Some of the information on this Web page has been provided by external sources. The Government of Canada is not responsible for the accuracy, reliability or currency of the information supplied by external sources. Users wishing to rely upon this information should consult directly with the source of the information. Content provided by external sources is not subject to official languages, privacy and accessibility requirements.

Claims and Abstract availability

Any discrepancies in the text and image of the Claims and Abstract are due to differing posting times. Text of the Claims and Abstract are posted:

  • At the time the application is open to public inspection;
  • At the time of issue of the patent (grant).
(12) Patent: (11) CA 2571632
(54) English Title: MECHANIZED UNIT FOR PROTECTIVELY ENCASING A UTILITY IN A TRENCH WITH PROCESSED EXCAVATED TRENCH MATERIAL
(54) French Title: UNITE MECANISEE POUR REVETEMENT PROTECTEUR DE DISPOSITIFS DE SERVICES PUBLICS DANS UNE TRANCHEE AVEC UN MATERIAU TRAITE DEGAGE DE LA TRANCHEE
Status: Expired and beyond the Period of Reversal
Bibliographic Data
(51) International Patent Classification (IPC):
  • E2F 5/10 (2006.01)
  • E2F 5/12 (2006.01)
  • E2F 7/06 (2006.01)
(72) Inventors :
  • LOPATA, MICHAEL E. (United States of America)
(73) Owners :
  • PLC TRENCHING CO., LLC
(71) Applicants :
  • PLC TRENCHING CO., LLC (United States of America)
(74) Agent: ROBIC AGENCE PI S.E.C./ROBIC IP AGENCY LP
(74) Associate agent:
(45) Issued: 2014-04-29
(22) Filed Date: 2006-12-18
(41) Open to Public Inspection: 2007-06-30
Examination requested: 2009-12-23
Availability of licence: N/A
Dedicated to the Public: N/A
(25) Language of filing: English

Patent Cooperation Treaty (PCT): No

(30) Application Priority Data:
Application No. Country/Territory Date
11/323,141 (United States of America) 2005-12-30

Abstracts

English Abstract

A mechanized unit that is moved through a trench in the ground for the purpose of placing a length or lengths of a utility or utilities by a guide device on the bottom of the trench, and then encasing the placed utility or utilities. The unit has at least one plow to sweep the material excavated from the ground to form the trench back into the trench onto a screening member mounted to the movable unit. The screening unit has sections of progressively larger openings from front to rear. The screening member preferably is vibrated to deposit onto the one or more utilities layers of the excavated material having particles of progressively larger size from the bottom toward the top of the trench to protect the utility or utilities from physical damage caused by larger excavated particles.


French Abstract

Une unité mécanisée qui est déplacée dans une tranchée creusée dans le sol à des fins de positionnement d'une ou de plusieurs longueurs d'un dispositif de service public par un dispositif guide au bas de la tranchée puis en enveloppant le ou les dispositifs de service public placés. L'unité dispose d'au moins une charrue pour remblayer le fossé avec la matière excavée du sol pour former la tranchée après avoir passé la matière excavée dans un élément de filtrage installé sur l'unité mobile. L'unité de filtrage présente des sections d'ouvertures allant en s'agrandissant progressivement de l'avant vers l'arrière. L'élément de filtrage est préférablement mis en vibration pour déposer sur une ou plusieurs couches de dispositifs de service public la matière excavée ayant des particules de taille progressivement plus grosses du bas vers le haut de la tranchée pour protéger les dispositifs de service public des dommages physiques causés par les particules excavées qui sont plus grosses.

Claims

Note: Claims are shown in the official language in which they were submitted.


