Language selection

Search

Patent 2858469 Summary

Third-party information liability

Some of the information on this Web page has been provided by external sources. The Government of Canada is not responsible for the accuracy, reliability or currency of the information supplied by external sources. Users wishing to rely upon this information should consult directly with the source of the information. Content provided by external sources is not subject to official languages, privacy and accessibility requirements.

Claims and Abstract availability

Any discrepancies in the text and image of the Claims and Abstract are due to differing posting times. Text of the Claims and Abstract are posted:

  • At the time the application is open to public inspection;
  • At the time of issue of the patent (grant).
(12) Patent: (11) CA 2858469
(54) English Title: WATER CURRENT POWER GENERATION INSTALLATIONS
(54) French Title: INSTALLATIONS DE PRODUCTION D'ENERGIE ELECTRIQUE HYDRAULIQUE
Status: Expired and beyond the Period of Reversal
Bibliographic Data
(51) International Patent Classification (IPC):
  • F03B 13/26 (2006.01)
  • F03B 17/06 (2006.01)
(72) Inventors :
  • PALETHORPE, BENJAMIN (United Kingdom)
(73) Owners :
  • GE ENERGY (UK) LIMITED
(71) Applicants :
  • GE ENERGY (UK) LIMITED (United Kingdom)
(74) Agent: CRAIG WILSON AND COMPANY
(74) Associate agent:
(45) Issued: 2021-04-20
(86) PCT Filing Date: 2012-12-19
(87) Open to Public Inspection: 2013-06-27
Examination requested: 2017-10-13
Availability of licence: N/A
Dedicated to the Public: N/A
(25) Language of filing: English

Patent Cooperation Treaty (PCT): Yes
(86) PCT Filing Number: PCT/EP2012/076114
(87) International Publication Number: WO 2013092687
(85) National Entry: 2014-06-06

(30) Application Priority Data:
Application No. Country/Territory Date
1122253.6 (United Kingdom) 2011-12-23

Abstracts

English Abstract

An infrastructure arrangement (5) for use in an underwater power generation installation includes a support structure (6) adapted for engagement with a bed (3) of a body of water, and an infrastructure module (7) adapted to house infrastructure equipment for connection to power generating units of the installation. The infrastructure module (7) is releasably engageable with the support structure.


French Abstract

L'invention porte sur un système d'infrastructure (5) destiné à être utilisé dans une installation de production d'énergie sous-marine qui comprend une structure porteuse (6), apte à prendre appui sur un fond (3) d'une nappe d'eau, et un module infrastructure (7) apte à loger un équipement d'infrastructure destiné à être relié à des unités génératrices d'énergie de l'installation. Le module d'infrastructure (7) peut être relié de façon démontable à la structure porteuse.

Claims

Note: Claims are shown in the official language in which they were submitted.


307468-11
14
WHAT IS CLAIMED IS:
1. An underwater power generating installation comprising a
power generation system, and an infrastructure arrangement separate to the
power generation system, the infrastructure arrangement comprising
infrastructure equipment for the installation, the infrastructure equipment
being
connected with the power generating system; and one or more units selected
from: monitoring equipment, electrical switching equipment, electrical
transformer equipment, control equipment, and hydraulic equipment, and
excluding power generating equipment, wherein the infrastructure
arrangement further comprises a first support structure adapted for
engagement with a bed of a body of water, and an infrastructure module
adapted to house the infrastructure equipment, and adapted to be releasably
engageable with the first support structure.
2. An underwater installation as claimed in claim 1, wherein the
power generation system comprises a second support structure adapted for
engagement with the bed of the body of water, and a power generation unit
operable to generate power from a water current and adapted to be releasably
engageable with the second support structure, and wherein the infrastructure
module and the power generation unit include substantially identical
engagement systems.
3. An underwater installation as claimed in claim 1 or 2, wherein
the power generation unit and infrastructure module have respective power
and control connection arrangements that differ from one another.
4. An infrastructure arrangement for use in an underwater power
generating installation, the infrastructure arrangement comprising:
an infrastructure module including a main body housing
infrastructure equipment, a mounting portion which extends from the main
body and which defines a mounting axis, a connection carrier, and a
connector mounted on the connection carrier; and
Date Recue/Date Received 2020-06-04

