Some of the information on this Web page has been provided by external sources. The Government of Canada is not responsible for the accuracy, reliability or currency of the information supplied by external sources. Users wishing to rely upon this information should consult directly with the source of the information. Content provided by external sources is not subject to official languages, privacy and accessibility requirements.

Claims and Abstract availability

Any discrepancies in the text and image of the Claims and Abstract are due to differing posting times. Text of the Claims and Abstract are posted:

  • At the time the application is open to public inspection;
  • At the time of issue of the patent (grant).
(12) Patent Application: (11) CA 2201111
(54) English Title: METHOD AND DEVICE FOR COOLING GASES
(54) French Title: PROCEDE ET DISPOSITIF DE REFROIDISSEMENT DES GAZ
Status: Deemed Abandoned and Beyond the Period of Reinstatement - Pending Response to Notice of Disregarded Communication
Bibliographic Data
(51) International Patent Classification (IPC):
  • F25B 47/02 (2006.01)
  • B01D 53/26 (2006.01)
(72) Inventors :
  • GOSSLER, EWALD (Austria)
(73) Owners :
  • EWALD GOSSLER
(71) Applicants :
  • EWALD GOSSLER (Austria)
(74) Agent: RICHES, MCKENZIE & HERBERT LLP
(74) Associate agent:
(45) Issued:
(86) PCT Filing Date: 1995-09-27
(87) Open to Public Inspection: 1996-04-04
Availability of licence: N/A
Dedicated to the Public: N/A
(25) Language of filing: English

Patent Cooperation Treaty (PCT): Yes
(86) PCT Filing Number: PCT/AT1995/000187
(87) International Publication Number: WO 1996010156
(85) National Entry: 1997-03-26

(30) Application Priority Data:
Application No. Country/Territory Date
A 1854/94 (Austria) 1994-09-29

Abstracts

English Abstract


According to a method of cooling gases, in particular air which is drawn in through a compressor,
in a compressed air arrangement the gas flows alternately through at least one of a plurality
of refrigerating driers (5, 6) equipped with heat exchangers (15, 16). The gas drawn in is cooled
by means of a heat exchanger (15, 16) to below 0°C over a cooling section. Whilst the gas is
being cooled, the ice produced in the refrigerating drier (5,6) is defrosted by at least one of the
refrigerating driers (5, 6) or in the further refrigerating drier(s) (5, 6) by the supply of a hot
refrigerant vapour. The liquid refrigerant flowing out of the refrigerating drier (5, 6) to be
defrosted is introduced into a pressure and/or connection line (17, 18) of the refrigerant circuit
between the inlet of the heat exchanger (15, 16) used for cooling the gas drawn in and the con-
denser (59), which is arranged upstream of this (these) heat exchangers, or the tank. The
invention also concerns a further method in which the nominal temperature is higher at the
corresponding nominal pressure of the refrigerant emerging from the heat exchanger used for
cooling the gas drawn in than the nominal temperature corresponding to the nominal pressure
of this refrigerant.


French Abstract

L'invention est une méthode de refroidissement de gaz, en particulier d'air aspiré dans un compresseur, dans une installation à air comprimé où le gaz circule de façon alternée dans au moins un déshydrateur de réfrigération faisant partie d'une pluralité de déshydrateurs de réfrigération (5, 6) dotés d'échangeurs de chaleur (15, 16). Le gaz aspiré est refroidi à une température inférieure à 0o C par un échangeur de chaleur (15, 16) dans une unité de refroidissement. Pendant le refroidissement du gaz, le déshydrateur de réfrigération (5, 6) est dégivré par au moins un des déshydrateurs (5, 6) au moyen d'une vapeur chaude. Le réfrigérant liquide qui sort du déshydrateur de réfrigération (5, 6) à dégivrer est introduit dans une conduite de refoulement et/ou de branchement (17, 18) du circuit de réfrigération entre l'entrée de l'échangeur de chaleur (15, 16) utilisé pour refroidir le gaz aspiré et le condenseur (59), lequel est monté en amont de cet échangeur de chaleur, ou le réservoir. L'invention dévoile également une méthode dans laquelle, à la pression nominale correspondante de l'agent réfrigérant sortant de l'échangeur de chaleur utilisé pour refroidir le gaz aspiré, la température nominale est supérieure à la température nominale correspondant à la pression nominale de cet agent réfrigérant.

Claims

Note: Claims are shown in the official language in which they were submitted.


- 35 -
Claims
1. Method of cooling gases, in particular air which is drawn in through a compressor
in a compressed air arrangement, in which the gas flows alternately through at least one of a
plurality of refrigerating driers equipped with heat exchangers through which a refrigerant
flows and is cooled in a cooling section by means of a heat exchanger through which a refrigerant
flows, to below 0°C and whilst the gas is being cooled by at least one of the refrigerating
driers, in the refrigerating drier or in additional refrigerating driers the ice produced by the
condensate separated from the suctioned gas is defrosted by supplying a hot refrigerant vapour
which flows through the heat exchanger in the refrigerating drier, whereby the hot gaseous
refrigerant vapour is liquefied on passing through the refrigerating drier or driers to be defrosted
and the liquid refrigerant is returned into the refrigerant circuit, characterised in that the liquid
refrigerant flowing out of the refrigerating drier to be defrosted is suctioned by low pressure
produced in a Venturi valve with the liquid refrigerant flowing from the condenser to the
expansion valve or between the expansion valve and the heat exchanger switched to overcool the
suctioned air is mixed with the expanded gaseous refrigerant.
2. Method of cooling gases, in particular air which is drawn in through a compressor
in a compressed air arrangement in which the gas flows through at least one refrigerating drier
and is cooled in a cooling section by means of a heat exchanger through which a refrigerant
flows, preferably to below 0°C, in particular according to claim 1, characterised in that the
nominal temperature at the nominal pressure of the refrigerant emerging from the heat
exchanger used to cool the suctioned gas is greater than the nominal temperature corresponding to
the nominal pressure of said refrigerant.
3. Method according to claim 2, characterised in that the actual temperature and/or the
actual pressure of the gas drawn in by the compressor and/or the refrigerant emerging from the
heat exchanger used to cool the suctioned gas is detected and compared with the nominal
temperature and/or the nominal pressure of the gas and/or refrigerant and the amount of the
refrigerant flowing through the expansion valve to the heat exchanger is controlled to overcome the
difference between the nominal and actual temperature and/or the actual and nominal pressure.
4. Method according to one of claims 1 to 3, characterised in that the amount of
refrigerant flowing through the expansion valve is increased if the actual temperature of the
suctioned gas is too low.
5. Method according to one or several or claims 1 to 4, characterised in that the pres-

- 36 -
sure of the refrigerant in the return line is greater than the pressure of the refrigerant in the
connection line.
6. Method according to one or several of claims 1 to 5, characterised in that the
amount of hot, liquid refrigerant fed into the bypass line by the refrigerant compressor is less
than 50 %, preferably less than 20 %, of the entire conveyed output of the refrigerant compressor.
7. Method according to one or several of claims 1 to 6, characterised in that the refrigerant
is fed from the heat exchanger to be defrosted between the condenser and the expansion
valve into the pressure line.
8. Method according to one or several of claims 1 to 7, characterised in that the liquid
refrigerant supplied from the heat exchanger to be defrosted via the return line is fed into the
pressure line in the region in which the pressure of the liquid refrigerant is equal to or smaller
than that of the refrigerant emerging from the heat exchanger to be defrosted.
9. Method according to one or several of claims 1 to 8, characterised in that the gas
drawn in by the compressor is guided through two heat exchangers arranged one behind the
other in the direction of flow.
10. Method according to one or several of claims 1 to 9, characterised in that the gas on
passing through the first heat exchanger, preferably forming a climatic zone, at a suction
temperature of the gas of +20°C is cooled to a temperature equal to or greater than -10°C, preferably
higher than +2°C, and in that the suctioned gas is cooled to a temperature of below -10°C,
preferably below -30°C by the rear heat exchanger.
11. Method according to one or several of claims 1 to 10, characterised in that the
suctioned gas in the climatic zone is only cooled to the extent that the precipitating condensate
remains liquid.
12. Method according to one or several of claims 1 to 11, characterised in that the
refrigerant between the expansion valve and the suction line is guided in several part flows
through the heat exchanger.
13. Method according to one or several of claims 1 to 12, characterised in that the
pressure in each part flow of the refrigerant is determined or controlled by a separate expansion

- 37 -
valve.
14. Method according to one or several of claims 1 to 13, characterised in that various,
preferably several refrigerant compressors are assigned to the heat exchangers in the climatic
zone and the cooling zone.
15. Method according to one or several of claims 1 to 14, characterised in that the heat
exchangers of the climatic zone and/or the cooling zone are supplied with hot gaseous refrigerant
during the defrosting process.
16. Method according to one or several of claims 1 to 15, characterised in that the
refrigerant, e.g. with R22 with a pressure of 13.5 bars, is heated to a temperature of +70°C to
+105°C, preferably +80°C to +90°C.
17. Method according to one or several of claims l to 16, characterised in that by cooling
the gaseous refrigerant in the condenser to a temperature of between +25°C and +60°C,
preferably +30°C, the refrigerant is liquefied.
18. Method according to one or several of claims 1 to 17, characterised in that in a heat
exchanger between the condenser and the expansion valve the liquid refrigerant is cooled to
temperature of +10°C to +30°C, preferably +20°C.
19. Method according to one or several of claims 1 to 18, characterised in that the hot
gaseous refrigerant supplied to the heat exchanger to be defrosted is controlled so that the
refrigerant emerging from the heat exchanger to be defrosted has a temperature of +5°C to
+15°C, preferably +10°C.
20. Method according to one or several of claims 1 to 19, characterised in that the
gaseous refrigerant on emerging from the heat exchanger cooling the suctioned gas is overheated by
between 10% and 50%, preferably by 20%.
21. Method according to one or several of claims 1 to 20, characterised in that the line
cross section of the refrigerant lines in the heat exchanger and the line lengths of the refrigerant
lines in a heat exchanger between the expansion valve and the suction line are the same size
and there is a loss of pressure of the refrigerant in the heat exchanger of about 1 to 1.1 m water
column.

- 38 -
22. Method according to one or several of claims 1 to 21, characterised in that a
difference in temperature of the gas between the input into and the output out of the refrigerating
drier is equal even with changing temperatures of the gas at the input to the refrigerating drier.
23. Device for cooling gases in particular air which is drawn in through a compressor
in a compressed air arrangement, which comprises two cooling sections with refrigerating
driers for the gas which run parallel to one another and contains at least one heat exchanger
respectively, which is arranged in a refrigerant circuit in which the compressed refrigerant from
a refrigerant compressor via a condenser and an expansion valve is available at a connection
line forming the input of the heat exchanger, and its suction pipe is connected if necessary by a
heat exchanger for absorbing heat to a suction input of the refrigerant compressor, whereby
each of the heat exchangers is connected via a separate expansion valve to the pressure line of
the refrigerant downstream of the condenser, and if necessary stop valves, e.g. solenoid valves,
are arranged between the condenser and the expansion valve as well as the heat exchanger and
the suction line of the refrigerant compressor, the drives of which are connected to a control
device, in particular according to claim 1 or 2, characterised in that each suction line (19, 20,
132 to 138) is connected between the heat exchanger (15, 16, 95, 96, 111 to 117) and the
solenoid valve (21, 139 to 145) via a return line (38, 39, 160 to 173) with the interconnection of a
check valve (40, 41, 174 to 180) effective in the direction of the suction line (19, 20, 132 to
138) to the connection line (17, 18) between the expansion valve (27, 28, 125 to 131) and the
heat exchanger (15, 16, 95, 96, 111 to 117) or is connected to the pressure line (25, 26, 66) via a
Venturi valve (188, 189) between the condenser (59) and the expansion valve (27, 28, 125 to
131).
24. Device for cooling gases, in particular air which is drawn in through a compressor
in a compressed air arrangement, with a refrigerating drier for the gas which comprises at least
one heat exchanger, which is arranged in a refrigerant circuit, in which the compressed refrigerant
from a refrigerant compressor via condenser and an expansion valve is available at a
connection line forming the input of the heat exchanger and the output of the heat exchanger is
connected by the suction line to a suction input of a refrigerant compressor, in particular
according to one of claims 1, 2 or 23, characterised in that the expansion valve (27, 28, 125 to
131) is pressurised to alter the amount of refrigerant (68) passing through to the heat exchanger
(15, 16, 95, 96, 111 to 117), when the existing nominal pressure differing from the actual
temperature, which is fixed a preset amount over a corresponding plan temperature above the
nominal pressure, is ascertained by a pressure sensor (50, 51) and/or a temperature sensor (54,
55), which are arranged in the suction line leading from the heat exchanger to the refrigerant
compressor.