WHAT IS CLAIMED IS:
1. A movable unit for screening excavated material to protectively cover or
encase one or more utilities in an excavated trench, comprising:
a screening member mounted to the unit and located within the trench above
the one or more utilities in the trench, said screening member having a
plurality of
sections of openings of progressively increasing size relative to the front of
the unit;
a plow for sweeping excavated material lying along at least one side of the
trench onto said screening member, wherein the excavated material swept onto
said screening member passes through the sections of openings of progressively
increasing size to deposit layers of particles of the excavated material of
progressively increasing size onto the utility or utilities installed in the
trench as the
unit moves; and
a guide for placing a length of said one or more utilities into the trench
onto
which the screened material is deposited in the trench as the unit moves.
2. The movable unit as claimed in claim 1, wherein said screening member is
mounted to said movable unit with a downward slope in the trench away from the
direction of movement of the movable unit.
3. The movable unit as claimed in claim 1, further comprising a shaker unit
connected to said screening member to shake said screening member to
facilitate
passage of particles through the openings of said screen member.
4. The movable unit as claimed in claim 1, wherein said screening member
comprises a single layer having first and second sections of openings, with
said
openings of said second section being larger than the openings of said first
section,
whereby a first of said layers of particle, which is of smallest size
particles passing
through the openings of said first section are deposited on said one or more
utilities
in the trench, and a second of said layers of particles, which is of a size
larger than
8

the openings of said first section pass through the openings of said second
section
to deposit said second layer of particles on said first layer of particles,
and particles
larger than the openings of said second screen sliding off of the top surface
of said
screening member to form a third of said layers of particles.
5. The movable unit as claimed in claim 2, further comprising a pair of
vertical
side walls mounted to the unit and spaced apart by a distance generally
corresponding to space between walls of the trench.
6. The movable unit as claimed in claim 3, wherein said screening member
has
four sections of openings of different sizes.
7. The movable unit as claimed in claim 1, further comprising a vertical
plate
mounted on each side of said movable unit to support a wall of the trench to
prevent
material from falling onto said one or more utilities, which is or are
installed and
being covered by the layers of the particles.
8. The movable unit as claimed in claim 1, further comprising a means for
adjusting the height of said plow relative to the top of the trench.
9. The movable device of claim 1, further comprising means connected to an
end of the plow and a frame of the unit for stabilizing the plow.
9

Description

Note: Descriptions are shown in the official language in which they were submitted.


CA 02571632 2011-10-24
MECHANIZED UNIT FOR PROTECTIVELY ENCASING A UTILITY IN A TRENCH
WITH PROCESSED EXCAVATED TRENCH MATERIAL
BACKGROUND OF THE INVENTION
Mechanized units are known that are moved through a trench in the
ground for the purpose of laying a continuous length or connected lengths of a
utility or
utilities, such as conduits, pipes, cables, etc. or combinations thereof. The
mechanized
unit is primarily intended to place in the trench flexible utilities such as
electrical and
communication and data cables or rigid pipes for water, sewer, and/or gas, or
any
combination thereof, and then encase the one or more utilities with protective
material.
The mechanized unit may be propelled through the trench by being connected
directly
to the device that excavates the trench or by any other mechanical moving
device, such
as a tractor or other vehicle.
In one type of application, the flexible utility or utilities pass down
through the unit onto the bottom of the trench by means of a guide device that
maintains
a desired spatial relationship between utilities in applications in which more
than one
utility is laid in the trench. As the utility or utilities pass through and/or
exit the guide
device, protective material, which has been deposited in the upper portion of
the
mechanized unit, gravitates in a generally vertical direction through the
mechanized unit,
onto and around the utility or utilities being installed. This type of
installation has a
disadvantage in that the material to be used for the encasement must be
specially
obtained, usually by purchasing, from a suitable processing facility, such as
a
gravel/sand pit or stone quarry. Alternatively the encasement material must be
processed on site using portable screening equipment. The purchasing, hauling
and handling or processing and handling of this protective material can add
considerable time and costs to the installation.
U.S. patent 6,981,342, which is assigned to the assignee of the
subject application, describes a mechanized unit that overcomes the forgoing
1

