Some of the information on this Web page has been provided by external sources. The Government of Canada is not responsible for the accuracy, reliability or currency of the information supplied by external sources. Users wishing to rely upon this information should consult directly with the source of the information. Content provided by external sources is not subject to official languages, privacy and accessibility requirements.
Any discrepancies in the text and image of the Claims and Abstract are due to differing posting times. Text of the Claims and Abstract are posted:
(12) Patent: | (11) CA 2838686 |
---|---|
(54) English Title: | PROCEDE DE DIFFUSION D'UN ETAGE DE COMPRESSION D'UNE TURBINE A GAZ ET ETAGE DE DIFFUSION DE MISE EN OEUVRE |
(54) French Title: | METHOD FOR DIFFUSING A GAS TURBINE COMPRESSION STAGE, AND DIFFUSION STAGE FOR IMPLEMENTING SAME |
Status: | Expired and beyond the Period of Reversal |
(51) International Patent Classification (IPC): |
|
---|---|
(72) Inventors : |
|
(73) Owners : |
|
(71) Applicants : |
|
(74) Agent: | LAVERY, DE BILLY, LLP |
(74) Associate agent: | |
(45) Issued: | 2019-09-17 |
(86) PCT Filing Date: | 2012-06-19 |
(87) Open to Public Inspection: | 2012-12-27 |
Examination requested: | 2017-05-18 |
Availability of licence: | N/A |
Dedicated to the Public: | N/A |
(25) Language of filing: | French |
Patent Cooperation Treaty (PCT): | Yes |
---|---|
(86) PCT Filing Number: | PCT/FR2012/051367 |
(87) International Publication Number: | WO 2012175855 |
(85) National Entry: | 2013-12-06 |
(30) Application Priority Data: | ||||||
---|---|---|---|---|---|---|
|
The aim of the invention is to produce an airflow by positioning flanges, the shapes of which are optimized. Non-axisymmetrical shapes in the direction of flow and in the tangential direction are thus provided. According to one embodiment, a radial or mixed gas turbine compressor diffusion stage comprises a wheel consisting of two flanges (9) between which the fluid centrifugally or inclinedly flows from the center towards the periphery. Vanes (60) of a grating are distributed among the flanges (9) in order to channel the flow of the fluid between the leading edges (6a) of said vanes (60) on the central side, and the trailing edges on the peripheral side. At least one of the flanges (9) has an inner surface (9i) comprising at least one area (Z1, Z2) having alternating concave (91) and convex (92) curvatures between two adjacent vanes (60), in at least one of two substantially perpendicular directions, namely in the direction of flow (F) along the vanes (60) and in an inter-vane tangential direction.
L'invention vise à réaliser un écoulement d'air par une mise en place de flasques optimisés en forme. Des formes non-axisymétriques dans le sens de l'écoulement et dans la direction tangentielle sont ainsi proposées. Selon une forme de réalisation, un étage de diffusion de compresseur radial ou mixte de turbine à gaz comporte une roue formée de deux flasques (9) entre lesquelles s'écoule le fluide de manière centrifuge ou inclinée à partir du centre vers la périphérie. Des aubes (60) d'une grille sont réparties entre les flasques (9) pour canaliser l'écoulement du fluide entre les bords d'attaque (6a) de ces aubes (60) du côté du centre et les bords de fuite du côté de la périphérie. Au moins l'un des flasques (9) présente une face interne (9i) comportant au moins une zone (Z1, Z2) à courbures alternées en creux (91) et en bosse (92) entre deux aubes adjacentes (60), dans au moins une parmi deux directions sensiblement perpendiculaires, à savoir dans le sens d'écoulement (F) le long des aubes (60) et dans une direction tangentielle inter-aubes.
Note: Claims are shown in the official language in which they were submitted.
Note: Descriptions are shown in the official language in which they were submitted.
2024-08-01:As part of the Next Generation Patents (NGP) transition, the Canadian Patents Database (CPD) now contains a more detailed Event History, which replicates the Event Log of our new back-office solution.
Please note that "Inactive:" events refers to events no longer in use in our new back-office solution.
For a clearer understanding of the status of the application/patent presented on this page, the site Disclaimer , as well as the definitions for Patent , Event History , Maintenance Fee and Payment History should be consulted.
Description | Date |
---|---|
Time Limit for Reversal Expired | 2023-12-20 |
Letter Sent | 2023-06-19 |
Letter Sent | 2022-12-20 |
Letter Sent | 2022-06-20 |
Common Representative Appointed | 2019-10-30 |
Common Representative Appointed | 2019-10-30 |
Grant by Issuance | 2019-09-17 |
Inactive: Cover page published | 2019-09-16 |
Pre-grant | 2019-07-25 |
Inactive: Final fee received | 2019-07-25 |
Notice of Allowance is Issued | 2019-02-25 |
Letter Sent | 2019-02-25 |
Notice of Allowance is Issued | 2019-02-25 |
Inactive: Q2 passed | 2019-02-07 |
Inactive: Approved for allowance (AFA) | 2019-02-07 |
Amendment Received - Voluntary Amendment | 2018-11-06 |
Inactive: Agents merged | 2018-09-01 |
Appointment of Agent Request | 2018-08-30 |
Inactive: Agents merged | 2018-08-30 |
Revocation of Agent Request | 2018-08-30 |
Inactive: S.30(2) Rules - Examiner requisition | 2018-05-11 |
Inactive: Report - No QC | 2018-05-06 |
Amendment Received - Voluntary Amendment | 2017-10-27 |
Letter Sent | 2017-05-29 |
Request for Examination Received | 2017-05-18 |
Request for Examination Requirements Determined Compliant | 2017-05-18 |
All Requirements for Examination Determined Compliant | 2017-05-18 |
Inactive: Cover page published | 2014-01-24 |
Inactive: First IPC assigned | 2014-01-16 |
Inactive: Notice - National entry - No RFE | 2014-01-16 |
Inactive: IPC assigned | 2014-01-16 |
Application Received - PCT | 2014-01-16 |
National Entry Requirements Determined Compliant | 2013-12-06 |
Application Published (Open to Public Inspection) | 2012-12-27 |
There is no abandonment history.
The last payment was received on 2019-05-27
Note : If the full payment has not been received on or before the date indicated, a further fee may be required which may be one of the following
Please refer to the CIPO Patent Fees web page to see all current fee amounts.
Fee Type | Anniversary Year | Due Date | Paid Date |
---|---|---|---|
Basic national fee - standard | 2013-12-06 | ||
MF (application, 2nd anniv.) - standard | 02 | 2014-06-19 | 2014-05-27 |
MF (application, 3rd anniv.) - standard | 03 | 2015-06-19 | 2015-05-28 |
MF (application, 4th anniv.) - standard | 04 | 2016-06-20 | 2016-06-01 |
Request for examination - standard | 2017-05-18 | ||
MF (application, 5th anniv.) - standard | 05 | 2017-06-19 | 2017-06-01 |
MF (application, 6th anniv.) - standard | 06 | 2018-06-19 | 2018-05-24 |
MF (application, 7th anniv.) - standard | 07 | 2019-06-19 | 2019-05-27 |
Final fee - standard | 2019-07-25 | ||
MF (patent, 8th anniv.) - standard | 2020-06-19 | 2020-05-25 | |
MF (patent, 9th anniv.) - standard | 2021-06-21 | 2021-05-19 |
Note: Records showing the ownership history in alphabetical order.
Current Owners on Record |
---|
TURBOMECA |
Past Owners on Record |
---|
JEROME PORODO |
LAURENT TARNOWSKI |
NICOLAS BULOT |