- 39 -
25. Device according to claim 23 or 24, characterised in that the suction line (19, 20,
132 to 138) is provided via a pressure line (52, 53) with a pressure sensor (50, 51) and with a
temperature sensor (54, 55).
26. Device according to one or several of claims 23 to 25, characterised in that the
temperature sensor (54, 55) and/or the pressure sensor (50, 51) is connected to the expansion valve
(27, 28, 125 to 131).
27. Device according to one or several of claims 23 to 26, characterised in that the
expansion valve (27, 28, 125 to 131) increases the expansion of the refrigerant (68), when at the
existing nominal pressure the actual temperature rises above a corresponding plan temperature
over the nominal pressure.
28. Device according to one or several of claims 23 to 27, characterised in that the
temperature of the refrigerant (68) emerging from the heat exchanger (15, 16, 95, 96, 111 to 117) to
be defrosted is higher than +5°C.
29. Device according to one or several of claims 23 to 28, characterised in that the
refrigerating drier (5, 6) in a climatic zone (109) and a cooling zone (110) respectively comprises
at least one heat exchanger (15, 16, 95, 96, 111 to 117).
30. Device according to one or several of claims 23 to 29, characterised in that each
heat exchanger (15, 16, 95, 96, 111 to 117) has several refrigerant lines (181 to 187) running
parallel to one another and in that the refrigerant lines (181 to 187) between the expansion
valve (27, 28, 125 to 131) and the suction line (19, 20, 132 to 138) all have an equal length and
an equal cross section.
31. Device according to one or several of claims 23 to 30, characterised in that the
climatic zone (109) and the cooling zone (110) respectively several heat exchangers (15, 16, 95,
96, 111, to 117) connected parallel to one another are fed with a separate expansion valve (27,
28, 125 to 131) by a common refrigerant compressor (23).

Description

Note: Descriptions are shown in the official language in which they were submitted.


CA 02201111 1997-03-26
~,(, J~ PCT/~T95/~187
~,
_ I _
Method and device for coolin~ ~ases
The invention relates to a method and a device for compressing gases, as described in the pre-
amble of patent claims 1 and 2 as well as 23 and 24.
A method and a device for compressing gases is already known - according to DE-A1-36 37
071 -, in which the gas drawn in through the compressor is previously cooled by a refrigerating
drier in a cooling section to below 0C. The air drawn in by the compressor is in this case suc-
tioned alternatively by one of two parallel connected refrigerating driers. Whilst the suctioned
10 gas is cooled by one of them, the condensate in the form of ice which is produced on cooling
the suctioned gas is removed by the other. For this instead of an overcooled refrigerant hot,
gaseous refrigerant is supplied to the refrigerating drier to be defrosted, which flows through
the heat exchanger arranged in the said refrigerating drier and heats it, so that the ice adhering
to the heat exchanger and refrigerating drier defrosts. If the refrigerant flowing out of the heat
15 exchanger is established to be of a temperature in the region of more than +0C, the supply of
hot refrigerant to the heat exchanger is interrupted and expanded, cold refrigerant flows through
the heat exchanger again, which leads to a pre-cooling of the heat exchanger. If a desired mini-
mum operating temperature of the heat exchanger is reached, for example -10C, the air
required by the compressor can be suctioned through the pre-cooled heat exchanger again,
20 whereupon the other heat exchanger is defrosted. By means of the alternate cooling and defrost-
ing of the two heat exchangers a continual drawing in of overcooled gas for the compressor is
possible, and also by means of pre-cooling any damage that might be caused by ice particles
drawn in with the suctioned air can be avoided in the compressor. The cooled refrigerant exit-
ing from the outlet of the heat exchanger on defrosting is guided through lines to a liquid gas
25 tank arranged directly downstream of the condenser arranged after the refrigerant compressor,
and is mixed there with the previously cooled refrigerant. By means of the return of the refrig-
erant exiting from the heat exchanger to be defrosted into the liquid gas tank the effectiveness
of such methods and devices is not always satisfactory.
30 The objective of the present invention is to improve the overall effectiveness of a method and a
device for producing dried compressed air.
The problem of the invention is solved by the measures in the characterising part of patent
claim 1. The advantage of this solution is that the refrigerant exiting the heat exchanger of the
35 refrigerating drier to be defrosted is fed into the refrigerant line directly before the heat ex-
changer of the other refrigerating drier overcooling the suctioned air, so that heat is drawn from
the environment by means of the gasification of the refrigerant exiting the heat exchanger to be

r CA 02201111 1997-03-26
Wo 1~6 PCTtAT95~187
- 2 -
defrosted in liquid form, determined by the fall in pressure and the energy required to convert
the refrigerant from the liquid to the gaseous state, so that the refrigerant used previously to
defrost the heat exchanger to be defrosted can now be used at least partly to cool the gas drawn
in by the compressor. The exact regulation of the suction temperature of the gas drawn in
5 though the compressor can be controlled by the expansion valve arranged upstream of the heat
exchanger used to overcool the gas, whereby in a surprising manner the pressure and tempera-
ture conditions in the refrigerant, which change during the cooling process in the heat
exchanger, can be balanced out by the already available control.
10 This problem of the invention can however also be solved independently hereof by the meas-
ures described in the characterising part of claim 2. The advantage of this solution is that a
so-called overheating of the refrigerant vapour is achieved, i.e. the difference between the tem-
perature at which the refrigerant condenses and passes from the gaseous into the liquid phase is
exceeded by several degrees, so that even with unforeseen cooling on passing through the line
15 system in the region of the suction line no change in state can occur, in particular no sudden
change in state, in order to prevent liquid refrigerant from being drawn into the suction line of
the refrigerant compressor. In this way a much higher degree of operational reliability is
achieved by such a method and the arrangements are prevented from getting damaged.
20 It is achieved advantageously by means of the further development according to claim 3 that
not only the heat output in the heat exchanger is controlled but at the same time the mainte-
nance of a desired degree of overheating of the refrigerant can also be monitored.
By means of a method according to claim 4 it is ensured that this level of refrigerant overheat-
25 ing can also be maintainecl during operation.
A method according to claim 5 is also advantageous as thereby an improved energy balance on
overcooling the suctioned air can be achieved and thus more energy can be saved as the heat
removed from the refrigerant necessary for condensing can be used to defrost the heat ex-
30 changer or heat exchangers not in operation.
By means of the further advantageous method step according to claim 6 the introduction of theamount of refrigerant emerging from the heat exchanger to be defrosted requires no additional
regulation or control and thus a furtl er loss of pressure and thus a loss of energy is excluded.
A procedure according to claim 7 is also advantageous, as thereby the amount of liquefied re-
fri~erant emerging from the heat exchan~er or heat exchangers to be defrosted is equal to or

-
~ CA 02201111 1997-03-26
'0 1156 PCT/AT951~187
- 3 -
less than the amount of refrigerant regulated by the expansion valve and cooled by the con-
denser, and thus by controlling the expansion valve despite the use of the amount of refrigerant
supplied without regulation by the heat exchan~ers to be defrosted a definite control and regula-
tion of the temperature to be cooled is possible.
An unproblematical mixing of the refrigerant supplied by the heat exchanger to be defrosted
can be achieved by the measures according to claim 8.
A refined control of the heat transfer in the heat exchanger can be achieved by the procedure
10 according to claim 9.
An exact regulation of the temperature of the gas suctioned by the compressor which is to be
compressed can however also be achieved by the measures according to claim 10, whereby
changing pressure and temperature conditions owing to the continuous defrosting process in the
15 heat exchanger to be defrosted do not make more difficult the delivery of this amount of refrig-
erant into the circuit for cooling the heat exchanger in order to cool the suctioned gas.
A surprising additional advantage is also provided by the measures according to claim 11, as
thereby the degree of ice formation on the heat exchanger arranged in the cooling zone is re-
20 duced and thus a change-over between the parallel suction paths need not be made as often,
whereby because of the lower energy requirement on defrosting greater economy can be
achieved. In addition, because of the division into a climatic zone and a cooling zone, in the
climatic zone the surfaces of the heat exchangers are wet from the precipitation of condensate
removed from the gas and because of these wet surfaces the heat exchangers can be used as
25 particle filters, in particular dirt filters, whereby dirt is removed regularly from the heat ex-
changer with the outflow of condensate during continuous operation.
By means of a further procedure according to claim 12 a preferred division of the cooling proc-
ess of the suctioned gas and a preferred removal of the condensate according to the procedure
30 can be achieved. This solution is mainly advantageous in that the removal of water vapour in
the climatic zone can be performed using much less energy than if the gas were cooled by a
single heat exchanger by a temperature difference of 40-50, for example to -40. By dividing
into the climatic and the cooling zone, on using separate refrigerant compressors for each of the
two zones with about 10-times the cooling capacity of a single heat exchanger, a 2.5 times in-
35 crease of power input is all that is required in the refrigerant compressors. In this way, bydividing the cooling of the gas into a climatic and cooling zone a considerable increase in econ-
omy is achieved.

- - ~
CA 02201111 1997-03-26
WO 156 PCTIAT95/~187
- 4 -
A procedure according to claim 13 is also advantageous as thereby the separation of particles,
in particular dust and dirt, drawn in with the suctioned gas is made simply more possible.
A greater degree of effectiveness on cooling by optimising the pipe length of the refrigerant
5 lines in the heat exchanger can be achieved by the measures according to claim 14.
An exact method control is possible by the measures according to claim 15 as it can be ensured
mainly that by means of a sensitive control the refrigerant exits the heat exchanger in a gaseous
state.
- -
In a further variation of the method according to claim 16 the refrigerant compressor can be
controlled favourably in terms of the energy balance and greater operational reliability can be
achieved.
15 By means of the advantageous procedure according to claim 17, even at lower temperatures of
the gas drawn in from the environment which is to be compressed, perfect operational reliabil-
ity and a precise continuous operation of the compressor can be achieved, whereby even at very
low suction temperatures or with considerable overcooling of the suctioned gas rapid change
between the parallel running suction paths is possible because of the rapid defrosting of the re-
20 spective iced-up heat exchanger.
Further preferred procedures can be achieved by the measures according to claims 18 to 24.
The problem of the invention can however also be solved by the independent solution accord-
25 ing to the characterising part of claim 25, whereby the device can ensure that the refrigerant
flowing out of the heat exchanger in which the gas or the air has been cooled, is heated over the
pressure dew point and thus the refrigerant flowing back to the refrigerant compressor is reli-
ably prevented from condensing.
30 The problem of the invention can however also be solved independently thereof by the meas-
ures provided in the characterising part of claim 26. The advantage of this solution is that a
simple return of the refrigerant condensed in the heat exchanger to be cooled into the circuit
provided for cooling the parallel running heat exchanger is possible and thus an increase in ef-
fectiveness and a considerable energy saving on compressing gases can be achieved.
By means of the further development according to claim 27 it is possible in a simple way to
ensuIe overheating of the refrigerant exiting from the heat exchanger used for cooling the suc-
-

~ CA 02201111 1997-03-26
wo )156 PCT/AT95/~18
- 5 -
tioned gas.
An almost real-time control of the operation of the device can be achieved by the features ac-
cording to claim 28.
s
A high degree of operational reliability can be achieved by the development according to claim
29.
An embodiment according to claim 3() is also advantageous, in which a rapid defrosting of the
10 ice layer is made possible by the heat exchanger.
The design variant according to claim 31 is also advantageous as thereby a step-by-step cooling
of the suctioned gas and thus a specific and rapid removal of the condensate contained in the
suctioned gas is made possible.
In an embodiment of the device according to claim 32 a high degree of operational reliability
with little expenditure on technical devices as well as an effective use of the refrigerant energy
for overcooling the suctioned gas is achieved.
20 A sensitive control of the temperature of the suctioned gas and an associated high degree of
effectiveness of the entire device can be obtained by the embodiment according to claim 33.
In the following the invention is described in more detail with reference to the design variants
shown in the examples of embodiments.
They show:
Fig. 1 a block diagram of a device according to the invention for compressing gases in a
simplified, diagrammatic view;
Fig. 2 a block diagram of the device according to the invention for compressing gases
with two refrigerating driers arranged parallel to one another and a hot gas
defroster;
5 Fig. 3 a block diagram of the device according to the invention for compressing gases
with two refrigerating driers arranged parallel to one another and a hot gas
defroster:

CA 02201111 1997-03-26
" _
WO ~ 156 PCT/AT95~187
- 6 -
Fig. 4 a diagram of the temperature p~th of the device according to the invention;
Fig. 5 a block diagram of a different design variant of the device according to the
invention in a simplified, diagrammatic view;
Fig. 6 a block diagram of a further embodiment of the device according to the invention,
in which only one of several refrigerating driers is shown, which comprises several
heat exchangers arranged behind one another in the direction of flow, in a
simplified, diagrammatic view;
''
Fig. 7 a block diagram of a further embodiment of the device according to theinvention;
Fig. 8 a block diagram of a further embodiment of the device according to theinvention;
5 Fig. 9 a block diagram of a further embodiment of the device according to the invention
for compressing gases with two refrigerating driers arranged parallel to one another
and a hot gas defroster;
Fig. 10 a block diagram of an installation, in which several devices according to the
invention are connected together for compressing gases in a simplified, schematical
view;
Fig. 11 a block diagram of an installation according to the invention in which several
refrigerating driers are connected together on the pressure side of a compressor, in a
simplified schematical view;
Fig. 12 a block diagram of a different embodiment of the device according to the invention
in a simplified schematical view.
In Fig. 1 a device 1 is shown for compressing a gas 2 which is indicated schematically by ar-
rows 3. Said device 1 comprises a compressor 4, whereby both screw compressors and piston
compressors or radial compressors can be used with or without oil injection, and two refrigerat-
ing driers 5, 6 arranged upstream thereof. The two refrigerating driers 5, 6, are connected by
suction lines 7, 8 to a suction-side suction point 9 of the compressor 4. Between an outlet 10, 11
of the refrigerating driers 5, 6 and the suction lines 7, 8 air-tight sealing flaps 12, 13 are ar-
ranged which are adjustable by drives 14, such as e.g. cylinder piston arrangements or electro-
magnetic arrangements, from the closed position shown for sealing flap 12 into the opened

, ~ CA 02201111 1997-03-26
WC 156 PCT/AT95/~18
-7~
position shown for the sealing flap 13.
At least one heat exchanger 15, 16 is arranged in each refrigerating drier 5, 6. Each heat ex-
changer 15, 16 is connected with a connection line 17, 18 or a suction line 19, 20 of a
refrigerant circuit. The gaseous refri~erant in the suction lines 19, 20 emerging from the heat
exchanger 15, 16 is suctioned in particular via a solenoid valve 21 and a suction line 22 by a
refrigerant compressor 23. Control device 24 is provided to control or regulate the device 1 to
which the individual solenoid valves 21 and drives 14 are connected.
The refrigerant is conveyed further by the refrigerant compressor 23 or a connected condenser
via pressure lines 25, 26 and adjustable or controllable expansion valves 27, 28 which can be
used simultaneously as stop valves for example, into the connection lines 17, 18, that is the in-
let of heat exchanger 15, 16. Furthermore, it is also possible on using non-closable expansion
valves 27, 28 to arrange a solenoid valve upstream or downstream of the latter in order to inter-
rupt the refrigerant circuit.
Furthermore, the connection line 17 or 18 is connected via a bypass line 29, 30 with the inter-
connection of a solenoid valve 31, 32 for the hot gas to the line between the refrigerant
compressor 23 and the condenser.
In addition, the refrigerating driers 5, ~ have further sealing flaps 33 which are gas-proof in a
closed state at least from the gases 2 coming in from the direction of suction point 34.
Furthermore, the refrigerating driers 5, 6 are conllected together by a connection line 35. This
connection line 35 connects the openings of the refrigerating driers 5, 6 opposite the sealing
flaps 12, 13. The connection line 35 and the refrigerating driers 5, 6 have an outflow 36 which
is arranged on the suction side of the refrigerating driers 5, 6 for the removal of condensate.
During the cooling of the gas 2 suctioned in by the compressor 4 and on defrosting the ice pro-
duced during cooling by the high air humidity, the water from the melted ice can be removed
through the outflow 36. Furthermore, a sealing flap 37 is arranged in this connection line 35,
which preferably, but not necessarily, is gas-proof in a closed state at least from gases 2 emerg-
ing from the direction of suction point 34.
The suction lines 19, 20 are each connected at the output of the heat exchanger 15, 16 upstream
of the solenoid valves 21 to a return line 38 and 39, whereby in the return line 38, which is
connected to the suction line 19, a check valve 40 acting against return flows from the connec-
tion line 18 is arranged, so that the return line 38 can be connected to the connection line 18,

CA 02201111 1997-03-26
WO 1~6 PCTIAT95~187
- 8 -
whilst the suction line 20 is connected to the connection line 17 by the return line 39 and a
check valve 41 effective against the inflow of refrigerant gas from the connection line 17.
The method for cooling a gas 2 to be compressed according to the invention is as follows:
s
The gas 2 to be compressed is suctioned in the device 1 shown with an open sealing flap 33 of
the refrigerating drier 5 through the compressor 4 via the suction point 34 into the refrigerating
drier 5. The suctioned gas 2 then passes through the heat exchanger 15 which is defrosting at
this time, i.e. is freed from the condensate produced in the form of ice. On passing warm air
over the ice or heat exchanger 15 covered with cold defrosted water from the ice the suctioned
gas 2 is cooled and removes some of the moisture contained in the gas 2 in the form of water
vapour.
After the suctioned gas 2 has passed through the heat exchanger 15 and the connection line 35
the gas 2 flows through the heat exchanger 16 cooled to the desired temperature and is thereby
cooled to the desired, prescribed temperature, whereupon the liquid still contained in the suc-
tioned gas 2 in the form of water vapour is separated. The separated liquid is deposited as frost
or ice on the heat exchanger 16 or the walls of the refrigerating drier 6 owing to the below 0C
temperatures of the heat exchanger 16. From there the gas cooled to below 0C, preferably to
temperatures of between -10C and -50C, enters the opened sealing flap 13, which is designed
to be gas-proof in both directions, to the suction-side suction point 9 of the compressor 4.
The cooling of the heat exchanger 16 is performed by a refrigerant. Said refrigerant is com-
pressed in the refrigerant compressor 23 and afterwards cooled in a condenser that is not
described in more detail, so that it enters into the liquid state and is then fed through the pres-
sure line 26 to an expansion valve 28. On the expansion of the refrigerant the refrigerant
removes heat from the environment and cools the heat exchanger 16, depending on the amount
of refrigerant supplied, whereby control is performed via the expansion valves 27 or 28 by
means of the control device 24. The control of the individual solenoid valves 21 of the expan-
sion valves 27, 28 of the sealing flaps 12, 13, 33, 37 is performed by control lines 42 to 47.
For the cooling of the heat exchanger 15 the latter is also connected to the condenser down-
stream of the refrigerant compressor 23 by the pressure line 25, in which the liquefied
refrigerant is supplied to the expansion valve 27, where the fall in pressure occurs to gasify the
35 refrigerant, and is connected by a connection line 17 to the heat exchanger 15. The return of the
refrigerant to the refrigerant compressor 23 occurs through the suction line 19 and 22.

~ CA 02201111 1997-03-26
/0' - 56 PCT/AT9~/~187
In the operating state shown in Fig. 1 the ~as 2 to be compressed, for example air, is drawn as
indicated by the schematical arrows 3 throu~h suction point 34 in the region of the refrigerating
drier 5 and conveyed through the heat exchanger 15 and the connection line 35 into the region
of the refrigerating drier 6. Afterwards the gas 2 flows through or washes over the heat ex-
changer 16 and passes through sealing flap 13 into the suction line 8, which supplies the now
dehumidified and overcooled gas 2 to the suction point 9 of the compressor 4.
In this mode of operation, as shown, the sealing flap 12 which is airtight in both directions of
flow is also closed like sealing flap 33 assigned to the refrigerating drier 6 and sealing flap 37
arranged in the connection line 35.
The cooling of the gas 2 in the refrigerating drier 6 causes the heat exchanger 16 of the refriger-
ating drier 6 to ice up, i.e. droplets of water are separated from the suctioned gas 2 so that only
dry gas 2 is suctioned by the compressor 4. This has the advantage that liquid impact on the
compressor 4 caused accumulations of water can be prevented and leads in a surprising way
simultaneously to a cleaning of the suctioned ga.s 2, as suspended components in the suctioned
gas 2 are separated or held on the icy or wet surfaces of the heat exchanger 16 and can then be
removed in the subsequent defrosting of the heat exchanger 16 through the outflow.
A further advantage of this overcooling of the suctioned gas 2 is that the operating temperature
of the compressor 4 is extremely low, so that even in compressors 4 with oil injection there is
no gasification or vaporisation of the oil and vaporised oil is thus prevented from mixing with
the gas 2, as no more moisture is contained in the gas 2. In this way, also in connection with the
strong drying of the gas 2 by the liquid removal in the heat exchangers 15 or 16 mixtures of oil
and water do not occur and otherwise difficult to dispose of oil-water emulsions are prevented.
As when the heat exchanger 16 ices up too far the suctioned gas 2 can no longer be cooled to
the desired temperature, the latter must be freed from ice, i.e. the heat exchanger 16 must be
defrosted, to permit an uninterrupted supply of dried, cooled gas 2 to the suction point 9 of the
compressor 4. For this firstly the sealing flap 37 is opened in the connection line 35 so that the
gas 2 required by the compressor 4 is now suctioned through the suction point 34 assigned to
sealing flap 37. At the same time via the control device 24 the heat exchanger 15 is cooled to
the desired operating temperature range in that liquid refrigerant is fed into the heat exchanger
15 via the pressure line 25 and the expansion valve 27 of the connection line 17. Furthermore,
the sealing flap 33 of the refrigerating drier 5 is closed. If the heat exchanger 15 is cooled suffi-
ciently sealing flap 13 is closed and sealing flap 12 opened. Thereupon the gas 2 to be
compressed is guided via the suction point 34 past the sealing flap 37 to refrigerating drier 6

CA 02201111 1997-03-26
wo 156 ~ PCT/AT951~187
- 10-
and the gas 2 is cooled and dried thereby and subsequently fed via the opened sealing flap 12 to
the suction point 9 of the compressor 4.
Af~ ~alds or if necessary simultaneously with the opening of sealing flap 12 and closing of
5 sealing flap 13, sealing flap 33 of the refrigerating drier 6 is opened and simultaneously or di-
rectly after opening sealing flap 33 sealing flap 37 in the connection line 35 is closed. In this
way the gas 2 to be compressed has a higher temperature than the temperature of the previously
used heat exchanger 16 of the refrigerating drier 6, and the solid frozen condensate on the heat
exchanger 16 or on the walls of the refrigeratillg drier 6 is defrosted and can flow out through
10 outflow 36.
However, in order to accelerate the defrosting of the heat exchanger 16 in the refrigerating drier
6 the control device 24 activates the solenoid valve 32 for hot gas via the control line 47,
whereby from the refrigerant compressor 23, bypassing the condenser, the gaseous refrigerant
15 can flow at a high temperature through bypass line 30 to the heat exchanger 16. In the heat ex-
changer 16 the hot refrigerant now flows through the iced-up heat exchanger 16, whereby the
heat exchanger 16 is heated and defrosts the condensate frozen thereonto~ The refrigerant
cooled by the flow through of the iced up heat exchanger 16 reaches the connection line 17 via
the return line 39 and the check valve 41. There on flowing into the connection line 17 the re-
20 frigerant cooled and liquefied by the heat exchanger 16 changes into a gaseous state because ofthe drop in pressure caused thereby, and in this way supports the cooling of the heat exchanger
15 in the refrigerating drier S~ The exact temperature of the heat exchanger 15 is maintained by
means of the control of the expansion valve 27, so that depending on the defrosted state of the
heat exchanger 16 and the changing temperatures of the inflowing liquefied refrigerant caused
25 thereby, sufficient liquefied refrigerant can pass through the expansion valve 27 to achieve the
desired cooling of the heat exchanger 16~
Once the inner chamber of the refrigerating drier 6 has reached a presettable temperature the
control device 24 opens sealing flap 37 and simultaneously closes sealing flap 33 of the refrig-
30 erating drier 6, whereby now the gas 2 is suctioned through the sealing flap 37~ This has theadvantage that if the temperature of the inner chamber of the refrigerating drier 6 is too high t
he
gas 2 would no longer be pre-cooled and would be saturated with the water vapour produced on
defrosting the heat exchanger 16.
35 Once the refrigerating drier 6 is completely defrosted the solenoid valve 32 is closed by the
control device 24 and the expansion valve 28 is activated by control device 24. Here the refrig-
eIating drier 6 is cooled to a speci~lc temperature in order to ensure a rapid cooIing of the gas 2
,

