Language selection

Search

Patent 2769948 Summary

Third-party information liability

Some of the information on this Web page has been provided by external sources. The Government of Canada is not responsible for the accuracy, reliability or currency of the information supplied by external sources. Users wishing to rely upon this information should consult directly with the source of the information. Content provided by external sources is not subject to official languages, privacy and accessibility requirements.

Claims and Abstract availability

Any discrepancies in the text and image of the Claims and Abstract are due to differing posting times. Text of the Claims and Abstract are posted:

  • At the time the application is open to public inspection;
  • At the time of issue of the patent (grant).
(12) Patent: (11) CA 2769948
(54) English Title: CONTROL APPARATUS FOR CONVEYOR OF PARTICULATE MATERIAL
(54) French Title: APPAREIL DE COMMANDE POUR UN CONVOYEUR DE MATERIAU PARTICULAIRE
Status: Granted and Issued
Bibliographic Data
(51) International Patent Classification (IPC):
  • B65G 43/00 (2006.01)
  • B60P 3/30 (2006.01)
  • B65G 15/00 (2006.01)
  • B65G 21/20 (2006.01)
  • E01C 19/20 (2006.01)
(72) Inventors :
  • MAGUIRE, DENNIS R. (Canada)
(73) Owners :
  • MAGUIRE SUPER-SHIELD LTD.
(71) Applicants :
  • MAGUIRE SUPER-SHIELD LTD. (Canada)
(74) Agent: SISKINDS LLP
(74) Associate agent:
(45) Issued: 2016-10-04
(22) Filed Date: 2012-03-02
(41) Open to Public Inspection: 2013-09-02
Examination requested: 2014-07-18
Availability of licence: N/A
Dedicated to the Public: N/A
(25) Language of filing: English

Patent Cooperation Treaty (PCT): No

(30) Application Priority Data: None

Abstracts

English Abstract

A mount for operationally positioning a shield assembly above a conveyor belt assembly. The mount comprises a pair of spaced apart brackets attached on each side of the conveyor frame, and a pair of linkages pivotally connecting the brackets to the shield assembly.


French Abstract

Un montage pour positionner de manière fonctionnelle un ensemble de protection au-dessus dun convoyeur à bande transporteuse. Le montage comprend une paire de supports espacés attachés de chaque côté du cadre du convoyeur, et une paire de liaisons reliant de manière pivotante les supports à lensemble de protection.

Claims

Note: Claims are shown in the official language in which they were submitted.


7
Claims
1. A mount for operationally positioning a shield assembly having a first
conveyor belt above a conveyor belt assembly having a second conveyor belt,
the
conveyor assembly having a frame, the shield assembly having opposing side
frame elements, the mount comprising:
a pair of spaced apart brackets fixedly attached on each side of the frame of
the conveyor; and
a pair of linkages having opposing ends, each linkage connecting one of the
spaced apart brackets to one of the opposing side frame elements, wherein
one opposing end of each linkage is pivotally attached to one of the spaced
apart brackets, and
the other opposing end of each linkage is pivotally attached to one of the
opposing side frame elements of the shield,
wherein the shield assembly comprises at least one axle mounted between
the opposing side frame elements having wheels for supporting the first
conveyor
belt, wherein the axle is attached to the opposing side frame elements by
bearing
assemblies located on the outside of the opposing side frame elements.
2. The mount of claim 1, wherein the spaced apart brackets are horizontally
aligned with respect to the frame of the conveyor.

8
3. The mount of claim 1, wherein the pair of linkages are pivotally
attached to
the spaced apart brackets and the opposing side frame elements by bearings
assemblies.
4. The mount of claim 1, wherein the mount further comprises a connecting
rod
extending between the opposing side frame elements of the shield.
5. The mount of claim 4, wherein the connecting rod further comprises
multiple
rod segments releasably secured together.

Description

Note: Descriptions are shown in the official language in which they were submitted.