307468-11
a first support structure adapted for engagement with a bed of a
body of water, and including a support housing, a support connection carrier
attached to the support housing, and a support connector mounted on the
support connection carrier, the support connector being adapted for
releasable engagement with the connector of the infrastructure module,
wherein the mounting portion defines a substantially continuous
mounting surface which extends substantially completely around the mounting
portion, and wherein the support housing defines a substantially continuous
support surface which extends substantially completely around the support
housing, the mounting surface and support surface being arranged to abut
one another substantially continuously when the infrastructure module is
mounted on the first support structure, and
wherein the mounting portion and the support housing are adapted
to cooperate with one another for mounting of the infrastructure module on the
first support structure in any polar orientation about the mounting axis.
5. An infrastructure arrangement as claimed in claim 4, wherein
the infrastructure module includes actuation means operable to move the
connection carrier substantially parallel to the mounting axis, and to rotate
the
connection carrier about the mounting axis.
6. An infrastructure arrangement as claimed in claim 5, wherein
the connection actuation means is provided by a single actuator.
7. An infrastructure arrangement as claimed in any one of claims
4 to 6, wherein the first support structure includes support connection
actuation means operable to move the support connection carrier substantially
parallel to the mounting axis, and to rotate the support connection carrier
about the mounting axis.
8. An infrastructure arrangement as claimed in claim 7, wherein
the support connection actuation means is provided by a single actuator.
Date Recue/Date Received 2020-06-04

307468-11
16
9. An infrastructure arrangement as claimed in any one of
claims
4 to 8, wherein the support connection carrier is removable from the support
housing.
10. An infrastructure arrangement as claimed in claim 9,
wherein
the support connection carrier includes engagement means operable to
engage releasably with the support housing so as to enable releasable
engagement of the support connection carrier with the support housing.
11. An infrastructure arrangement as claimed in claim 9 or 10,
wherein the support connection carrier is provided a substantially planar
plate.
12. An infrastructure arrangement as claimed in any one of
claims
4 to 11, wherein the connection carrier is provided with a predetermined
amount of positional float with respect to the mounting portion.
13. An infrastructure arrangement as claimed in any one of
claims
to 11, wherein the connection carrier is provided with a predetermined
amount of positional float with respect to the actuation means.
14. An infrastructure arrangement as claimed in any one of
claims
5 to 13, wherein the connection carrier includes a locating portion which is
acted upon by the actuation means, and a secondary carrier which carries the
connector, the secondary carrier being provided with a predetermined amount
of positional float with respect to the locating portion.
15. An infrastructure arrangement as claimed in claim 14,
wherein
the connector is provided with a predetermined amount of positional float with
respect to the secondary carrier.
16. An infrastructure arrangement as claimed in any one of
claims 4 to 15, wherein the connector is provided with a predetermined
amount of positional float with respect to the connection carrier.
Date Recue/Date Received 2020-06-04

Description

Note: Descriptions are shown in the official language in which they were submitted.


CA 02858469 2014-06-06
WO 2013/092687 1
PCT/EP2012/076114
WATER CURRENT POWER GENERATION INSTALLATIONS
The present invention relates to water current power generation installations.
BACKGROUND OF THE INVENTION
It is widely known that easily accessible resources of fossil fuels are
declining. In addition,
the impact of the use of fossil fuels upon the environment has become
increasingly
apparent. As a result of this, it has become imperative that viable
alternative energy sources
are used as effectively and efficiently as possible. The use of turbines to
capture the power
of water flow, such as tidal, river and ocean current flows is becoming a
viable source of
alternative energy. The turbine equipment used to capture such water flow
energy typically
includes a shaft driven generator connected using a drivetrain to a rotor
assembly. The rotor
assembly includes a plurality of rotor blades that are driven by the water
flow, so as to turn
an input shaft of the drivetrain.
In order to be economically practical, multiple water current turbine devices
should be
deployed in a suitable area. For example, a tidal turbine farm may have tens
to hundreds of
turbines. The turbines are preferably arranged in an array having multiple
rows of multiple
turbines. The turbine array could be deployed in a tidal flow area, a river
flow, an ocean
current, or any other suitable water current area. Although it is preferable
for the turbines to
be arranged in an array, geography, bathymetry and other factors may mean that
a turbine
farm has another arrangement.
In order that such an array of power generating turbines are able to export
the generated
power from the array, and to receive control signals, it is necessary to
provide an amount of
infrastructure equipment for the array. In a simple arrangement, each power
generating
turbine can be connected directly to infrastructure located on the shore.
However, such a
solution results in many cables being laid, often over large distances.
Offshore wind farms
make use of switching, transformer and control equipment located in dry spaces
above the
surface of the water. For such offshore wind farms, providing the
infrastructure equipment
above the surface does not present any additional problems or issues, since
the wind
turbines themselves are, naturally, above the water.
However, water current turbines are located underwater, and are often located
in water too
deep to make surface breaking structures practical. In addition, since the
remainder of the
array would be under the water surface, it is unlikely that permission would
be given for the
provision of a surface breaking infrastructure unit.

