Some of the information on this Web page has been provided by external sources. The Government of Canada is not responsible for the accuracy, reliability or currency of the information supplied by external sources. Users wishing to rely upon this information should consult directly with the source of the information. Content provided by external sources is not subject to official languages, privacy and accessibility requirements.

Claims and Abstract availability

Any discrepancies in the text and image of the Claims and Abstract are due to differing posting times. Text of the Claims and Abstract are posted:

  • At the time the application is open to public inspection;
  • At the time of issue of the patent (grant).
(12) Patent: (11) CA 2842382
(54) English Title: FINISHED-PART TRACK FOR AN INCLINED CONVEYOR SYSTEM FOR MINING TRUCKS
(54) French Title: VOIE PREFABRIQUEE POUR UNE INSTALLATION DE TRANSPORT EN PLAN INCLINE DESTINEE A DES ENGINS MINIERS
Status: Expired and beyond the Period of Reversal
Bibliographic Data
(51) International Patent Classification (IPC):
  • E21F 13/04 (2006.01)
  • B61B 09/00 (2006.01)
  • B66B 09/06 (2006.01)
  • B66B 15/04 (2006.01)
(72) Inventors :
  • SETZ, HOLGER (Germany)
(73) Owners :
  • SIEMAG TECBERG GMBH
(71) Applicants :
  • SIEMAG TECBERG GMBH (Germany)
(74) Agent: SMART & BIGGAR LP
(74) Associate agent:
(45) Issued: 2015-12-01
(86) PCT Filing Date: 2012-07-19
(87) Open to Public Inspection: 2013-01-24
Examination requested: 2014-01-20
Availability of licence: N/A
Dedicated to the Public: N/A
(25) Language of filing: English

Patent Cooperation Treaty (PCT): Yes
(86) PCT Filing Number: PCT/EP2012/064165
(87) International Publication Number: EP2012064165
(85) National Entry: 2014-01-20

(30) Application Priority Data:
Application No. Country/Territory Date
10 2011 108 093.0 (Germany) 2011-07-19

Abstracts

English Abstract

The invention relates to a method for producing a finished-part track for an inclined conveyor system having a conveying platform and a counterweight in opencast mining, comprising the following steps: providing a foundation; placing at least one base element, which comprises base members and cross members, onto the foundation; fastening the base element to the foundation; placing track elements onto the base element, while adjustable spacer elements, at least one respective shear cleat, and a support are arranged between the base element and track element; and orienting the track elements relative to one another, with respect to the respective base elements, by means of the spacer elements.


French Abstract

L'invention concerne un procédé de production d'une voie préfabriquée pour une installation de transport en plan incliné comportant une plate-forme de transport et un contre-poids dans les mines à ciel ouvert, comprenant les étapes suivantes : la préparation d'une fondation; la pose sur la fondation d'au moins un élément de base constitué de supports de base et de supports transversaux; la fixation de l'élément de base sur la fondation; la pose d'éléments de voie sur l'élément de base par l'intermédiaire d'éléments d'écartement réglables, au moins respectivement d'un tasseau de poussée et d'un support entre l'élément de base et l'élément de voie; et l'alignement des éléments de voie entre eux et vis-à-vis des éléments de base respectifs à l'aide des éléments d'écartement.

Claims

Note: Claims are shown in the official language in which they were submitted.


CLAIMS
1. A method for producing a finished-part track for an inclined conveyor
system
having a conveyor platform and counterweight in opencast mining, comprising
the steps:
.cndot. Providing a foundation;
.cndot. placing at least one base element onto the foundation;
.cndot. fixing the base element to the foundation;
.cndot. placing at least one track element onto the base element with the
interposition of adjustable spacer elements, at least one shear cleat and one
support, respectively, between base element and track element; and
.cndot. aligning the track elements with one another and with respect to
the
respective base elements by way of spacer elements.
2. The method according to claim 1, wherein the placing of the base element
comprises the following steps:
.cndot. Placing at least two base plates onto the foundation;
.cndot. spacing the base plates by way of at least two cross members; and
.cndot. connecting the base plates with the cross members to the base
element.
3. The method according to claim 1 or 2, wherein shelves are inserted between
the
cross members of the base element
4. The method according to any one of claims 1 to 3, wherein after aligning
the
track elements with one another, the respective space is fixed into place by
the
supports.
5. The method according to any one of claims 1 to 4, wherein the track
element,
together with the base element, is placed onto the foundation, wherein spacer