CA 02571632 2011-10-24
disadvantages in an application that uses excavated trench material and that
protects the utility or utilities in a trench in a manner that is efficient
and cost
effective.
In accordance with the invention of the aforesaid patent, a mechanized
unit is provided that places a continuous length or connected lengths of a
utility or
utilities at a predetermined spatial relationship with each other near the
bottom of an
excavated trench. As the mechanized unit moves along the trench, it sweeps the
excavated material that has been placed along the one or both sides of the
trench back
into the trench onto a screening member. The screening member is constructed
with
vertically separate layers of screening material with the screen layers from
top to
bottom having progressively smaller openings. The screening member is mounted
to
the unit with a downward slope from the front to the back in the direction of
unit
movement. As the unit moves, layers of the excavated material of increasing
particle
size are deposited over the utility or utilities one layer above the other.
The layer of
smallest particles directly encase the utility or utilities rather than larger
size particles.
This protects the utility or utilities from stresses or direct physical damage
that would be
caused by large excavated soil or rock particles. The successive upper layer
or layers
further protect the utility. The mechanized unit of the invention accomplishes
this in
one continuous operation together with the laying of the one or more
utilities.
The mechanized unit of the patent is provided with vertical side walls
that hold back the sides of the trench. This prevents collapse of the trench
walls and
also prevents any material from falling into the trench which could damage the
utility or
utilities being installed prior to their encasement by the protective screened
material.
2

CA 02571632 2011-10-24
BRIEF DESCRIPTION OF THE INVENTION
According to the present invention, there is provided a movable unit for
screening excavated material to protectively cover or encase one or more
utilities in
an excavated trench, comprising:
a screening member mounted to the unit and located within the trench above
the one or more utilities in the trench, said screening member having a
plurality of
sections of openings of progressively increasing size relative to the front of
the unit;
a plow for sweeping excavated material lying along at least one side of the
trench onto said screening member, wherein the excavated material swept onto
said screening member passes through the sections of openings of progressively
increasing size to deposit layers of particles of the excavated material of
progressively increasing size onto the utility or utilities installed in the
trench as the
unit moves; and
a guide for placing a length of said one or more utilities into the trench
onto
which the screened material is deposited in the trench as the unit moves.
Preferably, in accordance with the invention, a mechanized unit of the
foregoing type is provided with a simplified screening member that is used to
deposit layers of the excavated material of increasing particle size onto the
one or
more utilities in an excavated trench. The screening member of the invention
has
only a single screen layer with sections of openings of different sizes. That
is, the
screening member extends in a downward sloping direction from the direction of
travel of the unit and the screening member has two or more sections of
openings.
The openings of each section are of substantially the same size and the
openings
of the respective sections progressively increase in size from the front
(higher) end
of the screening member to the rear (lower). Thus, as the excavated material
is
swept from the trench wall onto the screening member, the smaller size
particules
will pass through the smaller size openings first and form a layer that
encases the
3

CA 02571632 2013-02-28
,
one or more utilities, this being followed by a successive layer or layers of
fill
material particles of larger size one on top of the other that pass through
the large
size openings of the respective sections. In a preferred embodiment, a shaker
shakes the screening member.
According to the present invention, there is also provided a movable unit for
screening excavated material to protectively cover or encase one or more
utilities in
an excavated trench, comprising a screening member mounted to the movable unit
and having at least one screen with a plurality of openings sized to permit a
portion
of the excavated material to pass through the openings of the at least one
screen
and deposit onto the utility or utilities installed in the trench as the unit
moves, and a
guide for placing a length of at least one utility into the trench and onto
which the
screened material is deposited as the screening member advances with the
movable unit.
BRIEF DESCRIPTION OF THE DRAWINGS
Other objects and advantages of this invention will become more apparent
by referring to the following description of operation and referring to the
accompanying drawings, in which:
FIG.1 is a side elevational view in cross-section of the mechanized unit;
FIG.2 is a top view; and
FIG.3 is a orthographical view of the screening member.
DETAILED DESCRIPTION OF THE INVENTION
-
3a