CA 02858469 2014-06-06
WO 2013/092687 2
PCT/EP2012/076114
Installation, maintenance and servicing of such underwater infrastructure
equipment,
particularly in deep sea environments, are highly costly and time consuming
procedures.
Infrastructure equipment typically requires through-life inspection,
maintenance and
servicing. It is therefore desirable to simplify the construction and
deployment of underwater
infrastructure equipment, lowering capital cost and enabling inspection,
servicing and
maintenance of the infrastructure equipment in a relatively cost effective and
efficient
manner.
SUMMARY OF THE INVENTION
According to one aspect of the present invention, there is provided an
underwater power
generating installation comprising a power generation system, and an
infrastructure
arrangement which houses infrastructure equipment for the installation, the
infrastructure
equipment being connected with the power generating system, wherein the
infrastructure
arrangement comprises a support structure adapted for engagement with a bed of
a body of
water, and an infrastructure module adapted to house such infrastructure
equipment, and
adapted to be releasably engageable with the support structure.
In one example of such an installation, the power generation unit comprises a
support
structure adapted for engagement with the bed of the body of water, and a
power generation
unit operable to generate power from a water current and adapted to be
releasably
engageable with the support structure, and the infrastructure module and the
power
generation unit include substantially identical engagement systems.
In one example of such an installation, the power generation unit and
infrastructure module
have respective power and control connection arrangements that differ from one
another.
According to another aspect of the present invention, there is provided an
infrastructure
arrangement for use in an underwater power generation installation, the
infrastructure
arrangement including a support structure adapted for engagement with a bed of
a body of
water, and an infrastructure module adapted to house infrastructure equipment
for
connection to power generating units of the installation, and to be releasably
engageable
with the support structure.
The infrastructure equipment may include one or more unit selected from:
monitoring
equipment, electrical switching equipment, electrical transformer equipment,
control
equipment, and hydraulic equipment.

CA 02858469 2014-06-06
WO 2013/092687 3
PCT/EP2012/076114
According to another aspect of the present invention, there is provided an
underwater
structure comprising an infrastructure module including a main body, a
mounting portion
which extends from the main body and which defines a mounting axis, a
connection carrier,
and a connector mounted on the connection carrier, and a support structure
adapted for
In one example of such a structure, the infrastructure module includes
connection actuation
means operable to move the connection carrier substantially parallel to the
mounting axis,
and to rotate the connection carrier about the mounting axis. In one example
of such a
In one example of such a structure, support structure includes support
connection actuation
means operable to move the support connection carrier substantially parallel
to the mounting
axis, and to rotate the support connection carrier about the mounting axis.
In one example of such a structure, the support connection actuation means is
provided by a
In one example of such a structure, the support connection carrier is
removable from the
support housing.
In one example of such a structure, wherein the support connection carrier
includes
engagement means operable to engage releasably with the support housing so as
to enable

CA 02858469 2014-06-06
WO 2013/092687 4
PCT/EP2012/076114
In one example of such a structure, the connection carrier is provided with a
predetermined
amount of positional float with respect to the mounting portion.
In one example of such a structure, the connection carrier is provided with a
predetermined
amount of positional float with respect to the actuation means.
In one example of such a structure, the connection carrier includes a locating
portion which
is acted upon by the actuation means, and a secondary carrier which carries
the connector,
the secondary carrier being provided with a predetermined amount of positional
float with
respect to the locating portion.
In one example of such a structure, the connector is provided with a
predetermined amount
of positional float with respect to the secondary carrier.
In one example of such a structure, the connector is provided with a
predetermined amount
of positional float with respect to the connection carrier.
BRIEF DESCRIPTION OF THE DRAWINGS
Figure 1 is a schematic view of an example water current power generation
system;
Figure 2 is a schematic drawing of an infrastructure arrangement for use with
the power
generation system of Figure 1;
Figure 3 illustrates an underwater water current power generation array;
Figure 4 illustrates a connection between an infrastructure module and a
support structure of
the arrangement of Figure 2;
Figure 5 illustrates a mounting portion of the infrastructure module of Figure
4;
Figure 6 illustrates a support housing of a support structure of the
arrangement of Figure 2;
Figure 7 illustrates the mounting portion of Figure 5 engaged in a first
configuration with the
support housing of Figure 6;
Figure 8 illustrates the mounting portion of Figure 5 engaged in a second
configuration with
the support housing of Figure 6;