CA 02769948 2012-03-02
CONTROL APPARATUS FOR CONVEYOR OF PARTICULATE MATERIAL
Field of the Invention
The present invention relates to a mount for a device which attaches to a
conveyor belt to control the conveyance of particulate matter along the belt.
Background of the Invention
Conveyors for moving or projecting particulate material such as stone, sand
or gravel can be found in various applications. One particular application
where
conveyors are used to move particulate material is a vehicle known as a stone
spreader. Stone spreaders are used to project particulate material to a
desired
location remote from the vehicle determined by the orientation and speed of
the
conveyor.
A shield assembly for a stone spreader facilitates the control of the
particulate material at various conveyor belt speeds or for high elevation
applications. The shield assembly enables the particulate material to be
thrown a
distance beyond the end of the conveyor which is dependant on the speed of the
conveyor and the control offered by the use of the shield assembly. The shield
assembly can increase the throwing distance of particular material to over
four
times over the traditional conveyor.

CA 02769948 2012-03-02
2
There are many different manufactures of stone spreader vehicles and thus
accordingly a need exists for an improved mounting system that also offers a
universal or standard way of operationally mounting a shield over the conveyor
belt.
Summary of the Invention
This invention relates to an improved mounting system for a shield used in
associate with conveyor belts on stone spreader vehicles. A mount for
operationally
positioning a shield assembly above a conveyor belt assembly, the conveyor
having
a frame, the shield having opposing side frame elements is provided. The mount
comprises a pair of spaced apart brackets fixedly attached on each side of the
conveyor frame, and a pair of linkages having opposing ends, each linkage
connecting one of the brackets to one side of the frame elements, wherein one
opposing end of each linkage is pivotally attached to one of the mounting
brackets,
and the other opposing end of each linkage is pivotally attached to one of the
side
frame elements of the shield.
Brief Description of the Drawings
These and other features of the preferred embodiments of the invention will
become more apparent in the following detailed description in which reference
is
made to the appended drawings wherein:
FIG. 1 is a partial side view of a shield assembly mounted in position above
a conveyor belt assembly;

CA 02769948 2012-03-02
3
FIG. 2 is an enlarged partial view of Figure 1 showing the mount in
accordance with the present invention;
FIG. 3 is a sectional assembly view of the mount according to the present
invention;
Description of the Preferred Embodiments
Referring to Figure 1, a side view of conveyor belt assembly 13 is shown in
vertical spaced apart relationship to a shield assembly 11 mounted above the
conveyor belt 12 according to the present invention. The conveyor belt 12
receives
particulate matter from the stone spreader vehicle for conveyance to a
designated
job location and is pivotally attached to the stone spreader by means of frame
50.
The stone spreader includes a drive means (not shown) to power the conveyor
belt
12 so as to move particulate material (not shown) deposited onto the conveyor
belt
12 from the stone spreader bed or from a hopper. Material may be deposited
onto
the conveyor belt 12 directly from the truck bed or an additional conveyor may
operate between the truck bed and the conveyor belt 12 to transfer the
material.
The conveyor belt 12 may be either smooth or ribbed.
The shield assembly 11 is comprised of a powered or unpowered endless
belt 16 having a length and width. The endless belt 16 is mounted on wheels 22
or
axles 24 attached between two longitudinal frame elements 20 one of which is
shown. The frame elements 20 are provided with holes for receiving the ends of
the axles 24. The axles 24 are rotatably secured within sealed bearing
assemblies

CA 02769948 2012-03-02
4
33 mounted on the outside of the frame elements 20. The externally mounted
sealed bearing assemblies 33 allow for the application of grease without
disassembly of the shield assembly 11.
In a preferred embodiment, the shield assembly 11 includes a plurality of
pairs of wheels 22 or axles 24 positioned along the length of the frame
element 20
at suitable intervals so as to provide adequate support therefor. The number
of
wheels 22 and axles 24 between the ends of the belt 16 will vary depending on
the
size of the endless belt 16.
In an embodiment of the present invention, the motion of the conveyor belt
12 drives the endless belt 16 as a result of the frictional engagement between
the
belts 12 and 16. The frictional engagement may result from direct contact
between
the belts 12 and 16 or indirect contact, where the particulate material that
is passing
between the belts 12 and 16 transfers the motion from the conveyor belt 12 to
the
endless belt 16. In an alternative embodiment of the present invention a
hydraulic
motor is used to power the belt 16 independent of any frictional engagement
between belts 16 and 12. The hydraulic motor (not shown) is installed on the
frame
elements 20 and drives a sprocket wheel which is operatively engaged with the
underside of the endless belt 16.
The shield assembly 11 is operationally mounted above the conveyor belt
12 between a pair of mounts one of which is shown in Figures 2 and 3. Each
mount comprises two mounting brackets 31 attached to the frame 50. The
mounting brackets 31 support the shield assembly 11 therebetween by means of