CA 02201111 1997-03-26
~;~o )15~ rCT/AT951~187
on switching from refrigerating drier 5 to refrigerating drier 6. Once refrigerating drier 6 has
been pre-cooled to the preset temperature, the sealing flaps 12, 13, 33, 37 can be again switched
over, in that sealing flap 12 is closed and sealing flap 13 is opened, and thus the gas 2 suctioned
through the sealing flap 37 in the connection line 35 is dried by the refrigerating drier 6 and
cooled and is delivered via the sealing flap 13 to the suction point 9 of the compressor 4. The
corresponding switching over of sealing flap 33 of the refrigerating drier 5 can then be per-
formed subsequently, whereby afterwards the heat exchanger 15 iced-up during operation is
defrosted accordingly as described for heat exchangeF 16.
Depending on the selected suction temper~ture for the gas 2 at suction point 9 of the compres-
sor 4, after a specific pre-programmable period of time or after determining a corresponding
formation of ice the switching over between coolhlg of suctioned gas 2 and defrosting the heat
exchanger lS and 16 is performed.
In Figs. 2 and 3 the device 1 according to the invention for compressing a gas 2 is shown with
reference to a detailed schematical circuit diagram of the control device 24. The refrigerating
driers 5, 6 and their heat exchangers 15, 16 are connected to the pressure line 25, 26 by the
connection lines 17, 18 with the expansion valves 27, 28 with the interconnection of solenoid
valves 48, 49. Each of the expansion valves 27, 28 also has a pressure sensor 50, 51 by means
of which via the connection of pressure lines 52, 52 to the suction line 19, 20 the pressure of the
gaseous refrigerant can be established directly or indirectly. From the pressure it is thus also
possible to monitor the temperature of the refrigerant and because of the changing pressure val-
ues in the suction line 19, 20 the amoullt of refrigerant to be supplied to the heat exchangers 15,
16 can be controlled by the e,Ypansioll valves 27, 2~ accoldingly.
The suction lines 19, 20 are connected via the solenoid valves 21 to the suction line 22. A tem-
perature sensor 54, 55 is arranged between the solenoid valve 21 and each heat exchanger lS,
16. However, it is also possible that instead of the temperature sensor 54, 55 a pressure gauge
device is used, whereby the temperature of the refrigerant can be determined by the pressure of
the refrigerant. The pressure sensors 50, 51 connected to the pressure lines 52, 53 are connected
between the solenoid valves 21 and the temperature sensors 54, SS to the suction line 19, 20.
The output of the solenoid valves 21 is connected to the suction line 22 which enters into a heat
exchanger 56. The heat exchanger 56 is connected by a suction line 57 to an inlet of the refrig-
erant compressor 23. The refrigerant compressor 23 is here driven by a motor 58. A condenser
59 is connected by a line 61 to the output of the refrigerant compressor 23, in which condenser
the hot compressed gaseous refri~erant is cooled until it condenses by means of cooling-water

CA 02201111 1997-03-26
wo 156 PCT/AT95~18
circuit 60, preferably using the reverse flow prhlciple. Usually the condenser 59 which is driven
in reverse direction flow is designed so that it can take in a corresponding amount of refrigerant
and at the same time fulfils the function of a tank. If, for example, a condenser 59 is used, in
which the refrigerant is cooled by means of air, a tank is also arranged in the refrigerant circuit
in order to keep an appropriate reserve of refrigerant in supply.
Furthermore, the condenser 59 is connected by a line 62 to an input 63 of the heat exchanger 56
with the interconnection of a liquid converter 64. Said liquid converter 64 serves to separate
any moisture contained in the refrigerant, i.e. water vapour or water droplets and to prevent an
unpermitted increase in moisture or water in the refrigerant. The heat exchanger 56, in which
the hot refrigerant emerging from the liquid converter 64 flows, serves to dry the gaseous re-
frigerant flowing through on the suction side, i.e. so that any liquid components of the
refrigerant still present in the flow of ~aseous refrigerant are deposited in the heat exchanger
56, which operates as a refrigerant drier, and are heated by the hot refrigerant, and vaporise so
that liquid refrigerant is prevented from being supplied on the suction side of the refrigerant
compressor 23. An output 65 of the heat exchanger 56 is connected via a pressure line 66,
which divides into the pressure lines 25, 26 for the heat exchangers 15, 16, possibly with the
interconnection of a sight glass 67, to the expansion valves 27, 28 via solenoid valves 48, 49,
whereby the circuit for a refrigerant 68 is closed.
To defrost the heat exchanger 15, 16 a hot gas regulator 69 is connected by line 70 to line 61.
The hot gas regulator 69 comprises in turn a pressure sensor 71, which is connected by a pres-
sure line 72 to the output of the hot gas regulator 69. The output of the hot gas regulator 69 is
connected to the solenoid valves 31, 32 for the hot gas by a by-pass line 73 which divides in
turn into the bypass lines 29 and 30 for each heat exchan~er 15, 16. The solenoid valves 31, 32
are provided with a drive 74, 75 for remote control by the control device 24.
The temperature sensors 54, 55 are connected by control lines 76, 77 to the expansion valves
27, 28. Of course, it is also possible to tran.sfer the measurement results of the temperature sen-
sors 54, 55 and the pressure sensors 50, 51 and 71 via control lines 78, as shown by dash-dot
lines, to the control device 24, which can control the expansion valves 27, 28 via the control
line 43, 46.
The control device 24 is here connected by lines 79, 80 to a current source 81 which is prefer-
ably in the form of an electricity supply company network. The solenoid valves 31, 32 can in
addition also be connected to the control device 24 by control lines 42, 47.

CA 02201111 1997-03-26
Wo 1~6 Kcr/AT95~0187
- 13 -
Furthermore, solenoid valves 21, solenoid v~lves 48, 49 and solenoid valves 31, 32 are pro-
vided with a drive 82. The drive 82 is here connected by control lines 42, 44, 4~, 47, 83, 8~ to
the control device 24 which can be in the form of electromagnets or electric servomotors, for
example stepping motors or the like.
The expansion valves 27, 28 are connected by the control lines 43, 46 to the control device 24,
whereby the amount of the refrigerant 68 to be expanded can be controlled or monitored.
As described in Fig. 1 the output of the heat exchallger 15 is connected by the return line 38
10 with the interconnection of the check valve 40 to the input of the heat exchanger 16 or the con-
nection line 18. The output of the heat exchanger 16 is however connected to the input of the
heat exchanger 15 by the return line 39 with the interconnection of the check valve 41.
The gas 2 to be compressed in the device l shown in Fig,. 1 is suctioned by the compressor 4
via the heat exchanger 16 of the refrigerating drier 6, the opened sealing flap 13, the suction
line 8 and suction point 9 and compressed in the compressor 4 by the desired amount. The heat
exchanger 16 is arranged in a refrigerant circuit in order to permit the cooling of the suctioned
gas 2 and the separation of the liquid contailled in the suctioned gas 2 and its removal.
20 To explain better the different function Oll cooling the suctioned gas 2 with the heat exchangers
15 or 16 of the refrigerating driers 5 or 6, all the lines in the refrigerant circuit which are re-
quired to cool the suctioned gas 2 with the heat exchanger 16 of the refrigerating drier 6, are
indicated by broken lines.
25 The gaseous refrigerant 68 highly compressed by the refrigerant compressor 23 is fed through
the condenser 59 and brought into the liquid state by cooling and then fed into the liquid con-
verter 64. From here the refrigerant 6X passes thl ough the heat exchanger 56, pressure line 66
and pressure line 26 to the solenoid valve 49. If the solenoid valve 49 is opened by the control
device 24 via the control line 84 the liquid refrigerant 68 can flow further to the expansion
30 valve 28. By means of the drop in pressure ill the connection line 18 arranged downstream of
the expansion valve 28 the liquid refrigerant 68 expands and enters into a gaseous state. As in
the expansion of the refrigerant 68 energy is used in order to obtain the transfer from the liquid
into the gaseous state. The required ener~y is taken from the liquid refrigerant 68 and the heat
exchanger 16. Here cooling occurs by means of the vaporisation coldness.
On the operation of such a device 1 the arrangement can be such that the refrigerant 68 in the
line 61 has a temperature of between + 70C and + 105C, preferably +80C to +90C and is

CA 02201111 1997-03-26
wo 156 PCTIAT95~187
- 14-
gaseous at the selected compression pressure. In the condenser 59 for example by means of the
cooling-water circuit 60 or with corresponding air cooling so much energy is removed from the
refrigerant 68, that the latter is cooled until under the existing pressure conditions it has a tem-
perature of between +25C and +60C, preferably +35C, whereby the pressure in a refrigerant,
in particular of the R22 type, is 13.5 bars. By means of this cooling the refrigerant 68 is lique-
fied and more heat energy is removed in the following heat exchanger 56 by means of cooling
in the reverse flow with cold, suctioned gaseous refrigerant 68 so that it flows to the expansion
valve 28 at a temperature of between ~15C and +25C, preferably +20C. Because of the drop
in pressure in the expansion valve 28 the liquefied refrigerant 68 enters the gaseous state,
whereby the amount of refrigerant 68 supplied by the expansion valve 28 is controlled so that
the pressure of the refrigerant 68 controlled by the pressure line 53 in the suction line 20 corre-
sponds for example to a nominal pressure of 4.8 bars and at the same time the temperature
monitored by the temperature sensor 55 is higher than the nominal temperature of 5C corre-
sponding to the nominal pressure of 4.8 bars. In this way, an overheating of the refrigerant 68 in
the suction line 20 is obtained, which, as explained in the following in more detail, ensures that
a transfer from the gaseous into the liquid state is excluded even with changing external influ-
ences, in order to prevent liquid impact in the refrigerant compressor 23.
Dependin~ on the amount of liquid refrigerant 68 supplied or expanded by the expansion valve
28, a larger or smaller amount of heat can be removed from the heat exchanger 16 and thus a
predeterminable temperature of the suctioned gas 2 can be obtained in the region of the suction
point 9, whereby in the region of the suction line 8 or the suction point 9 the temperature of the
suctioned gas 2 can be measured.
The amount of refrigerant 68 supplied by the expansion valve 28 can be regulated by means of
the pressure sensor 51 in a direct control circuit by the pressure existing in the pressure line 53,
which pressure sensor can change the opening width of the expansion valve 28, whereby in ad-
dition the control device 24 can influence the control values or the function of the expansion
valve 28. Such an additional influence of the expansion valve 28 by the control device 24 is
mainly necessary if an exact temperature of the suctioned gas 2 is required in the region of the
suction point 9 of the compressor 4 for the gas 2. If the control circuit is regulated using the
pressure line 53 and the pressure sensor 51 on the basis of pre-defined pressure conditions and
temperature conditions in the suction line 20, the temperature of the suctioned gas 2 at suction
point 9 can vary depending on the temperature of the gas 2 in the region of suction point 34.
For example, if it is colder in winter on the compression of air drawn in by the refrigerating
drier 5, 6, with equal refrigerating capacity the air is colder and accordingly denser at suction
point 9 of the compressor 4.