CA 02858469 2014-06-06
WO 2013/092687 5
PCT/EP2012/076114
Figure 9 illustrates an alternative example of mounting portion of the
infrastructure module of
Figure 4;
Figures 10 to 14 illustrate respective examples of connection carrier
mounting; and
Figure 15 illustrates mounting of a connector.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
A water current power generation system 1 is shown in Figure 1 and comprises a
support
structure 2 located on a bed 3 of a body of water. A power generation unit 4,
such as a
turbine device, is mounted on the support structure 2. In this example, as the
water current
flows past the power generation unit 4, a rotor assembly turns, thereby
driving an electrical
generator, or other power converter apparatus, provided in the power
generation unit 4. In
one example, the power generation unit 4 is buoyant, and is winched down to
the support
structure 2.
Figure 2 illustrates an infrastructure arrangement 5 suitable for use with the
power
generation system 1 of Figure 1. The infrastructure arrangement 5 comprises a
support
structure 6, and an infrastructure module 7 adapted for releasable mounting on
the support
structure 6. The infrastructure module 7 houses any appropriate equipment such
as
switches, transformers, measurement and control equipment. In one example, the
infrastructure module 7 is buoyant, and is winched down to the support
structure 2.
The support structure 6 shown in Figure 2 is substantially identical to that
shown in Figure 1
for supporting the power generation unit. One example array that makes use of
the
principles of an aspect of the present invention uses the same basic support
structures for
power generating units and infrastructure equipment modules. In this way, the
same
deployment technique can be utilised for power generating units and
infrastructure
equipment modules. This simplifies the deployment and retrieval of the
infrastructure
module.
It will readily appreciated that the actual form of the support structure need
not be identical to
that of the power generating unit, but simply that the structure should enable
the use of the
same deployment and retrieval techniques as that shown. For example, since the
loading
on the infrastructure module is not as high as that on a turbine unit, the
support structure
may not need to be attached to the bed 3 by piles, but may be held in place by
gravity. The

CA 02858469 2014-06-06
WO 2013/092687 6
PCT/EP2012/076114
infrastructure module support structure may also be lower in height than that
used for the
turbine, since there is not the same requirement for clearance of the blades
of the rotor.
Figure 3 illustrates an array of turbines 1 connected to a common
infrastructure arrangement
5, via illustrative connections 8. The infrastructure arrangement provides
common power,
measurement and control equipment for all of the turbines 1, and it will be
appreciated that
any number of turbines may be provided in the array. Similarly, it will be
appreciated that
any number of infrastructure arrangements 5 may be provided, and that such
arrangements
may be interconnected as appropriate.
The infrastructure arrangement 5 is provided with an external connection 9,
for example, to
an electricity grid (directly or indirectly) and/or to a control/monitoring
centre. In the case
where the infrastructure arrangement is connected to an electricity grid, the
infrastructure
module may include transformer and other electrical equipment for adjusting
the output
voltage of the external connection, so that the output electricity is
appropriate to the power
requirements and length of connection.
The attachment of the infrastructure module 7 to the support structure 6 is
shown in more
detail in Figure 4. The infrastructure module 7 has a main body and is
attached to the
support structure by way of a mount 14 that extends from the main body. The
mount 14
defines a mounting axis M for the infrastructure module 7.
The mount 14 has a mounting flange 15 which engages with an associated support
flange
21 provided by a support housing 20 of the support structure 6. The mounting
and support
flanges 15 and 21 allow the infrastructure module 7 to be affixed to the
support structure 6 in
an appropriate manner.
Figure 5 is a schematic cross-sectional view of an example mount 30 for an
infrastructure
module 7. This example mount 30 is provided with a tapered mounting portion 31
which is
substantially circular in cross-section, and which provides an aperture
therethrough. In the
example shown in Figure 5, the mounting portion 31 is in the form of a
truncated cone, but
could be provided by any suitable shape. It will be appreciated that the
mounting portion 31
need not be tapered nor circular in cross section, but may be provided by any
suitable
shape. For example, the mounting portion 31 may be provided by a hollow
cylinder, or by a
hollow prism.

CA 02858469 2014-06-06
WO 2013/092687 7
PCT/EP2012/076114
The mounting portion 31 has, at a distal end thereof, a mounting flange 32,
which defines a
substantially circular and substantially continuous mounting surface. In the
example shown
in Figure 5, an attachment flange 33 is provided for attaching the mount 30 to
the main body
of the infrastructure module 7. The mount 30 can be bolted, welded, or fixed
in any other
suitable manner, to the infrastructure module 7, and may not require the
provision of the
attachment flange 33.
A connection carrier 35 is provided within the mounting portion 31, and
carries any
appropriate number of electrical, optical and other connectors 38. The precise
nature and
number of connectors 38 carried by the connection carrier 35 is not material
to examples of
the present invention. In Figure 5, the connection carrier 35 is shown in a
first, unconnected,
configuration.
The connection carrier 35 may be provided by any suitable shape and
configuration. The
exemplary connector carrier shown in Figure 5 comprises a carrier shaft (or
locating portion)
35a onto which is mounted a carrier plate 35b. The connectors 38 are carried
by the carrier
plate 35b, on a mating surface of the carrier plate 35b.
The connection carrier shaft 35 is mounted on actuation means 39, such as one
or more
hydraulic or electrical actuators. The actuation means 39 serve to move the
connection
carrier 35 in a direction substantially parallel to the mounting axis M. The
actuation means
39 also operate to rotate the connection carrier 35 about that axis M. The
actuation means
may be provided by any suitable arrangement of equipment. In one example, the
actuation
means comprises a linear actuator linked to the carrier shaft 35a by a linkage
arrangement,
and a rotary actuator that operates directly on the carrier shaft 35a. In
another example, the
actuation means includes an actuator that engages the carrier plate 35b for
rotation of the
connection carrier 35. The actuation means may be located in any convenient
location in
the mounting portion 31, and/or in the infrastructure module 7.
The connection carrier 35 is provided with at least one alignment pin, such as
the two
alignment pins 36 and 37 shown in Figure 5, which extend from the carrier
plate 35b. As will
be described in more detail below, the alignment pins serve to enable accurate
alignment of
the connection carrier 35 on the support structure 6.
Connector cables 40 are connected with the connectors 38, and are routed
through a cable
management system 41 before connecting to cables 42 from the infrastructure
module 7.