elements, shear cleat, and supports are already interposed between the base
element and the track element.
6. The method according to any one of claims 1 to 5, wherein adjacent base
elements are connected to one another in an overlap area.
7. The method according to any one of claims 1 to 6, wherein in an overlap
area of
two adjacent base elements, the base element is fixed in place on the
foundation.
8. The method according to any one of claims 1 to 7, wherein the prefabricated
track is installed beginning at an upper edge of the open pit.
9. A finished-part track for an inclined conveyor system having a conveyor
platform
and counterweight for opencast mining, comprising:
.cndot. At least one base element for placing onto a foundation;
.cndot. at least one track element for placing onto the base element;
.cndot. a plurality of spacer elements arranged between base element and
track
element, for aligning same with one another; and
.cndot. at least one shear cleat arranged between base element and track
element.
10.The finished-part track according to claim 9, wherein the base element is
comprised of at least:
.cndot. Two base plates for placing onto a foundation; and
.cndot. at least two cross members for spacing the base plates, wherein the
base
plates and the cross members are provided with corresponding connection
structures.
11. The finished-part track according to claim 9, wherein the base carrier is
provided
with shear force consoles.
12

12.The finished-part track according to any one of claims 9 to 11, wherein the
base
carrier is provided with a handrail and steps.
13.The finished-part track according to any one of claims 9 to 12,, wherein at
least
one shelf is inserted between the cross members of the base element.
14.The finished-part track according to any one of claims 9 to 13, wherein the
respective track element is provided with at least one rail so that two track
elements each form a track for the conveyor platform or the counterweight(s)
on
the same level.
15.The finished-part track according to any one of claims 9 to 14, wherein the
rail is
fixedly connected to the track element.
16.The finished-part track according to any one of claims 9 to 14, wherein the
rails
are of several parts, wherein the multi-part rail and the track element are
provided with correspondingly defined fastening structures.
17.The finished-part track according to one any of claims 9 to 16, wherein the
base
element is provided with fastening holes for receiving ground anchors to be
fixed
in place on the foundation.
18. The finished-part track according to any one of claims 9 to 17, wherein
the base
element and/or the track element is provided with connection structures on
both
ends for a form-fit engagement with corresponding connection structures on
adjacent elements.
19.The finished-part track according to claim 18, wherein the connection
structures
of adjacent track parts are provided for screw connection to the elements
adjacent to the connection structures.
13

20.The finished-part track according to any one of claims 9 to 19, wherein the
respective tracks are provided with guide pulleys.
14

Description

Note: Descriptions are shown in the official language in which they were submitted.


i
. CA 02842382 2014-01-20
,
Description
FINISHED-PART TRACK FOR AN INCLINED CONVEYOR SYSTEM FOR
MINING TRUCKS
BACKGROUND OF THE INVENTION
[0001] The invention relates to a finished-part track and the production
thereof.
Specifically, the invention relates to a finished-part track for an inclined
conveyor
system for mining trucks in opencast mining.
[0002] Application for the invention is found in opencast mining, particularly
for
removing the mineral deposit and the waste piles accumulating during
horizontally progressing mining taking place in stair-like sections, wherein
with
increasing mining depth, a mining funnel is formed that is widening
correspondingly greatly towards the top.
[0003] Mining excavation on the earth's surface requires that the waste
located
on top of the deposit, and subsequently, deposit and waste be removed, for
which purpose deposit and waste are mined in so-called stopes, that is, in
step-
like sections. The height of the stopes determined by the firmness of the
ground,
the equipment used, and economic considerations is on average about 15 m.
For removing the loosened material, inclined planes between the stopes are
made into transport routes. The deeper the deposit is mined, the larger is the
opening of the mining funnel thus being formed, widening by about 40 to 60
towards the top. As a general rule, the material to be mined loosened by
drilling
or blasting (hard stone, compact ores) as well as the waste are transported
from
the mining sites to the earth's surface by mining trucks, which are heavy
goods
vehicles built as dump trucks, via the transport routes established between
the
stopes. The serpentines getting longer and longer with increasing extraction
are
thereby travelled upwards at about 10 km/h and downwards at about 35 km/h,
which requires extraordinarily high concentration from the drivers, and always
bears the risk of serious accidents.
1