CA 02571632 2006-12-18
Referring to the drawings, the mechanized unit 1 of the invention is
pulled (from right to left as shown in FIG. 1) through a trench 2 by a
conventional
trencher unit 3, illustratively of the wheel type, which excavates the trench.
Such
trencher units 3 dig a trench of predetermined depth and width as it moves
along the
ground. Any other suitable mechanism can be used to excavate the trench and
the
trench also can be hand dug. As the trencher 3 moves it deposits the material
7 that has
been excavated along one or both sides of the top 1 l of the trench 2.
The mechanized unit 1 has a frame to which is mounted a pair of vertical
side walls 30 formed by metal plates that are spaced apart by a distance
generally
corresponding to the space between the trench walls. As the mechanized unit 1
moves
forward, the utility or utilities 4 being installed pass down from a supply
source (not
shown) through the mechanized unit 1 and into the trench 2. The supply source
for the
one or more utilities 4 can be, for example, one or more reels of cable that
are carried by
the unit 1 or by a vehicle moving in parallel with unit 1 along the trench 2,
or pieces of
pipe that are laid down and are joined together. The one or more utilities 4
are
positioned near the bottom of the trench 2, by means of a guide device 6 which
can be
formed of a plurality of rollers or chutes, as appropriate. If more than one
utility is
being laid in the trench, the guide device 6 is preferably configured to
maintain a
desired spatial relationship between the one or more utilities. The unit side
walls 30
prevent the trench from collapsing and protect the utility or utilities as
they are laid in
the trench.
A plow 8 is mounted to each side of the frame of the mechanized unit I
at an angle, for example, about 45 . If the excavated material is placed on
only one side
of the trench, then only one plow is needed. The plows 8 are above the trench
top 11
and contact the excavated material 7 deposited along the one or both sides of
the top 11
of trench 2. As the mechanized unit is moved forward, the plows 8 sweep the
material
7 back into the trench 2 onto the top of a screening member 10, described
below,
mounted to the frame of the mechanized unit 1. As shown in FIG. 2, the ends of
the
plows 8 are stabilized by chains 8a or rigid struts connected to the frame of
the unit.
The height of plows 8 is raised and lowered, preferably by a hydraulic device
9, or by
4

CA 02571632 2006-12-18
any other mechanical means, for example a threaded screw arrangement, so that
the
appropriate amount of excavated material 7 is plowed back into the trench 2.
Referring to Fig. 3, the screening member 10 has a frame having an end
19 pivotally connected to the frame of mechanized unit 1 and extends below the
top 11
of the trench 2. The screening member 10 fits between the mechanized unit side
walls
30 and slopes in a downward direction away from the rear of the unit 1. The
screening
member 10 has one layer and a plurality of screen sections of different size,
or mesh
size. Each plurality of openings of a section is of substantially the same
size, but the
sizes of the openings progressively increase from section to section toward
the rear of
the screening member. As seen in Fig. 3, the screening member 10 single layer
illustratively has four sections 10a, 10b, 10c and 10d with progressively
larger openings
(mesh size) front to rear. That is, the openings of each of the sections is of
the same
size. The openings of section 10b are larger than those of section 10a, the
openings of
section 10c are larger than those of 10b, and the openings of section 10d are
larger than
those of section 10c. While four sections 10a-10d are shown, there can be
fewer, but at
least two, or more than four.
As the mechanized unit 1 moves forward in the trench the smaller
particles that pass through the smaller openings of the section 10a openings
toward the
front of the screening member 10 gravitate to encase and cover the utility or
utilities 4 at
the bottom of the trench 2 prior to the larger particles passing through the
larger
openings of sections 10b, 10c and 10d toward the rear of the screening member
10
gravitating onto the smaller particles previously deposited. Particles that
are larger than
the openings of all of the sections slide off the lower end of the screening
member into
the trench to form the top layer of the encasement. This covers the utility or
utilities 4
with protective material from bottom to top with particle sizes that are
progressively
smaller to larger. While the screening member 10 is shown with four sections
of
openings of different sizes, there can be two or more.
In a typical embodiment, the screening member 10 has a downward
slope of about 18 , a width of 12 inches, and a length of 8 feet. The openings
of section
10a are 3/8", those of section 10d are 1", and those of sections 10b and 10c
of