CA 02769948 2012-03-02
linkages 30 pivotally attached to the mounting brackets 31 and frame elements
20
by means of bearing assemblies 33. The brackets 31 have hole attachment
means to accommodate for the attachment to the frame 50 and the pivoting
linkages 30 as described. The central portion 37 of the mounting brackets 31
may
5 be outwardly or inwardly bent as required to allow the top portion of the
bracket 31
and linkage assemblies to accommodate and clear the frame 50 of the conveyor
to
avoid interference with the conveyor belt 12 and the shield assembly 11.
Depending on the conveyor belt assembly 13 installed on a stone spreader
vehicle,
the height and width of the brackets 31 may be easily and selectively varied
so that
the mount according to this invention is in fact universal and suitable for
all stone
spreader applications.
A connecting rod 32 extends between the frame elements 20 to provide
stiffness and support. As shown in Figure 3, the connecting rod 32 may consist
of
four rod segments 35 extending between the second ends of the pivoting
linkages
30 releasably secured together by two bolted connections 36. The bolted
connections 36 allow for the disassembly of the connecting rod 32 for bearing
replacement.
The mount assembly controls vertical movement of the shield assembly 11
and allows for up and down vertical movement of the shield assembly 11 when
particulate material passes between the belts 12 and 16. The maximum vertical
deflection of the shield assembly 11 is limited by the vertical range of the
pivoting
linkage. The mount also allows for front to back tilting and raising as
required. The

CA 02769948 2012-03-02
6
mount prevents side-to-side rocking of the shield assembly 11 by enabling that
the
vertical deflection of the shield assembly 11 to be equal across the width of
belt 16.
It will be apparent to those skilled in the art that the apparatus of the
invention can be utilized with any conveyor and with a variety of material.
For
example, particulate material may include sand, gravel, salt, rock etc. The
conveyor
assembly may be associated with trucks (as described above) or with mining,
equipment, farming equipment etc.
Although the invention has been described with reference to certain specific
embodiments, various modifications thereof will be apparent to those skilled
in the
art without departing from the spirit and scope of the invention as outlined
in the
claims appended hereto.

Representative Drawing
A single figure which represents the drawing illustrating the invention.
Administrative Status

2024-08-01:As part of the Next Generation Patents (NGP) transition, the Canadian Patents Database (CPD) now contains a more detailed Event History, which replicates the Event Log of our new back-office solution.

Please note that "Inactive:" events refers to events no longer in use in our new back-office solution.

For a clearer understanding of the status of the application/patent presented on this page, the site Disclaimer , as well as the definitions for Patent , Event History , Maintenance Fee  and Payment History  should be consulted.

Event History

Description Date
Common Representative Appointed 2019-10-30
Common Representative Appointed 2019-10-30
Revocation of Agent Requirements Determined Compliant 2019-03-04
Appointment of Agent Requirements Determined Compliant 2019-03-04
Appointment of Agent Request 2019-01-31
Revocation of Agent Request 2019-01-31
Grant by Issuance 2016-10-04
Inactive: Cover page published 2016-10-03
Pre-grant 2016-08-18
Inactive: Final fee received 2016-08-18
Notice of Allowance is Issued 2016-08-10
Letter Sent 2016-08-10
Notice of Allowance is Issued 2016-08-10
Inactive: Q2 passed 2016-08-05
Inactive: Approved for allowance (AFA) 2016-08-05
Amendment Received - Voluntary Amendment 2016-04-14
Inactive: S.30(2) Rules - Examiner requisition 2015-10-15
Inactive: Report - No QC 2015-07-31
Letter Sent 2014-07-25
Request for Examination Requirements Determined Compliant 2014-07-18
All Requirements for Examination Determined Compliant 2014-07-18
Request for Examination Received 2014-07-18
Inactive: Cover page published 2013-09-06
Application Published (Open to Public Inspection) 2013-09-02
Inactive: IPC assigned 2012-04-18
Inactive: IPC assigned 2012-04-18
Inactive: First IPC assigned 2012-04-18
Inactive: IPC assigned 2012-04-18
Inactive: IPC assigned 2012-04-18
Inactive: IPC assigned 2012-04-18
Application Received - Regular National 2012-03-14
Filing Requirements Determined Compliant 2012-03-14
Inactive: Filing certificate - No RFE (English) 2012-03-14
Small Entity Declaration Determined Compliant 2012-03-02