1
' CA 02842382 2014-01-20
=
[0004] In order to circumvent this problem, inclined conveyor systems are
proposed, with the aid of which the mining trucks are conveyed in an empty
state
to the mining site, and are then conveyed out of the mining funnel in a loaded
state. Essentially, the inclined conveyor system is a mobile plafform, which
can
be moved up and down on an inclined track by way of corresponding tackles.
[0005] The travel track extending down below with the incline of the mining
funnel thereby makes serpentine navigation dispensable, which on the one hand
makes working conditions substantially easier, and on the other hand relieves
the mining trucks at the same time. For a mining truck loaded on the floor of
the
funnel only needs to be placed onto the lowered mobile plafform equipped with
locking means for the car wheels, and is then conveyed automatically to the
top,
where a driver enters the truck for further transport. In this way, a very
flexible,
economical interplay can be achieved, for which different personnel is on hand
at
the funnel floor than is on the earth's surface.
[0006] However, the problem with these inclined conveyor systems is that as a
general rule, the inclined tracks have to be installed using site-mixed
concrete,
which is costly on the one hand, and on the other hand makes it almost
impossible to extend or alter the inclined track as the mining progresses.
SUMMARY OF THE INVENTION
[0007] It is the object of the invention to provide a class-specific conveyor
system, which can be constructed and installed directly at the site of
operation in
a simple and cost-effective manner.
[0008] This objective is met according to the invention by the method and the
finished-part track as defined in the claims.
[0009] Accordingly, an inclined conveyor system is installed extending from
the
edge of the mining funnel, that is, the opencast mine, on the earth's surface
to
the floor of the mining funnel, starting at an upper edge of the opencast
mine.
2

= CA 02842382 2014-01-20
According to the invention, the travel track of the inclined conveyor system
is
made of prefabricated components. The inclined conveyor system further
comprises a conveyor platform that can be accessed by mining trucks, and a
counterweight, which runs underneath said conveyor platform in the travel
track.
In this way, conveyor plafform and counterweight travel within the travel
track on
different tracks arranged in a superimposed fashion, said tracks being
provided
with rails.
[0010] In the method for producing a track system from prefabricated parts, a
foundation is provided initially. The track system can thereby be assembled
starting from the floor of the open pit, or else from the upper edge of the
open pit
to the floor. Preferably, this foundation is built from the excavation
material at
disposal in opencast mines, that is, directly into the walls of the open pit.
At least
one base element is placed onto the constructed foundation. This base element
is formed of at least two base plates, wherein said base plates are spaced
apart
by at least one cross member, and the base plates are connected to the cross
member. This connection of the base plate to the cross member can be done by
way of a form-fit and/or force-fit connection. Beneficial are form elements in
the
connection, which are complemented by screws. For this purpose, both in the
base plate and in the cross member, preferably metal structures are provided
at
appropriate locations, which, particularly preferably, are integrally cast.
Furthermore, the space provided in the supports for the screw connection
(pockets, recesses etc.) can be filled by a grouting with concrete or another
suitable material.
[0011] In order to improve the stability, it is conceivable to construct an
adhesion-promoting, that is, adhesion increasing intermediate layer from
suitable
materials between the base element and the foundation.
[0012] The base element is fixed in place on the foundation by way of
anchorages, which can also extend through the foundation into the natural
subsurface. At least some of the anchorages can thereby be installed in an
3