CA 02858469 2014-06-06
WO 2013/092687 8
PCT/EP2012/076114
Figure 6 illustrates a schematic cross-sectional view of a support housing 50
provided on the
support structure 6. The example support housing 50 shown in Figure 5 is
substantially
cylindrical, and defines a circular aperture therethrough. It will be readily
appreciated that,
as for the mounting portion 31 of the infrastructure module 7, the support
housing 50 can be
of any suitable shape and cross section.
The support housing 50 includes a support flange 51 which defines a
substantially circular
and substantially continuous support surface onto which the mounting surface
of the mount
30 abuts when the infrastructure module 7 is mounted on the support structure
6.
A support connection carrier 52 is provided in the support housing 50. The
support
connection carrier 52 extends across the aperture of the support housing 50,
and carries
support connectors 59 for connecting to the connectors 38 of the connection
carrier 35 of the
infrastructure module 7. Alignment apertures 60 and 61 are arranged to receive
the
alignment pins 36 and 37 of the infrastructure module 7. It will be
appreciated that any
number of alignment pins and associated apertures can be provided. In one
example, the
alignment holes 60 and 61 have conical openings configured to allow for some
level of initial
misalignment of the alignment pins.
It is to be noted that the alignment pins may be provided on the support
connection carrier,
and the corresponding alignment apertures on the connection carrier of the
mounting
portion. It will be readily appreciated that each of the carriers may be
provided with both
alignment pins and alignment apertures, with corresponding apertures and pins
being
provided on the other of the carriers.
The support connection carrier 52 also includes a cable connector 57 arranged
to connect
the support connectors 59 to an input/output cable 58. The cable 58 is used to
connect the
infrastructure equipment housed in the infrastructure module 7 to the power
generating
unit(s) in the array. The cable 58 may also include connections to other
infrastructure
modules. In addition the cable 58 represents an external connection from the
array, for
example to a control centre and to the electricity grid connection. It will be
appreciated that
any appropriate number of cables and connections can be provided, and that the
cable 58 is
shown in Figure 6 by way of illustration.
In the example shown in Figure 6, the support connection carrier 52 is
removable from the
support housing 50, and is held in place using locking actuators 53 and 54,
which serve to
move engagement features 55 and 56 into engagement with an inner surface of
the support

CA 02858469 2014-06-06
WO 2013/092687 9
PCT/EP2012/076114
housing 50. Such an arrangement enables the support connection carrier 52 to
be removed
from the support housing 50 for maintenance purposes, without the need to
remove the
whole support structure, or support housing, or to undertake complex
underwater cutting and
welding operations.
Figure 7 illustrates the mount 30 of Figure 5 located on the support housing
50 of Figure 6 in
a first, unconnected, configuration. The mount 30 is brought into contact with
the support
housing 50, so that the mounting and support surfaces defined by the
attachment flanges 32
and 51 respectively abut one another. The connectors 37, 38 of the
infrastructure module 7
and the support connectors 59 remain unconnected at this stage.
Figure 8 shows a second configuration in which the connection carrier 35 has
been moved
axially in a direction substantially parallel to the mounting axis M, such
that the connectors
38 and alignment pins 36 and 37 are engaged with associated connectors 59 and
alignment
apertures 60 and 61 on the support connection carrier 52. The actuator 39 is
operated to
move the connection carrier 35 into connection with the support connection
carrier 52.
Before the connection carrier 35 is moved into position axially, it may need
to be rotated in
order that the alignment pins 36 and 37 are substantially aligned with the
alignment holes 60
and 61 respectively. A motor for providing this rotation may be provided
within the mounting
portion 31, or the rotation may be achieved by the actuation means 39.
As the connection carrier 35 moves into connection with the support connection
carrier 52,
the connectors 38 meet with the corresponding connectors 59 to complete the
electrical/hydraulic, optical and/or control connections between the
infrastructure module 7
and the cable 58.
Figure 9 illustrates another example of a mount 30 located on the support
housing 50. In
this example, the mounting portion 31 includes a locating portion 63 which
extends from an
end region of the mounting portion 31. The locating portion 63 extends from
within the
mounting portion 31 past the mounting flange 32. The locating portion 63 is
coaxial with the
mounting portion 31, and is provided with an aperture therethrough. The
locating portion 63
is tapered so as to aid location of the infrastructure module 7 on the support
structure 6. As
the infrastructure module 7 is lowered into place on the support structure 6,
the distal end of
the locating portion 63, which is narrower than the aperture of the support
housing 50 of the
support structure 6, is able to enter the support housing structure 50 with a
degree of
positional freedom. That is, the accuracy of location of the distal end of the
locating portion