Abandonment History

There is no abandonment history.

Maintenance Fee

The last payment was received on 2016-02-25

Note : If the full payment has not been received on or before the date indicated, a further fee may be required which may be one of the following

  • the reinstatement fee;
  • the late payment fee; or
  • additional fee to reverse deemed expiry.

Please refer to the CIPO Patent Fees web page to see all current fee amounts.

Fee History

Fee Type Anniversary Year Due Date Paid Date
Application fee - small 2012-03-02
MF (application, 2nd anniv.) - small 02 2014-03-03 2014-02-10
Request for examination - small 2014-07-18
MF (application, 3rd anniv.) - small 03 2015-03-02 2015-02-20
MF (application, 4th anniv.) - small 04 2016-03-02 2016-02-25
Final fee - small 2016-08-18
MF (patent, 5th anniv.) - small 2017-03-02 2017-02-27
MF (patent, 6th anniv.) - small 2018-03-02 2018-02-26
MF (patent, 7th anniv.) - small 2019-03-04 2019-02-25
MF (patent, 8th anniv.) - small 2020-03-02 2020-02-10
MF (patent, 9th anniv.) - small 2021-03-02 2021-02-24
MF (patent, 10th anniv.) - small 2022-03-02 2022-02-10
MF (patent, 11th anniv.) - small 2023-03-02 2023-02-08
MF (patent, 12th anniv.) - small 2024-03-04 2024-02-09
Owners on Record

Note: Records showing the ownership history in alphabetical order.

Current Owners on Record
MAGUIRE SUPER-SHIELD LTD.
Past Owners on Record
DENNIS R. MAGUIRE
Past Owners that do not appear in the "Owners on Record" listing will appear in other documentation within the application.
Documents

To view selected files, please enter reCAPTCHA code :



To view images, click a link in the Document Description column. To download the documents, select one or more checkboxes in the first column and then click the "Download Selected in PDF format (Zip Archive)" or the "Download Selected as Single PDF" button.

List of published and non-published patent-specific documents on the CPD .

If you have any difficulty accessing content, you can call the Client Service Centre at 1-866-997-1936 or send them an e-mail at CIPO Client Service Centre.


Document
Description 
Date
(yyyy-mm-dd) 
Number of pages   Size of Image (KB) 
Description 2012-03-02 6 187
Abstract 2012-03-02 1 8
Claims 2012-03-02 2 34
Drawings 2012-03-02 3 45
Representative drawing 2013-08-06 1 9
Cover Page 2013-09-06 1 33
Claims 2016-04-14 2 38
Cover Page 2016-09-01 1 33
Maintenance fee payment 2024-02-09 1 25
Filing Certificate (English) 2012-03-14 1 156
Reminder of maintenance fee due 2013-11-05 1 111
Acknowledgement of Request for Examination 2014-07-25 1 176
Commissioner's Notice - Application Found Allowable 2016-08-10 1 163
Fees 2015-02-20 1 25
Examiner Requisition 2015-10-15 4 242
Fees 2016-02-25 1 25
Amendment / response to report 2016-04-14 8 184
Final fee 2016-08-18 1 39
Maintenance fee payment 2017-02-27 1 25
Maintenance fee payment 2019-02-25 1 25
Maintenance fee payment 2020-02-10 1 25
Maintenance fee payment 2021-02-24 1 25
Maintenance fee payment 2022-02-10 1 25
Maintenance fee payment 2023-02-08 1 25