= CA 02842382 2014-01-20
=
overlap area of two adjacent base elements so that the anchors used there
anchor both base elements.
[0013] When anchoring, the anchors can be mounted on previously prepared
structures in the respective base elements, or else these structures are only
prepared when installed at the installation site. Preferably, these structures
are
bores, through which the anchors are driving into the subsurface. However,
other structures, to which the anchors can be connected, are also feasible.
The
number of anchors primarily depends on the weight of the assembly to be
anchored and the condition of the subsurface.
[0014] After anchoring, at least one track element, preferably at least two
track
elements, are placed onto and connected to the base element. Alternatively,
the
base element can be mounted together with the track elements, wherein in this
case, the structures for the anchors can already be present, or they can be
prepared at the place of installation, wherein the structures can extend both
through the respective track element and through the base element. It is
beneficial that the track elements for the two tracks are identical parts so
there is
no need to manufacture, store, and install different parts.
[0015] With the aid of spacer elements, which are interposed between the base
element and the track element, the individual track elements are aligned with
one another. Furthermore, the individual faces of work, or possible gaps that
developed, both between the adjacent base parts and the adjacent track parts,
and the adjacent rails positioned on the track parts, can be filled, and the
parts
can be coupled in this way. This is particularly beneficial with regard to the
rails
since vibrations of the conveyor plafform, that is, the counterweight can be
reduced.
[0016] Furthermore, the respective bordering base elements and track elements
can be connected by way of connection structures like tension anchors, thread
connections, or any other imaginable form-fit, force-locked, or adhesively
joined
4

i
= CA 02842382 2014-01-20
=
type of connection. The connections, with which cross member and base plate
are connected, are also conceivable here.
[0017] An element of the prefabricated track comprises at least one base
carrier,
at least one track element, and a plurality of spacer elements, which are
arranged between the base carrier and the track elements for the alignment
thereof with one another. Furthermore, at least one shear cleat is provided,
which is likewise arranged between the base carrier and the track element, and
which transfers the static and dynamic stresses impacting the track element to
the base carrier/the base element, and thus to the foundation by way of the
anchorages. Preferably, the shear cleats are centered and in conformity with
one another, both in the track element and in the base carrier. The surfaces
of
the shear cleats touching one another can be made without cladding of the
material of the base carrier/track element, or, for example, metal plates can
be
interposed. Furthermore, shear force consoles for the occurring shear forces
(not in the direction of the travel direction of the plafform/the
counterweight) are
provided on the base carrier. These absorb potentially occurring shear forces
and transfer them to the foundation by way of the anchorages.
[0018] The base carrier can also be provided with at least one structure on
the
two ends pointing to the next base carrier during installation, which allows
adjacent base carriers to be connected to one another, preferably by form fit,
such that while being anchored to the foundation, the base carrier no longer
has
to be held by additional structures. The underside of the base elements facing
the foundation can be calculably roughened by way of inlaid, that is, attached
strips or similar structures molded on the base element, and can be connected
to
the foundation, that is, the subsurface, by local grouting. Furthermore,
shelves
can be placed into the developing interspaces between the cross members and
the base plates for reinforcement. Preferably, these are geometrically
designed
such that they are held between the base carriers and cross members by form-
fit.

