership history in alphabetical order.

Current Owners on Record
GOODRICH (B.F.) COMPANY (THE)
Past Owners on Record
DUAIN N. ELY
JOSEPH H. MACARCHENIA
Past Owners that do not appear in the "Owners on Record" listing will appear in other documentation within the application.
Documents

To view selected files, please enter reCAPTCHA code :



To view images, click a link in the Document Description column. To download the documents, select one or more checkboxes in the first column and then click the "Download Selected in PDF format (Zip Archive)" or the "Download Selected as Single PDF" button.

List of published and non-published patent-specific documents on the CPD .

If you have any difficulty accessing content, you can call the Client Service Centre at 1-866-997-1936 or send them an e-mail at CIPO Client Service Centre.


Document
Description 
Date
(yyyy-mm-dd) 
Number of pages   Size of Image (KB) 
Cover Page 1993-08-07 1 14
Claims 1993-08-07 3 92
Abstract 1993-08-07 1 24
Drawings 1993-08-07 1 35
Descriptions 1993-08-07 8 282