CA 02571632 2006-12-18
increasing size from between 3/8" to 1". All of the foregoing dimensions are
by way of
illustration only and can be varied to suit a particular application.
A shaker 14 formed by a hydraulic motor 15 or any other mechanical
means is mounted to the unit 1 framework. The motor 15 turns a crankshaft 16
that is
connected to the screening member 10 frame by a connecting rod 17. The shaker
14 is
operated at a desired rate and preferably has a movement that moves the
screening
member 10 by a desired distance forward and back and up-and-down. Any suitable
conventional type of shaking or vibrating device can be utilized.
As the excavated material passes vertically through the openings of
sections 10a, 10b, 10c and 10d of the screening member 10, it is separated by
particle
size. In the embodiment shown, as the mechanized unit 1 moves forward, the
screening
member causes four layers of encasing material of progressively larger
particle size to
be laid over the one or more utilities 4. The first layer is the smallest
particle size
material 18 that passes through the openings of the screening member section
10a. The
smallest size particles pass through the first screen section 10a to directly
contact and
cover the utility or utilities 4 that have been placed near the bottom of the
trench 2. If
the one or more utilities are slightly raised from the trench floor, the
smaller size
particles will flow below them and form a bed. The second, third and fourth
layers are
the particles of material that have passed through the progressively larger
openings of
the successive sections 10b, 10c and 10d.
The large particles that do not pass through any of the openings of
sections 10a-10d gravitate down along the upper surface of the screen and are
shaken
down and to the rear of that screen until they fall off of the back end of the
screen and
gravitate onto the already deposited layers of material. Even though the size
of these
largest particles falling off the end of the screen may be relatively large,
they do not
damage the one or more utilities laid in the trench since these are already
covered by
four layers of material of smaller particle size. Also, the force of the large
particles
sliding off the screen is relatively small as compared to a direct vertical
drop of such
large size particles. Accordingly, as seen, the screening member 10 functions
to cover
6

CA 02571632 2011-10-24
the utility or utilities with layers of protective materials of successively
increasing
particle size.
While the illustrative embodiment of screening member 10 has only one
layer, five layers of particles will be provided, these being the layer of
particles from
each of the four screening sections 10a, 10b, 10c and 10d, and the particles
that fall off
the end of the screen.
A guide device 20 preferably is attached at the rear of the mechanized
unit 1 to place a warning ribbon 21 in the trench above the installed utility
or utilities.
The roll of warning ribbon 22 is supported by a warning ribbon roll support 23
attached
to the unit 1 framework.
Specific features of the invention are shown in one or more of the
drawings for convenience only, as each feature may be combined with other
features in
accordance with the invention.
7

Representative Drawing
A single figure which represents the drawing illustrating the invention.
Administrative Status

2024-08-01:As part of the Next Generation Patents (NGP) transition, the Canadian Patents Database (CPD) now contains a more detailed Event History, which replicates the Event Log of our new back-office solution.

Please note that "Inactive:" events refers to events no longer in use in our new back-office solution.

For a clearer understanding of the status of the application/patent presented on this page, the site Disclaimer , as well as the definitions for Patent , Event History , Maintenance Fee  and Payment History  should be consulted.

Event History

Description Date
Time Limit for Reversal Expired 2024-07-31
Letter Sent 2023-12-18
Letter Sent 2023-06-19
Letter Sent 2022-12-19
Common Representative Appointed 2019-10-30
Common Representative Appointed 2019-10-30
Change of Address or Method of Correspondence Request Received 2018-12-04
Grant by Issuance 2014-04-29
Inactive: Cover page published 2014-04-28
Inactive: Delete abandonment 2014-02-19
Inactive: Office letter 2014-02-19
Deemed Abandoned - Failure to Respond to Maintenance Fee Notice 2013-12-18
Amendment After Allowance Requirements Determined Compliant 2013-12-13
Letter Sent 2013-12-13
Notice of Allowance is Issued 2013-12-13
Inactive: QS passed 2013-12-11
Inactive: Approved for allowance (AFA) 2013-12-11
Amendment Received - Voluntary Amendment 2013-10-01
Inactive: S.30(2) Rules - Examiner requisition 2013-07-10
Letter Sent 2013-03-12
Inactive: Final fee received 2013-02-28
Reinstatement Request Received 2013-02-28
Amendment Received - Voluntary Amendment 2013-02-28
Final Fee Paid and Application Reinstated 2013-02-28
Withdraw from Allowance 2013-02-28
Pre-grant 2013-02-28
Deemed Abandoned - Conditions for Grant Determined Not Compliant 2012-06-12
4 2011-12-12
Letter Sent 2011-12-12
Notice of Allowance is Issued 2011-12-12
Notice of Allowance is Issued 2011-12-12
Inactive: Approved for allowance (AFA) 2011-12-01
Amendment Received - Voluntary Amendment 2011-10-24
Inactive: S.30(2) Rules - Examiner requisition 2011-05-16
Inactive: Correspondence - MF 2010-08-10
Amendment Received - Voluntary Amendment 2010-04-13
Letter Sent 2010-02-02
Amendment Received - Voluntary Amendment 2010-01-25
All Requirements for Examination Determined Compliant 2009-12-23
Request for Examination Requirements Determined Compliant 2009-12-23
Request for Examination Received 2009-12-23
Application Published (Open to Public Inspection) 2007-06-30
Inactive: Cover page published 2007-06-29
Inactive: IPC assigned 2007-03-27
Inactive: IPC assigned 2007-03-27
Inactive: First IPC assigned 2007-03-27
Inactive: IPC assigned 2007-03-27
Letter Sent 2007-01-24
Application Received - Regular National 2007-01-24
Inactive: Filing certificate - No RFE (English) 2007-01-24