= CA 02842382 2014-01-20
[0019] The track elements form two levels of different heights on each base
carrier, and together with another base carrier in a base element, form two
tracks, which, as a result of the differing height levels, are arranged
superimposed upon one another, and are formed of two rails each. These rails
can be connected to the track element either directly, or by way of interposed
structures. Preferably, the rails are of a two-part design so that an upper
part of
the rail is connected to a lower part of the rail by a ¨ preferably detachable
-
connection. Said lower part is detachably or fixedly connected to the track
element. For example, the lower part of the rail ¨ or with a one-piece design,
the
one rail ¨ can be directly cast with the track element. This has the advantage
that a worn upper part of a rail can be replaced, and no elaborate welding of
material on site, for example, is needed. Preferably, all rails for the two
tracks
are of the same type and size so that there is no need for different types of
rail to
be held available at the building site. The spacer elements are arranged
between the base element and the track elements such that a space between
the two elements can be varied. Furthermore, the spacer elements can be
placed such that they are able to transfer the dynamic and static stresses
impacting the track part to the base element. Thus, shear cleat can be
dispensed with. In a preferred embodiment, a spacer element is a trapezoidal
thread spindle with fitting nut, that is, threaded sleeve. A spacer element
such
as this is then inserted into a base carrier, that is, a track element such
that it
can be adjusted, and the respective screw part can engage with the nut part in
the state of assembly of both elements. Generally, any kind of spacer element
can be used (wedges, hydraulic presses etc.). The spacer elements allow a
precise alignment of the travel tracks for the platform and the counterweight,
even with lower installation precision of the base elements. Furthermore, once
the interspace has been adjusted, it can be advantageous to relieve the spacer
elements, at least partially, by using supports between the track element and
the
base carrier.
[0020] Furthermore, the track element can be provided with shear force
holders,
which, in turn, can carry rope guide pulleys. Preferably, each track has a
6

CA 02842382 2014-01-20
dedicated shear force holder and with rope guide pulleys. However, a central
shear force holder is also feasible. Separate rope guides not configured for
transferring the shear forces are feasible as well. The shear force holders,
together with the shear force consoles, reinforce the prefabricated component
in
a beneficial way.
[0021] Possible materials for the prefabricated components are concrete and
steel, however, fabrication from composite materials is also feasible, which
can
also have recycled portions, where appropriate.
[0022] On the outer sides of the base plates, devices for fastening handrails
and
stair segments can be provided so that a walkway next to the track can be
provided.
[0023] The aforementioned features of the invention can be used in any desired
combination without deviating from the essence of the invention. Likewise, it
is
not necessary for all features to be present in one embodiment.
Additional features, characteristics and advantages are shown in the following
description of a preferred embodiment of the present invention, with reference
made to the attached figures, which are to be viewed exclusively as
illustrative,
and in no way as limitative.
BRIEF DESCRIPTION OF THE FIGURES
[0024] Fig. 1 is an overview of an inclined conveyor system for mining trucks
built of prefabricated components according to the invention.
[0025] Fig. 2 is a perspective sectional view of a prefabricated component of
an
embodiment of the invention according to Fig. 1.
[0026] Fig. 3 is a side view from the outside of a prefabricated component of
an
embodiment of the invention according to Fig. 1.
7

CA 02842382 2014-01-20
[0027] Fig. 4 is a cross-sectional view of a prefabricated component of an
embodiment of the invention according to Fig. 1.
DETAILED DESCRIPTION OF THE EMBODIMENT
[0028] Fig. 1 shows an inclined conveyor system for mining trucks 1, the
travel
track of which is built from the prefabricated components 5 according to the
invention. On said travel track 2, both a conveyor platform 4, which can
accommodate a mining truck 3, and a counterweight 6 travel. The conveyor
plafform 4 and the counterweight 6 travel on tracks A and/or B, which are
arranged superimposed upon each other. The incline of travel track 2 is
identified by angle a, which is typically between 40 and 60 .
[0029] Fig. 2 shows the prefabricated component 5, the primary elements of
which are a base element 51 comprising two base carriers 510 (only one is
shown) and three cross members 520 (only one is shown), as well as four track
elements 52 (only two are shown). The base element 51 is connected to the
track elements 52 by way of shear cleats 53 and a plurality of spacer elements
54, and supports 60. The spacer elements 54 are anchored both in the base
carrier 510 and in track element 52, thus connecting elements 510 and 52 in an
adjustable manner. The spacer elements 54 are configured as trapezoidal
spindle lifting units. After adjustment of the spacer elements 54, the
supports 60
relieve the spacer elements 54, at least partially.
[0030] The prefabricated component 5 is provided with two tracks A and B, as
can further be seen in Fig. 2. Said tracks A and B are arranged superimposed
upon one another so that the counterweight 6 can travel through underneath the
conveyor platform 4 when the two meet. The different levels of the tracks come
about as a result of the shape of the base carriers 510, where the fittings
(shear
cleats, spacer elements, support elements etc.) for the track elements 52 are
located on different levels. The track width of the inner and lower track for
the
counterweight 6 is smaller than that of the track for the conveyor platform 4.
8