CA 02858469 2014-06-06
WO 2013/092687 10
PCT/EP2012/076114
63 is not as fine as that required to locate the mounting and support flanges
32 and 51. As
the infrastructure module 7 continues to be lowered onto the support structure
6, the locating
portion 63 centres the mount 30 on the support housing 50, such that the
mounting and
support surfaces abut one another. It will be appreciated that a similar
locating portion could
be provided by the support housing 50 instead of by the mount 30.
The mounting surface transfers the load of the infrastructure module 7 onto
the support
surface, and hence into the support structure 6. The substantially circular
and substantially
continuous nature of the mounting and support surfaces serves to distribute
the loads
around the support housing, and to remove, or substantially reduce, the
occurrence of point
loading on the support housing.
The substantially circular and substantially continuous nature of the mounting
surface of the
infrastructure module 7 and of the support surface of the support housing 6,
in combination
with the rotatable connection carrier of the infrastructure module 7, also
enables the
mounting portion 30 to be located on the support housing 50 in any polar
orientation with
respect to the mounting axis M.
The ability to mount the infrastructure module 7 on the support structure in
any polar
orientation (that is, without discrete mounting locations) simplifies the
deployment of the
infrastructure module 7 to the support structure 6. This is because there is
no requirement
to orient the unit as it descends into its mounting position on the support
structure 6.
In addition, this polar mounting freedom of the infrastructure module 7
enables the location
and orientation of the support structure 6 to be simplified, since the polar
orientation of the
support housing is not important when the infrastructure module 7 can be
mounted, and then
operated, in any polar orientation with respect to the support structure 6.
Due to the loading associated with tidal flow, it is preferable to use a
clamping arrangement,
such as that shown in UK Patent Number 2448710.
The mounting arrangements described above are particularly advantageous for
use with a
single cable winch deployment system, such as that described in UK Patent
Number
2431628. In such a configuration, a winch cable tube or aperture is provided
substantially
aligned with the mounting axis. In one example, a tube is provided through the
connection
carriers, through an arm of the actuation means, and then through the
infrastructure module
7.

CA 02858469 2014-06-06
WO 2013/092687 11
PCT/EP2012/076114
In a practical example of an arrangement that follows the principles of those
described
above, a degree of positional freedom, or "float" is desirable for at least
some of the
components. In this context, the term "float" is used to mean that a component
has some
flexibility of movement about a nominal mounting position, without the need
for specific
adjustment intervention. This positional float is provided in order to allow
for manufacturing
and positioning tolerance.
Figure 10 illustrates a first example of float, in which the actuation means
39 are able to float
in position with respect to the mount 30. In Figure 10, this floating coupling
is illustrated by
mounting elements 100, which are illustrative only. The elements 100 can be
provided by
any suitable means, for example flexible mountings or slot and pin
arrangements. Using the
arrangement of Figure 10, the whole of the actuation means and connection
carrier
assembly is able to float in position with respect to the mount 30. Following
initial rotational
alignment, as the actuation means 39 moves the connection carrier 35 linearly,
the
alignment pins (not shown in Figure 10 for clarity) are brought into
engagement with the
corresponding alignment apertures. If there is any misalignment of the pins
and apertures,
the alignment pins cause the actuation means and connection carrier assembly
to move with
respect to the mount, as those pins are brought into alignment with the
apertures. The
respective shapes of the alignment pins and alignment apertures serve to bring
the pins into
alignment with the apertures through the linear action of the connection
carrier 35. The float
provided to the actuation means and carrier assembly by the mounting elements
100 enable
the lateral, rotational and angular position of the carrier plate 35b to be
aligned correctly with
the corresponding support connection carrier to enable the connectors to
engage with one
another.
Figure 11 illustrates another example of the provision of float to the
connection carrier 35. In
this example, the actuation means 39 are fixed substantially rigidly with
respect to the mount
30, and the connection carrier 35 is able to float with respect to the
actuation means 39.
This float is illustrated by the elements 101. In this example, the float may
be provided by
specifying bearings between the actuation means 39 and the carrier shaft 35a
that have a
required amount of play. In this way, the carrier shaft 35a and the carrier
plate 35b are able
to move with respect to a nominal mounting position by the action of the
alignment pins
aligning and engaging with the alignment apertures.
Figure 12 illustrates another example of the provision of float to the
connection carrier. In
this example, the actuation means 39 are fixed substantially rigidly with
respect to the mount
30, and the carrier shaft 35a is located in the actuation means 39 using
bearing having