Abandonment History

Abandonment Date Reason Reinstatement Date
2013-12-18
2013-02-28
2012-06-12

Maintenance Fee

The last payment was received on 2013-12-10

Note : If the full payment has not been received on or before the date indicated, a further fee may be required which may be one of the following

  • the reinstatement fee;
  • the late payment fee; or
  • additional fee to reverse deemed expiry.

Patent fees are adjusted on the 1st of January every year. The amounts above are the current amounts if received by December 31 of the current year.
Please refer to the CIPO Patent Fees web page to see all current fee amounts.

Owners on Record

Note: Records showing the ownership history in alphabetical order.

Current Owners on Record
PLC TRENCHING CO., LLC
Past Owners on Record
MICHAEL E. LOPATA
Past Owners that do not appear in the "Owners on Record" listing will appear in other documentation within the application.
Documents

To view selected files, please enter reCAPTCHA code :



To view images, click a link in the Document Description column (Temporarily unavailable). To download the documents, select one or more checkboxes in the first column and then click the "Download Selected in PDF format (Zip Archive)" or the "Download Selected as Single PDF" button.

List of published and non-published patent-specific documents on the CPD .

If you have any difficulty accessing content, you can call the Client Service Centre at 1-866-997-1936 or send them an e-mail at CIPO Client Service Centre.


Document
Description 
Date
(yyyy-mm-dd) 
Number of pages   Size of Image (KB) 
Claims 2013-09-30 2 74
Abstract 2006-12-17 1 17
Claims 2006-12-17 2 66
Drawings 2006-12-17 2 31
Representative drawing 2007-06-04 1 15
Cover Page 2007-06-26 1 48
Description 2006-12-17 7 308
Description 2010-04-12 8 331
Description 2011-10-23 8 321
Claims 2011-10-23 2 73
Claims 2013-02-27 5 159
Description 2013-02-27 8 338
Representative drawing 2014-03-30 1 15
Cover Page 2014-03-30 1 49
Courtesy - Certificate of registration (related document(s)) 2007-01-23 1 127
Filing Certificate (English) 2007-01-23 1 167
Reminder of maintenance fee due 2008-08-18 1 112
Acknowledgement of Request for Examination 2010-02-01 1 177
Commissioner's Notice - Application Found Allowable 2011-12-11 1 163
Courtesy - Abandonment Letter (NOA) 2012-09-03 1 163
Notice of Reinstatement 2013-03-11 1 170
Commissioner's Notice - Maintenance Fee for a Patent Not Paid 2023-01-29 1 541
Courtesy - Patent Term Deemed Expired 2023-07-30 1 536
Commissioner's Notice - Maintenance Fee for a Patent Not Paid 2024-01-28 1 541
Correspondence 2010-08-09 1 45
Correspondence 2011-12-11 1 80
Correspondence 2013-02-27 4 120
Correspondence 2013-12-12 1 36
Correspondence 2014-02-18 1 15