CA 02842382 2015-08-12
Tracks A and B each are comprised of a pair of rails 55 (shown schematically).
In this embodiment, crane rails of type DIN 536 A 150 are used.
[0031] As can be seen in Fig. 3, the prefabricated component 5 has a shear
cleat, however, only the shear cleat 53 formed between the base carrier 510
and
the track element 52 is shown. Each of the shear cleats 53 of prefabricated
component 5 is provided with an upper part 53a and a lower part 53b. The
upper part 53a is arranged with respect to the lower part 53b such that it is
in
uphill position and overlaps with the lower part 53b. In this way, a static
and
dynamic stress can be transferred to the respective base carrier 510 of the
base
element 51 by way of frictional engagement of the two parts 53a and 53b. The
shear cleats are each centered in the base carrier 510. The overlap of the two
parts 53a and 53b of the shear cleat has to be large enough so that even at
maximal distance between the base carrier 510 and the track element 52 a
sufficiently large overlap surface is available in order to transfer the
occurring
static and dynamic stresses.
[0032] The track element 52 is further provided with a plurality of holes 59,
into
which the anchors are inserted, which then connect the base element to the
foundation. The number
of holes 59, and thus the anchors used per
prefabricated component 5, primarily depends on the load to be transferred,
the
type of anchors, and the subsurface. The holes 59 can already be provided
during the manufacture of the prefabricated component, or they can be made at
the installation site at the open pit, depending on the number of anchors
needed
in the particular section.
[0033] Fig. 3 further shows overlap areas, that is, engagement areas C and D,
respectively, by way of which adjacent prefabricated components are in
engagement with one another. Furthermore, shear force consoles 511 of the
base carrier 510 are shown, which laterally support the track element 52, and,
together with the shear force holders 56, reinforce the prefabricated
component
5. A handrail 512 is mounted to the shear force consoles 511. Together with a
flight of stairs 513, the handrail 512 forms a staircase next to the travel
track of
9

1
t CA 02842382 2014-01-20
the plafform. Sectional view E shows the use of interposed plates in the shear
cleat.
[0034] Fig. 4 is a cross-sectional view of the essentially symmetrical
construction of the prefabricated component 5. The prefabricated component 5
is further provided with two shear force holders 56 and 57, which support the
respective track A and B. These shear force holders 56 and 57 prevent a
deforming of the prefabricated component 5. In this embodiment, shear force
holders 56 and 57 also carry a plurality of rope guide pulleys 58, with which
the
ropes needed for operating the inclined conveyor system 1 are guided.
Sideways on the base carrier 510, shear force consoles 511 are shown. Shear
force holders 56, 57, and shear force consoles 511 reinforce the track
elements
52. By way of the holes 59, both the base carriers 510 and the cross members
520 can be anchored. A joining area of the base carrier 510 with the cross
member 520 is not shown. Details E and F show, obscured, the shear cleats 53
between the respective track elements 52 and the base carriers 510.

Representative Drawing
A single figure which represents the drawing illustrating the invention.
Administrative Status

2024-08-01:As part of the Next Generation Patents (NGP) transition, the Canadian Patents Database (CPD) now contains a more detailed Event History, which replicates the Event Log of our new back-office solution.

Please note that "Inactive:" events refers to events no longer in use in our new back-office solution.

For a clearer understanding of the status of the application/patent presented on this page, the site Disclaimer , as well as the definitions for Patent , Event History , Maintenance Fee  and Payment History  should be consulted.