CA 02858469 2014-06-06
WO 2013/092687 12
PCT/EP2012/076114
substantially no play. As such, the carrier shaft 35a and carrier plate 35b
are moveable
linearly, and are rotatable, with respect to the mount 30 substantially
without float. A
secondary carrier 35c is mounted on the carrier plate 35b on mounting elements
102. The
mounting elements 102 are illustrative only and may be provided by any
suitable
arrangement. The mounting elements 102 allow the secondary carrier 35c to
float with
respect to the carrier plate 35b. the secondary carrier plate 35c carries the
alignment pins
and connectors (not show for clarity), and so the float provided to the
secondary plate 35c
enables the alignment of the alignment pins and connectors carried by the
secondary carrier
35c.
Figure 13 illustrates the connection carrier 35, comprising the carrier shaft
35a, and the
carrier plate 35b, and illustrates another example of the provision of float.
Alignment pins 36
and 37 extend from the carrier plate 35b without the provision of float. The
connectors 38
are mounted on the carrier plate 35b by way of mounting elements 103 that
allow a
predetermined amount of float for the connectors 38. As the carrier plate 35b
is brought into
engagement with the support connection carrier of the support structure, the
mounting
elements 103 allow the connectors 38 to align correctly with the support
connectors of the
support structure.
Figure 14 illustrates the connection carrier 35 making use of the float
techniques illustrated
in Figures 11 and 12. As such, a secondary carrier plate 35c is provided on
the carrier plate
35b, and is able to float with respect to the carrier plate 35b. In addition,
connectors 38 are
mounted on the secondary carrier plate 35c by way of elements that allow float
of the
connectors with respect to the secondary carrier plate 35c. Alignment pins 36
and 37 extend
from the secondary carrier plate 35c substantially without float. In this way,
as the
connection carrier is brought into engagement with the support connection
carrier, the
alignment pins engage with the alignment apertures. If there is any slight
misalignment, the
action of the alignment pins engaging with the apertures causes the secondary
carrier plate
35c to move (laterally, rotationally, and/or angularly) such that the
alignment pins are able to
engage fully with the apertures. As the connectors 38 come into engagement
with the
support connectors, the mounting elements 103 allow the connectors to align
correctly,
taking up any minor misalignment.
It will be appreciated that the float provision of Figures 10 to 14 may be
used individually, or
in any suitable combination, depending upon the requirements and specific
design of
connection carrier. The provision of positional float enables the action of
the alignment pins
engaging with the alignment apertures to cause alignment of the connectors to
allow for

CA 02858469 2014-06-06
WO 2013/092687 13
PCT/EP2012/076114
manufacturing or fitting tolerances of the connection carriers. Providing the
individual
connectors with float then enables any connector-related misalignment to be
taken up and
overcome.
Figure 15 illustrates an example of mounting of a connector 38 on the carrier
plate 35b or on
the secondary carrier plate 35c. The connector 38 is attached to the carrier
plate 35b/35c
via a flexible attachment means 65. The attachment means 65 allows a
predetermined
amount of lateral float 66 of the connector 37, and also allows a
predetermined amount of
angular float 67 of the connector 37. In such a manner, an amount of lateral
and angular
mismatch can be taken into account when the connectors are brought into
connection with
support connectors on the support connection carrier. It will be readily
appreciated that the
support may be provided with such positional freedom in addition to, or in
place of, that
provided to the connectors of the infrastructure module.

Representative Drawing
A single figure which represents the drawing illustrating the invention.
Administrative Status

2024-08-01:As part of the Next Generation Patents (NGP) transition, the Canadian Patents Database (CPD) now contains a more detailed Event History, which replicates the Event Log of our new back-office solution.

Please note that "Inactive:" events refers to events no longer in use in our new back-office solution.

For a clearer understanding of the status of the application/patent presented on this page, the site Disclaimer , as well as the definitions for Patent , Event History , Maintenance Fee  and Payment History  should be consulted.