CA 02201111 1997-03-26
~0 15~ PCT/AT9~187
.
- 15 -
The temperature sensor 54 here detects the actual temperature and the pressure sensor the actual
pressure. With direct control in a closed colltrol circuit without any influence by the control de-
vice 24 the nominal temperature and the nominal pressure are adjusted at expansion valve 28.
By means of the pressure line 53 and the pressure sensor 51 and the temperature sensor 55
which is connected by the control line 77 to the expansion valve 28, the refrigerant 68 supplied
via the expansion valve 28 is controlled so that the actual temperature and the actual pressure
correspond to the nominal temperature and the nomillal pressure.
Furthermore, it is also possible that the temperature sensors 54, 55 and the pressure sensors 50,
51 are connected to the control device 24. Tn this case the actual temperature is detected by the
temperature sensors 54, 55 and the actual pressure by pressure sensors 50, 51 and conveyed to
the control device 24. The actual temperature and/or the ~ctual pressure is subsequently com-
pared in the control device 24 with the nominal temperature and/or the nominal pressure which
can be set by an input device, whereby the control device 24 subsequently activates the expan-
sion valves 27, 28 depending on the difference between the nominal and actual temperature
and/or pressure and thus the amount of liquid refrigerant 68 to be expanded can be controlled.
Once the refrigerant 68 has been brought into a gaseous state it flows through the heat ex-
changer 16, in which the suctioned gas 2 is cooled to the corresponding temperature.
Afterwards, the gaseous refrigerant 68 flows through the suction line 20 and the solenoid valve
21 to the suction line 22 and from there into the heat exchallger 56. From here the gaseous re-
frigerant 68 is drawn through the suction line 57 by the refrigerant compressor 23. By
compressing the gaseous refrigerant 68 with the refrigerallt compressor 23 the gaseous refriger-
ant 68 is compressed to a high pressure and afterwards is liquefied in the condenser 59 by
cooling whereby the refrigerant circuit is closed.
After, as described with reference to the block diagram in Fig. 2, the gas 2 drawn in by the
compressor 4 has been cooled in the refrigerating drier 6, with reference to Fig. 3 the defrosting
cycle is described for the said refrigerating drier 6, which was previously responsible for cool-
ing the gas 2, in which the deposit of condensate Oll the heat exchanger 16 in the form of ice is
defrosted. The circuit of lines required to defrost the ice is illustrated by broken lines.
During the defrosting process described in the following the gas 2 required for the compressor
4 is cooled in the refrigerating drier 5 and supplied in cooled form to the compressor 4, as
shown in Fig. 1. The layer of ice on the heat exchanger 16 is formed in that by the overcooling
of the suctioned gas 2 the moisture contained in the gas 2 is separated and frozen solid by the
be~ow freezing temperatures ill the region of the heat exchanger 16. As such a layer of ice has a

CA 02201111 1997-03-26
WO'~ 156 PCT/AT95~0187
- 16-
high insulating effect after a certain period of operation, the heat absorption of the refrigerant
68 in the heat exchanger 15 or 16 is no longer sufficient to ensure the desired overcooling of the
suctioned gas 2.
5 This is monitored for example in the operating heat exchanger 16 so that by means of tempera-
ture sensors 55 and pressure sensors 51 in the re~ion of the suction line 20 the temperature or
the pressure of the refrigerant 68 is monitored after leaving the heat exchanger 16.
If the temperature or the pressure of the gaseous refrigerant 68 emerging from the heat ex-
10 changer 16 is lower than the nominal temperature or the nominal pressure i.e. insufficient
coldness is removed from the refrigerant 68 in the heat exchanger 16 because of the insulating
effect of the layer of ice, this is detected by the control device 24 taking into account any other
parameters, such as for example the temperature of the environment. Of course, it is possible
that the control can be performed to introduce the defrosting process over a presettable period
15 of time.
During the defrosting process described in the following the gas 2 required for the compressor
4 is cooled in the refrigerating drier 5 and supplied in a cooled form into the compressor 4, as
described in Fig. 1.
By means of the control device 24 the gasproof sealing flap 13 assigned to the heat exchanger
16 to be defrosted is then closed and the expansion valve 28 is pressurised by the control device
24 so that the supply of liquid refrigerant 68 is interrupted.
Furthermore, the drive 74 of the solenoid valve 32 is pressurised by the control device 24,
whereby the bypass line 30 is connected to the connection line 18 and the hot gas discharged by
the hot gas regulator 69 is fed via the bypass line 73 into the connection line 18 of the heat
exchanger 16. In this way the inner chamber of the heat exchanger 16 is heated. On being
heated the ice, which has accumulated on the walls of the heat exchanger 16 or on the walls of
the refrigerating drier 6, defrosts and flows off through the outflow 36 as shown in Fig. 1.
For defrosting which is only necessary when the temperatures of the gas 2 required by the com-
pressor 4 are below 0C, which is predominantly the case in the installations described here, the
hot gaseous refrigerant 68, e.g. at a temperature of between +70C and +105C, is supplied via
the bypass line 30 and the solenoid valve 32 into the connection line 18 of the heat exchanger
16 between the latter and the expansion valve 28.

CA 02201111 1997-03-26
WO ~ 56 1'~/AT95/(01~7
-17-
During this supply of hot, gaseous refrigerant 68 into the heat exchanger 16 the gasproof seal-
ing flap 13 is closed, cf. Fig. 1. This is because on defrosting the layer of ice on the heat
exchanger 16 vapour is produced which is saturated with water, and if the sealing flap 13 was
not gasproof the vapour could be suctioned by low pressure into the suction line 8 and thus
reach the compressor 4, whereby the desired drying effect of the suctioned gas 2 would not oc-
cur or there is a risk of water impact in the compressor 4.
E;urthermore, the solenoid valve 21 of the suction line 20 is also closed whereby the suction line
20 is connected by the return line 39 with the interconnection of the check valve 41 to the con-
10 nection line 17, and the heat exchanger lS, in which the suctioned gas 2 is cooled, is supplied
with the cooled refrigerant 68 of the heat exchanger 16. The hot, gaseous refrigerant 68 sup-
plied via the bypass line 30, the amount of which is controlled by the hot gas regulator 69
amounts to only a small proportion for example l() to 20 % of the total refrigerant 68 expanded
by the expansion valve 27.
By means of the coldness in the refrigerating drier 6 to be defrosted the hot, gaseous refrigerant
68 is liquefied by cooling and passes from the output of the heat exchanger 16, i.e. the suction
line 20, via the return line 39 and the check valve 41 to the connection line 17 of the heat ex-
changer 15. Thus a gaseous, cold refrigerant 68 for the heat exchanger 15 of the refrigerating
20 drier 5 flows through the connection line 17. Bec~use of the difference in pressure between the
connection line 17 and the return line 39 the refrigerant 68 liquefied by the heat exchanger 16 is
again gaseous and mixes with the gaseous refrigerant 68 in the connection line 17, whereby the
refrigerant circuit is closed for the defrosting of the refrigerating drier 6.
25 After reaching a preadjustable inner temperature of the refrigerating drier 6 to be defrosted the
control device 24 opens sealing flap 37 and closes sealing flap 33 of the refrigerating drier 6, so
that the air saturated with water on defrosting at a specific temperature cannot be drawn in by
the refrigerant compressor 23.
30 Time is available for the defrosting phase of the refrigerating drier 6 or 5, until the heat ex-
changer 16 or 15 used to overcool the drawn in gas 2 is so iced up that the cooling effect
necessary for overcooling the suctioned gas 2 is no longer sufficient.
Furthermore, a bypass line 85 is assigned to the refrigerant compressor 23 which extends be-
35 tween the suction line 57 and the line 61. In this bypass line 85 an excess pressure and a low
pressure control valve 86 are provided in order to prevent the refrigerant compressor 23 from
getting damaged. Because of the small amount of hot gaseous refrigerant 68 required to defrost

CA 02201111 1997-03-26
WO 56 PCr/AT95100187
the heat exchangers 15 or 16 respectively, the through-flow cross section of the return lines 38
and 39 is much smaller than the cross section of connection lines 17 and 18. With the inflow of
the liquid refrigerant 68 into the connection line 17 or 18, in which the level of pressure is low-
ered by the expansion valves 27 or 28 to the desired value, there is also an expansion of the
liquid refrigerant 68 supplied by the return line 39 or 38. The precise control and maintenance
of the desired pressure and temperature conditions in the suction lines 19 and 20 of the respec-
tive heat exchanger 15 or 16 used to cool the suctioned gas 2 is ensured in that the changing
conditions, in particular the temperature of the liquid refrigerant 68, which is supplied through
the return line 38 or 39 are compensated by adjustments and regulations of the expansion valve
27 or 28 in simplex operation.
Of course, it is also possible that after defrostin~ the refrigerant 68 can return via the return
lines 38, 39~ but before the respective expansion valves 27, 28 of the heat exchanger 15, 16
used for cooling, into the pressure lines 25, 26. It only has to be ensured that in the supply re-
gion of refrigerant 68 coming from the heat exchanger 16 or 15 to be defrosted the pressure in
said refrigerant 68 is higher than in the pressure lines 25 or 26. If this cannot be ensured in
every operational state the supply is possible via a Venturi nozzle arrangement for example or
the like.
Before the refrigerating drier 6 is put into operation again, i.e. before the defrost phase is com-
pleted, the refrigerating drier 6 is pre-cooled. Here the solenoid valve 49 is opened by the
control device 24. Thus the liquid refrigerant 68 passes from the refrigerant compressor 23 to
the expansion valve 28 by which the temperature to which the inner chamber of the refrigerat-
ing drier 6 is to be cooled is determined by the control device 24. Once the refrigerating drier 6
has been pre-cooled to the corresponding temperature if the refrigerating drier 5 is too heavily
iced-up the suction process for the gas 2 can be performed by the refrigerating drier 6. Further-
more, after pre-cooling is completed sealing flap 33 of the refrigerating drier 6 and sealing flap
37 can be closed by the control device 24.
Of course, a design of the device 1 shown in Figs. 1 to 3 is also possible without using the three
sealing flaps 33 and 37, whereby the gas 2 to be compressed by the compressor 4 is suctioned
into each refrigerating drier 5 or 6 independently.
In Fig. 4 a temperature path for the internal temperature in refrigerating drier 5 or 6 is shown in
which the x-axis indicates the time t in minutes and the y-axis the temperature T in C. The
characteristic curve 87 drawn in a solid line corresponds to the temperature path in the refriger-
ating drier S and the characteristic curve 88 drawn in a dash-dot line corresponds to the

CA 02201111 1997-03-26
V~'C) ISf) PCr/AT95/00187
19
temperature path in refrigerating drier 6.
As described above the refrigerating driers 5 and 6 are operated in different ways, i.e. refriger-
ating drier 5, as characteristic curve 87 shows, is switched from cooling mode to defrosting
mode and refrigerating drier 6 from defrosting mode to cooling mode. At time point 89 the de-
frost cycle for heat exchanger 16 is ended and refrigerating drier 6 is pre-cooled by the control
device 24 as described with reference to Figs. 2 and 3. At time point 90 the inner chamber of
refrigerating drier 6 is cooled to the temperature set by the control device 24 and it is possible
to switch from refrigerating drier 5 to refrigerating drier 6. However, it is also possible to main-
tain this state of pre-cooling for a longer period if refrigerating drier 5 is not too heavily
ced-up.
Once the defrost cycle has been commenced for the refrigerating drier 5 by the control device
24, as occurs at time point 90, the hot gaseous refrigerant 68 flows through the heat exchanger
15 of refrigerating drier 5, whereby the temperature in the inner chamber of the refrigerating
drier 5 begins to rise. At the same time as the commencement of the defrost cycle for refrigerat-
ing drier 5 the cooling cycle is started for refrigerating drier 6. This is shown in turn at time
point 90. Furthermore, it is possible to perform the pre-cooling phase at the corresponding
temperature of the refrigerating drier S in order to ensure a rapid, low loss switching from re-
frigerating drier 5 to refrigerating drier 6. At time point 91 the refrigerating drier 6 has reached
the temperature set by the control device 24 and can cool the suctioned gas 2 accordingly.
By flowing the hot gaseous refrigerant 68 into the heat exchanger 15 of the refrigerating drier 5
the inner temperature in the refrigerating drier 5 increases further. At time point 92 the inner
temperature of the refrigerating drier 5 reaches the maximum value at which the ice begins to
melt. At time point 93 the defrosting process is completed for refrigerating drier 5 and the con-
trol device 24 controls the device 1 so that the refrigerating drier 5 is pre-cooled and thus the
position of the time point is obtained as previously for refrigerating drier 6 whereupon the fol-
lowing time points 91 to 93 are repeated.
This state can now be maintained over several periods if the refrigerating drier 6 is still not too
iced-up. At time point 90 it is established in refrigerating drier 6 by a temperature sensor 94,
which is shown in Fig. 1, that the desired cooling temperature for the suctioned gas 2 is no
longer being reached, and the control device 24 then switches the refrigerating drier 6 to de-
frosting mode and at the same time activates the refrigerating drier 5 for the cooling of the
suctioned gas 2, whereby the refrigerating drier 5 is operated in cooling mode and the refriger-
ating drier 6 in defrosting mode.