Event History

Description Date
Time Limit for Reversal Expired 2018-07-19
Change of Address or Method of Correspondence Request Received 2018-01-12
Letter Sent 2017-07-19
Grant by Issuance 2015-12-01
Inactive: Cover page published 2015-11-30
Inactive: Final fee received 2015-09-17
Pre-grant 2015-09-17
Letter Sent 2015-08-26
Amendment After Allowance Requirements Determined Compliant 2015-08-26
Amendment After Allowance (AAA) Received 2015-08-12
Amendment After Allowance (AAA) Received 2015-06-16
Letter Sent 2015-06-05
Notice of Allowance is Issued 2015-06-05
Notice of Allowance is Issued 2015-06-05
Inactive: Approved for allowance (AFA) 2015-05-07
Inactive: Q2 passed 2015-05-07
Inactive: Office letter 2015-04-02
Inactive: Adhoc Request Documented 2015-04-02
Inactive: S.30(2) Rules - Examiner requisition 2015-03-18
Amendment Received - Voluntary Amendment 2015-03-16
Inactive: Report - No QC 2015-03-11
Inactive: Cover page published 2014-03-07
Inactive: Acknowledgment of national entry - RFE 2014-02-20
Letter Sent 2014-02-20
Inactive: First IPC assigned 2014-02-19
Inactive: IPC assigned 2014-02-19
Inactive: IPC assigned 2014-02-19
Inactive: IPC assigned 2014-02-19
Inactive: IPC assigned 2014-02-19
Application Received - PCT 2014-02-19
National Entry Requirements Determined Compliant 2014-01-20
Request for Examination Requirements Determined Compliant 2014-01-20
All Requirements for Examination Determined Compliant 2014-01-20
Application Published (Open to Public Inspection) 2013-01-24

Abandonment History

There is no abandonment history.

Maintenance Fee

The last payment was received on 2015-06-26

Note : If the full payment has not been received on or before the date indicated, a further fee may be required which may be one of the following

  • the reinstatement fee;
  • the late payment fee; or
  • additional fee to reverse deemed expiry.

Patent fees are adjusted on the 1st of January every year. The amounts above are the current amounts if received by December 31 of the current year.
Please refer to the CIPO Patent Fees web page to see all current fee amounts.

Fee History

Fee Type Anniversary Year Due Date Paid Date
MF (application, 2nd anniv.) - standard 02 2014-07-21 2014-01-20
Request for examination - standard 2014-01-20
Basic national fee - standard 2014-01-20
MF (application, 3rd anniv.) - standard 03 2015-07-20 2015-06-26
Final fee - standard 2015-09-17
MF (patent, 4th anniv.) - standard 2016-07-19 2016-07-05
Owners on Record

Note: Records showing the ownership history in alphabetical order.

Current Owners on Record
SIEMAG TECBERG GMBH
Past Owners on Record
HOLGER SETZ
Past Owners that do not appear in the "Owners on Record" listing will appear in other documentation within the application.
Documents

To view selected files, please enter reCAPTCHA code :



To view images, click a link in the Document Description column. To download the documents, select one or more checkboxes in the first column and then click the "Download Selected in PDF format (Zip Archive)" or the "Download Selected as Single PDF" button.

List of published and non-published patent-specific documents on the CPD .

If you have any difficulty accessing content, you can call the Client Service Centre at 1-866-997-1936 or send them an e-mail at CIPO Client Service Centre.


Document
Description 
Date
(yyyy-mm-dd) 
Number of pages   Size of Image (KB) 
Representative drawing 2014-02-20 1 8
Abstract 2014-01-19 2 90
Description 2014-01-19 10 453
Claims 2014-01-19 3 106
Drawings 2014-01-19 4 74
Claims 2015-03-15 4 102
Description 2015-08-11 10 448
Representative drawing 2015-11-12 1 8
Acknowledgement of Request for Examination 2014-02-19 1 177
Notice of National Entry 2014-02-19 1 203
Commissioner's Notice - Application Found Allowable 2015-06-04 1 162
Maintenance Fee Notice 2017-08-29 1 181
PCT 2014-01-19 9 273
Correspondence 2015-04-01 1 23
Amendment after allowance 2015-06-15 2 72
Amendment after allowance 2015-08-11 5 135
Correspondence 2015-08-25 2 25
Final fee 2015-09-16 1 49