Event History

Description Date
Time Limit for Reversal Expired 2023-06-20
Letter Sent 2022-12-19
Letter Sent 2022-06-20
Letter Sent 2021-12-20
Grant by Issuance 2021-04-20
Inactive: Grant downloaded 2021-04-20
Inactive: Grant downloaded 2021-04-20
Letter Sent 2021-04-20
Inactive: Cover page published 2021-04-19
Pre-grant 2021-03-02
Inactive: Final fee received 2021-03-02
Notice of Allowance is Issued 2020-11-05
Letter Sent 2020-11-05
Notice of Allowance is Issued 2020-11-05
Inactive: Q2 passed 2020-09-29
Inactive: Approved for allowance (AFA) 2020-09-29
Inactive: COVID 19 - Deadline extended 2020-07-02
Common Representative Appointed 2020-06-22
Inactive: Recording certificate (Transfer) 2020-06-22
Inactive: COVID 19 - Deadline extended 2020-06-10
Inactive: Multiple transfers 2020-06-05
Amendment Received - Voluntary Amendment 2020-06-04
Inactive: COVID 19 - Deadline extended 2020-05-28
Examiner's Report 2020-02-12
Inactive: Report - No QC 2020-02-11
Amendment Received - Voluntary Amendment 2019-11-18
Common Representative Appointed 2019-10-30
Common Representative Appointed 2019-10-30
Inactive: S.30(2) Rules - Examiner requisition 2019-07-12
Inactive: Report - QC passed 2019-07-10
Amendment Received - Voluntary Amendment 2019-03-08
Inactive: S.30(2) Rules - Examiner requisition 2018-09-10
Inactive: Report - No QC 2018-09-06
Letter Sent 2017-10-20
Amendment Received - Voluntary Amendment 2017-10-13
Request for Examination Requirements Determined Compliant 2017-10-13
All Requirements for Examination Determined Compliant 2017-10-13
Request for Examination Received 2017-10-13
Appointment of Agent Requirements Determined Compliant 2016-03-30
Inactive: Office letter 2016-03-30
Inactive: Office letter 2016-03-30
Revocation of Agent Requirements Determined Compliant 2016-03-30
Revocation of Agent Request 2016-03-09
Appointment of Agent Request 2016-03-09
Letter Sent 2015-01-21
Inactive: Single transfer 2015-01-08
Inactive: Reply to s.37 Rules - PCT 2014-09-09
Inactive: Cover page published 2014-09-05
Inactive: First IPC assigned 2014-08-07
Inactive: Request under s.37 Rules - PCT 2014-08-07
Inactive: Notice - National entry - No RFE 2014-08-07
Inactive: IPC assigned 2014-08-07
Inactive: IPC assigned 2014-08-07
Application Received - PCT 2014-08-07
National Entry Requirements Determined Compliant 2014-06-06
Application Published (Open to Public Inspection) 2013-06-27

Abandonment History

There is no abandonment history.

Maintenance Fee

The last payment was received on 2020-11-20

Note : If the full payment has not been received on or before the date indicated, a further fee may be required which may be one of the following

  • the reinstatement fee;
  • the late payment fee; or
  • additional fee to reverse deemed expiry.

Please refer to the CIPO Patent Fees web page to see all current fee amounts.

Owners on Record

Note: Records showing the ownership history in alphabetical order.

Current Owners on Record
GE ENERGY (UK) LIMITED
Past Owners on Record
BENJAMIN PALETHORPE
Past Owners that do not appear in the "Owners on Record" listing will appear in other documentation within the application.
Documents

To view selected files, please enter reCAPTCHA code :



To view images, click a link in the Document Description column. To download the documents, select one or more checkboxes in the first column and then click the "Download Selected in PDF format (Zip Archive)" or the "Download Selected as Single PDF" button.

List of published and non-published patent-specific documents on the CPD .

If you have any difficulty accessing content, you can call the Client Service Centre at 1-866-997-1936 or send them an e-mail at CIPO Client Service Centre.


Document
Description 
Date
(yyyy-mm-dd) 
Number of pages   Size of Image (KB) 
Representative drawing 2021-03-19 1 9
Description 2014-06-06 13 649
Drawings 2014-06-06 15 395
Representative drawing 2014-06-06 1 20
Claims 2014-06-06 3 117
Abstract 2014-06-06 1 57
Cover Page 2014-09-05 1 44
Claims 2019-03-08 4 133
Claims 2019-11-18 4 126
Claims 2020-06-04 3 119
Cover Page 2021-03-19 1 37
Notice of National Entry 2014-08-07 1 193
Courtesy - Certificate of registration (related document(s)) 2015-01-21 1 125
Reminder - Request for Examination 2017-08-22 1 125
Acknowledgement of Request for Examination 2017-10-20 1 176
Commissioner's Notice - Application Found Allowable 2020-11-05 1 551
Commissioner's Notice - Maintenance Fee for a Patent Not Paid 2022-01-31 1 542
Courtesy - Patent Term Deemed Expired 2022-07-18 1 537
Commissioner's Notice - Maintenance Fee for a Patent Not Paid 2023-01-30 1 541
Electronic Grant Certificate 2021-04-20 1 2,528
Examiner Requisition 2018-09-10 3 219
PCT 2014-06-06 12 346
Correspondence 2014-08-07 1 56
Correspondence 2014-09-09 2 55
Change of agent 2016-03-09 4 160
Courtesy - Office Letter 2016-03-30 1 24
Courtesy - Office Letter 2016-03-30 1 23
Request for examination / Amendment / response to report 2017-10-13 3 91
Amendment / response to report 2019-03-08 13 478
Examiner Requisition 2019-07-12 3 155
Amendment / response to report 2019-11-18 8 280
Examiner requisition 2020-02-12 3 195
Amendment / response to report 2020-06-04 9 279
Final fee 2021-03-02 3 78