~ CA 02201111 1997-03-26
wo ~ 56 PCT/AT95/~187
- 20 -
Fig. 5 shows a possible design variant of the device 1 according to the invention for compress-
ing gases 2 which are indicated schematically by arrows 3. Here the same reference numbers
are used for parts which correspond to parts of the previously described émbodiments. Here the
gas 2 is suctioned by the compressor 4 over the suction points 34 of the respective refrigerating
5 drier 5, 6 and cooled therein.
The difference from the design variant described in Fig. 1 is that in each of the two refrigerating
driers 5, 6 two heat exchangers 95, 15 or 96, 16 are arranged behind one another in the direc-
tion of flow. Whilst the heat exchangers 15, 16 in the previously described manner are driven
10 by the refrigerant circuit, comprising the refrigerant compressor 23, various solenoid valves 21,
31, 32 and expansion valves 27, 28, a separate refrigerant circuit is provided for the additional
heat exchangers 95, 96. Thus each input of the heat exchangers 95, 96 is connected by its own
connection line 97, 98 with the interconnection of an expansion valve 99, 100 to the output of
its own condenser 59 for this refrigerant circuit, which is connected downstream of an addi-
15 tional refrigerant compressor 23. The SUCtiOll point of the refrigerant compressor 23 isconnected by the suction line 57 with the interconnection of solenoid valves 101, 102 to the
suction lines 103, 104 connected downstream of the heat exchangers 95, 96 in the direction of
flow. The expansion valves 99, 100 and the solenoid valves 101, 102 are in turn connected by
control lines 105 to 108 to the control device 24.
In this illustrated embodiment no possibility is provided in the refrigerant circuit for the heat
exchangers 95, 96 to supply one of the two heat exchangers 95, 96 optionally with hot, gaseous
refrigerant 68 for defrosting. Rather with the alternate defrosting of the heat exchangers 15, 95
or 16, 96 there is only a corresponding heating of the heat exchanger 15 or 16 with hot, gaseous
25 refrigerant 68, as described in detail with reference to Figs. 2 and 3 and by heating the heat
exchangers 15 or 16 the ice is also defrosted on the heat exchangers 95, 96. If the heat output of
the heat exchangers 15 or 16 is not sufficient to defrost the refrigerating driers 5 or 6 it is of
course also possible to design the refrigerant circuit of the heat exchangers 95, 96 so that the
corresponding return lines 38, 39 and the solenoid valves 31, 32 required therefor are also in-
30 corporated therein so that each of the two heat exchangers 95, 96 can be defrosted by the supplyof hot, gaseous refrigerant 68 in the same way as the heat exchangers 15, 16.
Of course, it would be possible to provide a joint refrigerant compressor 23 instead of two sepa-
rate refrigerant compressors 23 for the heat exchangers 15, 16 or 95, 96. Because of the greater
35 operational reliability and the lower cost of refrigerant compressors 23 with smaller capacity it
is recommended to use a separate refrigerant compressor 23 for each of these refrigerant cir-
cuits. This has the advalltage that if ol1e refri~erallt compressor 23 fails at least a proportion of

CA 02201111 1997-03-26
WO 15~. PCr/AT95/~18
- 21 -
the cooling required for the suctioned gas 2 is possible and the device 1 according to the inven-
tion can continue to be operated albeit with a lesser degree of efficiency.
The method for compressing gases 2 according to the present embodiment is as follows:
The gas 2 to be compressed in the device 1 shown is suctioned into the refrigerating drier 6, for
example via the refrigerating drier 6, i.e. via the suction point 34 of the opened sealing flap 33
of the refrigerating drier 6. The suctioned gas 2 then passes through the heat exchanger 96 in
which the suctioned gas 2 is pre-cooled. Afterwards, the suctioned gas 2 passes through the
heat exchanger 16 and is cooled thereby to the desired temperature and reaches the compressor
4 via the suction line 8 and the opened sealing flap 13.
If the gas 2 suctioned by the heat exchangers 16 and 96 is cooled the expansion valves 28 and
100 and the solenoid valves 21 and 102 are controlled by the control device 24. In this way, the
cold, gaseous refrigerant 68 can flow via the connection line 18 and 98 into the heat exchanger
16 and 96, whereby the gas 2 is cooled on the inside of the refrigerating drier 6.
Simultaneously, with the activation of the expansion valves 28 and 100 the solenoid valve 21
and 102 is controlled by the control device 24 via the control lines 45 and 107, whereby the
cold, gaseous refrigerant 68 can flow from the heat exchanger 16 and 96 via the suction lines 20
and 104 to the suction lines 22 and 57 and to the refrigerant compressors 23.
The cooling of the suctioned gas 2 is performed now in the two heat exchangers 16 and 96. The
two heat exchangers 16 and 96 are operated within different temperature ranges, i.e. heat ex-
changer 96 has a temperature of e.g. -10 and heat exchanger 16 has a temperature of e.g.
-20C, whereby the suctioned gas 2 is pre-cooled on flowing through the heat exchanger 96 and
is finally cooled by heat exchanger 16 to the prescribed temperature. This has the advantage
that the suctioned gas 2 can be cooled to a lower temperature whereby it is ensured that the
condensate contained in the gas 2 is separated.
By cooling the gas 2 in the refrigerating drier 6, as already explained in connection with the
previously described Figs., on cooling the gas 2 to below 0C ice is formed inside the refriger-
ating drier 6 or 5, whereby the refrigerating driers 5, 6 have to be defrosted alternately. Here, as
shown in refrigerating drier 5, the sealing flap 12 is closed, so that the compressor 4 cannot
suction any gas 2 through the refrigerating drier 5. Simultaneously with the closing of sealing
flap 12 the control device 24 triggers the solenoid valve 317 whereby hot, gaseous refrigerant 68
passes through the bypass line 29 into the connection line 17 from the refrigerant compressor

CA 02201111 1997-03-26
WO 156 PCT/AT95/~187
- 22 -
23 and thus the heat exchanger 15 is heated. The heated refrigerant 68 flows in turn from the
output of the heat exchanger 15, as explained in detail in Fig. 3, via the check valve 40 and the
return line 38 to the input of heat exchanger 16 and there is fed into the connection line 18 so
that it mixes with the cold gaseous refrigerant 68 and the refrigerant circuit is closed.
On flowing hot refrigerant 68 through the heat exchanger 15, the heat exchanger 15 heats up,
whereby the ice on the heat exchanger 15 and on the walls of the refrigerating drier 5 is de-
frosted. Simultaneously, an accumulation of heat builds up in the refrigerating drier 5 whereby
the heat exchanger 95 is also defrosted and thus ice flows out of the outflow 36 in the form of
water.
In Fig 6. a different embodiment of the solution according to the invention is shown in which
for reasons of clarity only one of the previously described refrigerating driers 5, 6, namely re-
frigerating drier 5, is shown. The function and interconnection of the shown refrigerating drier
5 with the not shown refrigerating drier 6 can be ascertained from the previously described
Figs. 1 to 5. Furthermore, the same reference numbers are used for those parts which corre-
spond with the parts in the previously described Figs. On using the refrigerating drier 5 shown
usually, but not necessarily, refrigerating drier 6 is also identical in design.
The shown refrigerating drier 5 for suctioning gases 2 for the compressor 4 differs from those
in the previously described embodiments in that there is a climatic zone 109 and a cooling zone
110. The climatic zone 109 comprises three heat exchangers 111 to 113, whilst the cooling
zone 110 comprises four heat exchangers 114 to 1 17. Each of the heat exchangers 111 to 113
and 114 to 117 comprises a through pipe coil or pipe spiral, over which the suctioned air to be
cooled flows. In the layout and arrangement of the individual pipe coils of the individual heat
exchangers 111 to 113 and 114 to 117 it should be ensured that the latter are of equal length
and come into contact with approximately the same amount of suctioned air so that the emit-
tance of heat is almost equal over the length of each of these heat exchangers 111 to 117 and so
that no difference in pressure can build up in the individual heat exchangers 111 to 117 between
their input and output.
The heat exchangers 111 to 113 of the climatic zone 109 and the heat exchangers 114 to 117 of
the cooling zone 110 are in turn connected by pressure lines 118 to 124 with the interconnec-
tion of expansion valves 125 to 131 and connection lines 17, 18. Furthermore, pressure lines
118 to 124 are connected to one or several refrigerant compressors 23 which are not shown for
reasons of clarity. The outputs of the heat exchangers 111 to 117 are connected via suction lines
13~to 138 with the interconnection of solenoid valves 139 to 145 to one or several refrigerant

CA 02201111 1997-03-26
~0 15~ PCT/AT95/~187
- 23 -
compressors 23, whereby the refrigerant circuit is closed for the refrigerant 68.
Furthermore, the refrigerant compressors 23 are conllected by bypass lines 146 to 152 with the
interconnection of a solenoid valve 153 to 159 to connection lines 17, 18 and between the ex-
pansion valves 125 to 131 and the heat exchangers 111 to 117.
In Fig. 6 the return lines 160 to 166 are also shown schematically which are connected between
theexpansionvalves 125 to 131 and the heatexchangers 111 to 117. Saidreturnlines 160 to
166 are connected to the output of the heat exchangers in refrigerating drier 6 with the intercon-
nection of a check valve. At the output of the heat exchangers 111 to 117 further return lines
167 to 173 are connected to the suctioll lhles 132 to 138, upstream of the solenoid valves 139 to
145. The ends of the return lines 167 to 173 are connected to the corresponding inputs of the
heat exchanger to the refrigerathlg drier 6 with the interconnection of a check valve 174 to 180.
By means of the connection of the refrigerating drier 5, 6, via the return lines 160 to 173 the
device 1 can be operated as explained in the previously described Figs.
Furthermore, it should be noted that an equal number of heat exchangers 111 to 117 can be ar-
ranged both in the climatic zone 109 and in the cooling zone 110. Of course, it is possible that
the individual heat exchangers 111 to 117 can be operated both individually and in parallel or
together with the control device 24.
If the heat exchangers 111 to 117 are driven individually by the control device 24 it is possible
to determine the inner temperature of the refrigerating drier 5, 6 by the number of active heat
exchangers 111 to 117 without the amount of refrigerant 68 to be expanded having to be con-
trolled. Of course, it is pos.sible that any number of heat exchangers 15, 16 are used in the
individual refrigerating driers 5, 6,
Fig. 7 shows a different design variant of the solution according to the invention as described in
Fig. 6. For reasons of clarity only one refrigerating drier 5 or 6, namely refrigerating drier 5 is
shown. The function and the interconnection of the shown refrigerating drier 5 with the not
shown refrigerating drier 6 can be selected according to any of the previously described em-
bodiments in Figs. 1 to 6. Furthermore, the same reference numbers are used for those parts
which correspond to the parts in the previously described Figs. On using the shown refrigerat-
ing drier 5 usually, but not necessarily, refrigerating drier 6 is designed to be identical and
usually two refrigerating driers 5, 6 are arranged in parallel which are operated alternately. The
advantages can however also be obtained by using only one refrigerating drier 5 or 6.

CA 02201111 1997-03-26
~'0 ~ 156 PCT/AT95/~187
- 24-
The difference from the design variant shown in Fig. 6 is that several heat exchangers 114 to
116 are arranged in the cooling zone 110 which are however only supplied with gaseous refrig-
erant 68 via a single, joint connection line 17. The connection line 17, as in the previously
described embodiments. is connected to a refrigerant compressor 23 via an expansion valve 125
with a pressure line 119. The output of the heat exchangers 114 to 116 is in turn connected to
the refrigerant compressor 23 by a suction line 132 with the interconnection of a solenoid valve
139, whereby the refrigerant circuit for cooling the suctioned gas 2 is closed. The supply lines
for the heat exchangers 114 to 116 are thus connected to the connection line 17 or the suction
line 132 before entering into the refrigerating drier 5. In this embodiment it should be ensured
that the line length of the individual heat exchangers 114 to 117 and the line diameter of the
heat exchangers 114 to 117 are of equal size. In this way a pressure difference should be pre-
vented from being created between the individual heat exchangers 114 to 117 as otherwise the
gaseous refrigerant 68 seeks a path of least resistance through the heat exchangers 114 or 117.
As a result the other heat exchangers 114 to 117 are not flowed through with the same amount
of gaseous refrigerant 68, which would result in a reduction in performance. Furthermore, in
Fig. 7 a bypass line is also shown with a solenoid valve 153, which, as described in Fig. 6, is
connected to the refrigerant compressor 23. Said bypass line 146 is connected to the connection
line 17 between the expansion valve 125 and the intersection of the individual connection lines
for the heat exchangers l l~ to 117, whereby a defrosting of the heat exchangers 114 to 117 is
possible.
The climatic zcne 109 in this embodiment is also formed from several individual heat exchang-
ers 111 to 113, which in turn are connected by a single connection line 18 to the expansion
valve 129. The expansion valve 129 is in turn connected by a pressure line 118 to the same
refrigerant compressor 23 or a further refrigerant compressor 23. The output of the heat ex-
changers 111 to 113 is connected to the same refrigerant compressor 23 which supplies the
pressure line 118 by means of a suction line 136 with the interconnection of solenoid valve 143.
The supply lines of the individual heat exchangers 111 to 113 are split outside the refrigerating
drier 5, so that the refrigerant can flow from the connection line 18 into the individual heat ex-
changers 111 to 113. Here too it should be noted, as already described, that the line length and
the diameter of the lines of the individual heat exchangers 111 to 113 are equal in size in order
to avoid differences in pressure between the individual heat exchangers 111 to 113. The cli-
matic zone 109 can for example also be connected to the connection line 18 by a bypass line
150 with the interconnection of a solenoid valve 157, whereby a defrosting of the climatic zone
109 is possible with the supply of hot refrigerant gas through the bypass line 150.
Furthermore, the refrigerating drier 5, as described in Fig. 6, comprises the return lines 160,

CA 02201111 1997-03-26
u~o') 56 PCT/AT95/~187
-25-
164, 167 and 168 for interconnection with refrigerating drier 6, whereby the defrosting process
can be used, as in the previously described Figs. 1 to 6.
In Fig. 8 a different design variant is shown which is similar to the embodiment described pre-
S viously with reference to Figs. 6 and 7. Again for reasons of clarity only one of the two
refrigerating driers 5, 6 is shown, namely refrigerating drier 5. The function and interconnection
of the shown refrigerating drier S with the not shown refrigerating drier 6 can be taken from the
previously described Figs. 1 to 7. Furthermore, the same reference numbers are used for those
parts which correspond to parts in the previously described Figs. On using the shown refrigerat-
ing drier 5 usually, but not necessarily, refrigerating drier 6 is identical in design.
In this design variant the climatic zone 110 is formed from only one heat exchanger 114. How-
ever, it is also possible for several heat exchangers 114 to be used. The heat exchanger 114 is
then formed from several refrigerant lines 181 to 184 whereby the individual refrigerant lines
181 to 184 in turn are connected outside the refrigerating drier 5 to the connection line 17. Here
it should be ensured that the cross section of the line and the length of the individual refrigerant
lines 181 to 184 are of equal size, in order, as already described, to prevent dirrerellces in pres-
sure. Of course, on using several heat exchangers 114 the refrigerant lines 181 to 184 in the
individual heat exchangers 114 can be different, if the latter are controlled by their own expan-
sion valve 125.
The connection line 17 is in turn connected to the pressure line 119 via the expansion valve
125. The pressure line 119 is connected to the refrigerant compressors 23 as in the previously
described Figs. The output of the heat exchanger 114 is in turn connected via a suction line 132
with the interconnection of a solenoid valve 139 to the refrigerant compressor 23 which is con-
nected to the pressure line 1119. The individual refrigerallt lines 181 to 184 are here connected
between the solenoid valve 139 and the input or the output of the heat exchanger 114 to the
suction line 132.
In order now to defrost the heat exchanger 114, a bypass line 146 is connected by the refriger-
ant compressor 23 to the connection line 17 with the interconnection of a solenoid valve 153,
between the expansion valve 125 and the division of the connection line 17 into the individual
refrigerant lines 181 to 184.
In the climatic zone 109 a different embodiment of a heat exchanger 111 is shown. The heat
exchanger comprises three refrigerant lines 185 to 187. The refrigerant lines 185 to 187 are
connected respectively to an expansion valve 129 to 131 via the connection line I8, whereby

-
, CA 02201111 1997-03-26
W09 ~ 56 PCT/AT95/~187
- 26 -
the individual refrigerant lines 185 to 187 can have different lengths and diameters of different
sizes as with the pre-arrangement of the expansion valves 129 to 131 a precise through-flow of
the refrigerant 68 through the refrigerant lines 185 to 187 can be controlled by the control de-
vice 24. The expansion valves 129 to 131 are here connected to one or several refrigerant
5 compressors 23 by the pressure line 1 18.
At the output of the heat exchanger 1 1 1 the refrigerant lines 185 to 187 are connected to the
solenoid valves 143 to 145. Afterwards, the outputs of the solenoid valves 143 to 145 are con-
nected to the suction line 136 which is in turn connected with the refrigerant compressor 23.
' - ' ' '
At the same time e.g. each refrigerant line 185 to 187 has its own bypass line 150 to 152 with
interconnected solenoid valves 157 to 159, by means of which the climatic zone 109 can also
be defrosted. Furthermore, the individual connectioll lines 17, 18 and the refrigerant lines 185
to 187 are connected to the return lines 160, 164 to 166, 167, 171 to 173, whereby the previ-
ously described process can be applied.
Fig. 9 shows a modified design variant of the device 1 described in Figs. 2 and 3 and therefore
the same reference numbers are used for the same parts as in Figs. 2 and 3.
The difference from the design variant described in Figs. 2 and 3 is that in the device 1 the re-
turn lines 38, 39 leading away from the refrigerating driers 5, 6 are connected via a Venturi
valve 188, 189 to the pressure lines 25, 26. That is the return lines 38, 39 no longer enter into
the connection lines 17, 18 but are arranged between the expansion valves 27, 28 and the sole-
noid valves 48, 49. It is however also possible as shown in dashed lines that the return lines 38,
39 are connected to the pressure line 66 upstream of the solenoid valves 48, 49.
With the connection of the return lines 38, 39 to the pressure lines 25, 26 and pressure line 66 it
is necessary to arrange the Venturi valve 188, 189, as the pressure in the pressure lines 25, 26 is
much higher than the pressure in the return lines 38, 39. By the arrangement of the Venturi
valves 188, 189 an area of low pressure is created in the return lines 38, 39, through which the
liquid refrigerant 68, which on defrosting the refrigeratillg driers 5, 6 exits at the output of the
heat exchangers 15, 16, is suctioned into the pressure lines 25, 26. The defrosting of the heat
exchangers 15, 16 and the cooling of the suctioned gas 2 is performed as described in Figs. 1 or
5.
Furthermore, at the refrigerant compressor 23 the pressure of the gaseous refrigerant 68 in the
suction line 57 is detected directly at the input by a pressure gauge device 190. Simultaneously

CA 02201111 1997-03-26
U'O' ~ l~h PCT/AT95/~187
- 27 -
however, at the output of the refrigerant compressor 23 the pressure in the line 61 of the com-
pressed gaseous refrigerant 68 can also be Aetected by a pressure gauge device 191. If the
pressure difference between the input and the output of the refrigerant compressor 23 is too
high the control device 24 can identify a leaking point in the line system of the device 1 and if
S necessary switch off the device 1. This safety switching prevents the refrigerant compressor 23
drawing in gases 2 from the atmosphere which are saturated with water, whereby water impact
on the refrigerant compressor 23 is prevented.
Of course, the pressure gauge devices 190 and 191 can be arranged at any other point of the
line system of the device 1. The advantage of the arrangement of the pressure gauge devices
190, 191 directly on the refrigerant compressor 23 is that the pressure of the refrigerant 68 is
changed slightly by the line system and thus if it is arranged at any different point of the line
system a false measurement could occur.
Furthermore, in Fig. 9 a different embodiment of the return of the refrigerant 68 is shown. This
variant comprises snifter lines 192, 193 which are indicated by a dash-dot line. The snifter lines
192, 193 are connected to suction line 19, 20 and the additional suction line 22, whereby the
solenoid valves 21 are bridged in the suction lhles 19, 20. In thi.s embodiment return lines 38,
39 are not necessary, as the cooled liquid refrigerallt 68 which is used to defrost the refrigerat-
ing drier 5, 6 can now flow through the snifter lhles 192, 193 directly into the suction line 22.
By means of the pressure difference in the suction line 22 and in the snifter line 192 or 193 the
liquid refrigerant 68 becomes gaseous again and can thus be suctioned by the refrigerant com-
pressor 23 without water impact occurring on the refrigerant compressor 23.
In Fig. 10 a compressed air arrangement 194 is shown. The compressed air arrangement 194
comprises several individual devices 195 to 197 in which the designs of the individual devices
195 to 197 can correspond to the devices 1 previously described in Figs. 1 to 7. The devices
195 to 197 are connected by collective lines 198 to ~ compressed air tank 199. Users 201 are
connected to the compressed air tank 199 by hoses 200 which for example can be in the form of
blow guns 202 or gas or oil burners in power stations or other compressed air users.
A central control unit 203 is connected by a bus system 204 to the individual control elements
205, whereby each device 195 to 197 can have several control elements 205 which control the
functions of the individual devices 195 to 197, as in the previously described Figs. Further-
more, control elements 205 are arranged on the compressors 4 of the devices l9S to 197 and on
the compressed air tank 199 in order to control or regulate the switching on and off of the de-
vice 195 to 197 and the pressure in the compressed air tank 199 by the central control unit 203.

CA 02201111 1997-03-26
WO ~ 56 PCT/AT95/~187
- 28 -
If the compressed air arrangement 194 is operated the central control unit 203 checks the vol-
ume or the pressure of the compressed air in the compressed air tank 199 by the bus system 204
and the control element 205 of the compressed air tank 199 and simultarieously measures the
consumption of compressed air 206 by the user 201 at the output of the compressed air tank
199. Once the central control unit 203 has detected the pressure or the volume of compressed
air in the compressed air tank 199 and the consumption 201 of compressed air 206, the central
control unit 203 activates the individual devices 195 to 197 via the bus system 204, i.e. with the
maximum use of compressed air 206 the central control unit 203 switches on all devices 195 to
197. However, if less compressed air 206 is used the central control unit 203 can activate the
devices 195 to 197 individually, whereby the volume of the gas 2 suctioned by the individual
devices 195 to 197 can be controlled.
It is also possible to connect to~ether various devices 195 to 197 with different capacities in the
compressed air arrangement 194, whereby a control of the consumption or the compressed air
206 to be produced can be regulated more precisely, as by grading the devices 195 to 197 it is
possible to make a precise adjustment to the consumption of compressed air 206 by the user
201.
If the central control unit 203 establishes for example that less compressed air 206 is needed by
the user 201 the pressure in the compressed air tank 199 rises, whereby the central control unit
203 switches off one of the devices 1~5 to 197, e.~. device 195 and thereby less compressed air
is produced, whereby the amount of compressed air 206 produced is adjusted to the consump-
tion of the user 201. If however more compressed air 206 is required by the user 201 the
pressure of the compressed air 206 in the compressed air tank 199 falls, whereby the central
control unit 203 detects the drop in pressure via the control element 205 and afterwards reacti-
vates device 195 again via the bus system 204.
An advantage of this design of the compressed air arrangement 194 is that several devices 195
to 197 of different constructions and different capacities can be used whereby a rapid and pre-
cise adjustment of the consumption of compressed air to the production of compressed air 206
is made possible.
Of course, it is also possible that the devices 195 to 197 each have their own control device 24,
whereby each device 195 to 197 is controlled by its own control device 24. Furthermore, it is
also possible that the central control unit 203 cooperates via bus system 204 with several off-
centre control devices 24, which are assigned to the individual devices 195 to 197. The off-
centre control devices 24 then take over colltrol of the devices 195 to 197 and only the higher

CA 02201111 1997-03-26
~'O 1~6 ~`/AT9~/~187
- 29 -
control functions, for example, establi~.hing how many of the devices 195 to 197 are being op-
erated or the central detection of the output data and the visualisation of the operating states of
the individual devices 195 to 197 or the entire system in real-time or the necessary evaluations
therefor. Of course, the central control unit 203 can also be formed by corresponding micro-
S processors, for example conventional personal computers with graphics terminals or the like.
Furthermore, a suction device 207 is shown in Fig. 10 for drawing in gas 2. This suction device207 can be used for all the above-mentioned embodiments of Figs. 1 to 9.
The suction device 207 has two openhlgs 208, 209 for drawing in the gas 2 whereby opening
208 leads directly into the refrigerating drier 5 and the other opening 209 leads into the refriger-
ating drier 5 via a particle filter 210. The openings 208, 209 can thus be opened or closed by the
central control unit 203 by controlling sealing flaps 211, 212 in the lines, i.e. on activating seal-
ing flap 211 and sealing flap 33 the opening 208 is activated and on activating sealing flap 212
with sealing flap 33 the gas 2 is suctioned through the particle filter 210. This has the advantage
that the particles of dirt contained in the gas 2 are filtered out in the particle filter 210. The par-
ticle filter must be activated when the suctioned gas 2 contains too little moisture or water, in
order to wet the surfaces of the heat exchangers so that the particles of dirt are separated inde-
pendently. This is relevant if the gas 2 has a low temperature compared to the planned suction
temperature, e.g. in winter.
Furthermore, Fig. 11 shows a different embodiment of the compressed air arrangement 194
shown in Fig. 10, in which the same reference numbers are used for the same parts.
The difference from the compressed air arrangement 194 shown in Fig. 10 is that the compres-
sors 4 for suctioning the gas 2 no longer suction, as described in Fig. 10, via the refrigerating
driers 5, 6, but the compressors 4 firstly draw gas 2 from the atmosphere, compress it and fi-
nally cool it to a specific temperature via the refrigerating driers 5, 6. Furthermore, the water
vapour contained in the atmosphere or in the gas 2 is removed in the refrigerating driers 5, 6.
The cooled air is then conveyed further by the individual devices 195 to 197 into the com-
pressed air tank 199 from where it can be directed to the user 201.
It is also possible, that the devices 195 to 197 are arranged both on the suction side of the com-
pressors 4 and on the pressure side of the compressors 4.
Of course, it is also possible to arrange only one refrigerating drier 5 or 6 after a compressor 4
for gas 2 and not several parallel connected devices with several parallel connected compres-

CA 02201111 1997-03-26
W09 ~ rCT/AT95/~187
- 30 -
sors 4, as shown in Fig. 1.
In this way, it is also possible to use the refrigerating drier 5, 6 according to the invention in
smaller installations not only in the suction region, i.e. before the compressor 4 but also in the
pressure region after the output of the compressor 4.
The advantages of the present invention and the measures described therein can be obtained in
very different types of compressors for gases 2, for example in screw compressors, piston com-
pressors, radial compressors or the like.
To illustrate the essential function of the devices 1 according to invention and the compressed
air arrangement 194 simplified circuit symbols are used and furthermore parts not essential to
the function, such as throttle valves and other components are omitted, their arrangement being
part of the specialist knowledge of one skilled in the art, e.g. a refrigerating technician. Any
individual elements known from the prior art can be used as individual components, in particu-
lar for the expansion valves 27, 28, 99, 100, refrigerant compressors, condensers and heat
exchangers.
In Fig. 12 a further embodiment of the solution according to the invention is shown. For rea-
sons of clarity again only one refrigerating drier 5 or 6 is illustrated, namely refrigerating drier
5, whereby the same reference numbers are used for the same parts contained in the previously
described Figs. 1 to 11.
The function and the interconnection of the shown refrigerating drier 5 with the not shown re-
frigerating drier 6 can be selected from any of the previously described embodiments of Figs. 1
to 11. On using the shown refrigerating drier 5, u~sually but not necessarily, refrigerating drier 6
is identical in design and usually two refrigerating dl iers 5, 6 are arranged in parallel which are
operated alternately.
The difference from embodiments shown in the previously described Figs. 1 to 11 is that the
refrigerating drier 5 is formed from several zones, in particular cooling zone 110 and climatic
zone 109 and an intermediate zone 213 arranged between the cooling zone 110 and the climatic
zone 109. Several heat exchangers 214 to 216 are arranged in the cooling zone 110. The heat
exchangers 214 to 216 are arranged preferably vertically above one another in the direction of
flow of the suctioned gas 2. The heat exchangers 214 to 216 in the intermediate zone 213 and
the climatic zone 109 are arranged in the same way. An advantage of this arrangement of the
heat exchangers 214 to 216 is that an improved cooling of the gas 2 is obtained on flowing the

CA 02201111 1997-03-26
WC)9 56 PCrlAT95/~1~7
- 31 -
gas 2 over a larger area. By arranging the heat exchangers 214 to 216 in the individual zones
behind one another in the direction of flow, it is also achieved that there is an evenly increasing
cooling of the gas 2 in the refrigerating drier 5 between the suction point 34 and outlet 10, so
that on the inside of the refrigerating drier 5 between the individual zones no great differences
in temperature can occur.
The heat exchangers 214 to 216 can be controlled for example as in Fig. 7. It is of course possi-
ble that each of the other design variants of the previously described Figs. 1 to 11 can be used
to drive the heat exchangers 214 to 216. Furthermore, it is possible that parallel to the individ-
ual heat exchangers 214 to 216 additional heat exchangers 214 to 216 are arranged in the same
plane so that distributed over the cross sectional area of the refrigerating drier 5 several heat
exchangers 214 to 21~ are arranged in a plane vertical to the direction of flow or in several
planes behind one another in the direction of flow.
A further advantage of this illustrated design variant is that by the arrangement of the interme-
diate zone 213 the intermediate region between the cooling zone 110 and the climatic zone 109
can be used as an additional cooling stage, so that now there are three different zones with dif-
ferent temperatures in the refrigerating drier 5. Of course, it is also possible that further
individual zones are arranged in the refrigerating drier 5 so that a finer adjustment of tempera-
ture from the climatic zone 109 to cooling zone 11() is achieved.
The control of the intermediate zone 213 corresponds to the drive of the cooling zone 110, as
described in Fig. 7, whereby the same reference numbers are used for the intermediate zone
213, as used in Fig. 7. Furthermore, it should be mentioned that the individual heat exchangers
214 to 216 can be controlled separately.
For forms sake it should be noted that individual parts of the previously described installations
or devices can also form the subject matter of independent solutions according to the invention
in any combination.

CA 02201111 1997-03-26
W09 ~ 56 PCT/AT95~0187
- 32 -
List of Reference Numbers
1 device 41 check valve
2 gas 42 controlline
3 arrow 43 controlline
4 compressor 44 control line
5 refrigerating drier 45 control line
6 refrigeratingdrier 46 controlline
7 suction line 47 control line
8 suction line 48 solenoidvalve
9 suction line 49 solenoidvalve
10 outlet 50 pressure serlsor
11 outlet 51 pressure sensor
12 sealing flap 52 pressure line
13 sealing flap 53 pressure line
14 drive 54 temperature sensor
15 heat exchanger 55 temperature sensor
16 heat exchanger 56 heat exchanger
17 connection line 57 suction line
18 connection line 58 motor
19 suction line S9 condenser
20 suction line 60 cooling water circuit
21 solenoid valve 61 line
22 suction line 62 Ihle
23 refrigerant compressor 63 input
24 controldevice 64 liquidconverter
25 pressure line 65 output
26 pressure line 66 pressure line
27 expansion valve 67 sight glass
28 expansion valve 68 refrigerant
29 bypass line 69 hot gas regulator
30 bypassline 70 line
31 solenoid valve 71 pressure sensor
32 solenoid valve 72 pressureline
33 sealing flap 73 bypass line
34 suction point 74 drive
35 connection line 75 drive
36 outflow 76 control line
37 sealing flap 77 control line
38 return line 78 control line
39 return line 79 supply line
40 check valve 80 supply line

CA 02201111 1997-03-26
WO 156 ~CT/AT95/~)187
81 current source 121 pressure line
82 drive 122 pressure line
83 control line 123 pressure line
84 control line 124 pressure line
585 bypass line 125 expansion valve
86 excess and low pressure control valve 126 expansion valve
87 characteristic curve 127 expansion valve
88 characteristic curve 128 expansion valve
1089 time point 129 expansion valve
90 time point 130 expansion valve
91 time point 131 expansion valve
92 time point 132 suction lhle
1593 time point 133 suction line
94 temperature sensor 134 suction line
95 heat exchanger 135 suction line
96 heat exchanger 136 suction line
2097 connection line 137 suction line
98 connection line 138 suction line
99 expansion valve 139 solenoid valve
100 expansion valve 140 solenoid valve
25101 solenoid valve 141 solenoid valve
102 solenoid valve 142 solenoid valve
103 suctlon line 143 solenoid valve
104 suction line 144 solenoid valve
105 control line 145 solenoid valve
106 control line 146 bypass line
107 control line 147 bypass line
108 control line 148 bypass line
109 climatic zone 149 bypass line
110 cooling zone 150 bypass line
111 heat exchanger 151 bypass line
112 heat exchanger 152 bypass line
113 heat exchanger 153 solenoid valve
114 heat exchanger 154 solenoid valve
115 heat exchanger 155 solenoid valve
116 heatexchanger 156 solenoid valve
117 heat exchanger 157 solenoid valve
45118 pressure line 158 solenoid valve
119 pressure line 159 solenoid valve
120 pressure line 160 return line

CA 02201111 1997-03-26
WO' ~ 156 - - - PCT/AT95/~187
- 34 -
161 return line 201 user
162 return line 202 blow guns
163 return line 203 central control unit
164 return line 204 bus system
165 return line 205 control element
166 return line 206 compressed air
167 return line 207 suction device
168 return line 208 opening
169 return line 209 opening
170 return line 210 particle filter
171 return line 211 sealing flap
172 return line 212 sealing flap
173 return line 213 intermediate zone
174 check valve 214 heat exchanger
175 check valve 215 heat exchanger
176 check valve 216 heat exchanger
177 check valve
178 check valve
179 check valve
180 check valve
181 refrigerant line
182 refrigerant line
183 refrigerant line
184 refrigerant line
185 refrigerant line
186 refrigerant line
187 refrigerant line
188 Venturi valve
189 Venturi valve
190 pressure gauge device
191 pressure gauge device
192 snifter line
193 snifter line
194 compressed air arrallgement
195 device
196 device
197 device
198 collective line
199 compressed air tank
200 hose

Representative Drawing

Sorry, the representative drawing for patent document number 2201111 was not found.

Administrative Status

2024-08-01:As part of the Next Generation Patents (NGP) transition, the Canadian Patents Database (CPD) now contains a more detailed Event History, which replicates the Event Log of our new back-office solution.

Please note that "Inactive:" events refers to events no longer in use in our new back-office solution.

For a clearer understanding of the status of the application/patent presented on this page, the site Disclaimer , as well as the definitions for Patent , Event History , Maintenance Fee  and Payment History  should be consulted.

Event History

Description Date
Time Limit for Reversal Expired 2002-09-27
Application Not Reinstated by Deadline 2002-09-27
Deemed Abandoned - Failure to Respond to Maintenance Fee Notice 2001-09-27
Inactive: IPC assigned 1997-06-26
Inactive: IPC assigned 1997-06-26
Inactive: IPC assigned 1997-06-26
Inactive: First IPC assigned 1997-06-26
Inactive: Notice - National entry - No RFE 1997-06-12
Application Published (Open to Public Inspection) 1996-04-04

Abandonment History

Abandonment Date Reason Reinstatement Date
2001-09-27

Maintenance Fee

The last payment was received on 2000-06-15

Note : If the full payment has not been received on or before the date indicated, a further fee may be required which may be one of the following

  • the reinstatement fee;
  • the late payment fee; or
  • additional fee to reverse deemed expiry.

Patent fees are adjusted on the 1st of January every year. The amounts above are the current amounts if received by December 31 of the current year.
Please refer to the CIPO Patent Fees web page to see all current fee amounts.

Fee History

Fee Type Anniversary Year Due Date Paid Date
MF (application, 2nd anniv.) - small 02 1997-09-29 1997-03-26
Basic national fee - small 1997-03-26
MF (application, 3rd anniv.) - small 03 1998-09-28 1998-08-04
MF (application, 4th anniv.) - small 04 1999-09-27 1999-06-14
MF (application, 5th anniv.) - small 05 2000-09-27 2000-06-15
Owners on Record

Note: Records showing the ownership history in alphabetical order.

Current Owners on Record
EWALD GOSSLER
Past Owners on Record
None
Past Owners that do not appear in the "Owners on Record" listing will appear in other documentation within the application.
Documents

To view selected files, please enter reCAPTCHA code :



To view images, click a link in the Document Description column. To download the documents, select one or more checkboxes in the first column and then click the "Download Selected in PDF format (Zip Archive)" or the "Download Selected as Single PDF" button.

List of published and non-published patent-specific documents on the CPD .

If you have any difficulty accessing content, you can call the Client Service Centre at 1-866-997-1936 or send them an e-mail at CIPO Client Service Centre.


Document
Description 
Date
(yyyy-mm-dd) 
Number of pages   Size of Image (KB) 
Description 1997-03-25 34 2,083
Abstract 1997-03-25 1 31
Claims 1997-03-25 5 287
Drawings 1997-03-25 12 353
Notice of National Entry 1997-06-11 1 202
Courtesy - Abandonment Letter (Maintenance Fee) 2001-10-24 1 183
Reminder - Request for Examination 2002-05-27 1 118
International preliminary examination report 1997-03-25 29 1,167
PCT 1997-03-25 5 195
PCT 1997-08-13 8 228
Fees 2000-06-14 1 38
Fees 1998-08-03 1 46
Fees 1999-06-13 1 40