Language selection

Search

Patent 2923677 Summary

Third-party information liability

Some of the information on this Web page has been provided by external sources. The Government of Canada is not responsible for the accuracy, reliability or currency of the information supplied by external sources. Users wishing to rely upon this information should consult directly with the source of the information. Content provided by external sources is not subject to official languages, privacy and accessibility requirements.

Claims and Abstract availability

Any discrepancies in the text and image of the Claims and Abstract are due to differing posting times. Text of the Claims and Abstract are posted:

  • At the time the application is open to public inspection;
  • At the time of issue of the patent (grant).
(12) Patent: (11) CA 2923677
(54) English Title: TIRE MANAGEMENT SYSTEM AND TIRE MANAGEMENT METHOD
(54) French Title: SYSTEME DE GESTION DE PNEU ET PROCEDE DE GESTION DE PNEU
Status: Granted and Issued
Bibliographic Data
Abstracts

English Abstract

In order to provide a tire management system and a tire management method such that the life of a tire can be extended while minimizing a decrease in vehicle work efficiency, a tire management system is provided with: an overload vehicle detection unit (62) that detects an overload vehicle dump truck of which a tire load with respect to a work allocated to each dump truck exceeds a predetermined tire load set for a tire itself of each dump truck; and a work content modifying process unit (63) that, upon detection of the overload vehicle dump truck, performs a process of modifying the work content for the dump truck so that the tire load of the overload vehicle dump truck becomes equal to or less than the predetermined tire load.


French Abstract

En vue de pourvoir à un système de gestion de pneu et à un procédé de gestion de pneu caractérisés en ce que la durée de vie d'un pneu peut être prolongée tout en réduisant à un minimum une diminution de l'efficacité de travail d'un véhicule, ledit système de gestion de pneu est pourvu : d'une unité de détection (62) de véhicule de surcharge qui détecte un camion-benne de véhicule de surcharge dont une charge de pneu par rapport à un travail attribué à chaque camion-benne dépasse une charge de pneu déterminée établie pour un pneu individuel de chaque camion-benne ; et d'une unité de traitement (63) de modification de contenu de travail qui, lors de la détection du camion-benne de véhicule de surcharge, effectue un traitement de modification du contenu de travail pour le camion-benne de sorte que la charge de camion-benne de véhicule de surcharge devienne inférieure ou égale à la charge de pneu déterminée.

Claims

Note: Claims are shown in the official language in which they were submitted.


26
CLAIMS
1. A tire management system that assigns work to each of
a plurality of vehicles and manages a loaded state of a
tire mounted on each of the vehicles that perform the
assigned work, the tire management system comprising:
an overload vehicle detection unit configured to
detect an overload vehicle in which a tire load of the work
assigned to each of the vehicles exceeds a predetermined
tire load set in the tire itself of the vehicle; and
a work contents changing processing unit configured to
perform, when the overload vehicle is detected, processing
of changing work contents of the overload vehicle such that
the tire load of the overload vehicle becomes equal to or
less than the predetermined tire load.
2. The tire management system according to claim 1,
comprising an actual tire load calculation unit configured
to calculate an actual tire load which is a tire load of
the vehicle in actual operation based on loaded amount
information and vehicle speed information notified from
each of the vehicles connected wirelessly,
wherein the overload vehicle detection unit detects an
overload vehicle in which an actual tire load of the work
assigned to each of the vehicles exceeds the predetermined
tire load, and
the work contents change processing unit performs,
when the overload vehicle is detected, processing of
changing the work contents of the overload vehicle such
that the actual tire load of the overload vehicle in actual
operation becomes equal to or less than the predetermined
tire load.
3. The tire management system according to claim 1,

27
comprising a predicted tire load calculation unit
configured to calculate a predicted tire load of work in
a planning stage assigned to each of the vehicles,
wherein the overload vehicle detection unit detects
an overload vehicle in which the predicted tire load
exceeds the predetermined tire load, and
the work contents change processing unit performs,
when the overload vehicle is detected, processing of
changing the work contents in the planning stage of the
overload vehicle such that the predicted tire load of the
overload vehicle becomes equal to or less than the
predetermined tire load.
4. The tire management system according to any one of
claims 1 to 3, wherein the work contents change
processing unit determines whether there is a running
route in which the tire load of the detected overload
vehicle becomes equal to or less than the predetermined
tire load, changes to such a running route when there is
the running route for the detected overload vehicle to
become equal to or less than the predetermined tire load,
and decelerates the overload vehicle or reduces the
loaded amount when there is no running route for the
detected overload vehicle to become equal to or less than
the predetermined tire load.
5. The tire management system according to any one of
claims 1 to 4, wherein the tire load is a TKPH.
6. A tire management method for assigning work to each
of a plurality of vehicles and managing a loaded state of
a tire mounted on each of the vehicles that perform the
assigned work, the tire management method comprising:
an overload vehicle detection step of detecting an

28
overload vehicle in which a tire load of the work assigned
to each of the vehicles exceeds a predetermined tire load
set in the tire itself of the vehicle; and
a work contents change processing step of performing,
when the overload vehicle is detected, processing of
changing work contents of the overload vehicle such that
the tire load of the overload vehicle becomes equal to or
less than the predetermined tire load.
7. The tire management method according to claim 6,
comprising an actual tire load calculation step of
calculating an actual tire load which is a tire load of the
vehicle in actual operation based on loaded amount
information and vehicle speed information notified from
each of the vehicles connected wirelessly,
wherein the overload vehicle detection step detects an
overload vehicle in which an actual tire load of the work
assigned to each of the vehicles exceeds the predetermined
tire load, and
the work contents change processing step performs,
when the overload vehicle is detected, processing of
changing the work contents of the overload vehicle such
that the actual tire load of the overload vehicle in actual
operation becomes equal to or less than the predetermined
tire load.
8. The tire management method according to claim 6,
comprising a predicted tire load calculation step of
calculating a predicted tire load of work in a planning
stage assigned to each of the vehicles,
wherein the overload vehicle detection step detects an
overload vehicle in which the predicted tire load exceeds
the predetermined tire load, and

29
the work contents change processing step performs,
when the overload vehicle is detected, processing of
changing the work contents in the planning stage of the
overload vehicle such that the predicted tire load of the
overload vehicle becomes equal to or less than the
predetermined tire load.
9. The tire management method according to any one of
claims 6 to 8, wherein the work contents change
processing step determines whether there is a running
route in which the tire load of the detected overload
vehicle becomes equal to or less than the predetermined
tire load, changes to such a running route when there is
the running route for the detected overload vehicle to
become equal to or less than the predetermined tire load,
and decelerates the overload vehicle or reduces the
loaded amount when there is no running route for the
detected overload vehicle to become equal to or less than
the predetermined tire load.
10. The tire management method according to any one of
claims 6 to 9, wherein the tire load is a TKPH.

Description

Note: Descriptions are shown in the official language in which they were submitted.


CA 029237 2016-03-
1
DESCRIPTION
TIRE MANAGEMENT SYSTEM AND TIRE MANAGEMENT METHOD
Field
[0001] The present invention relates to a tire
management system and a tire management method that can
extend the life of a tire while minimizing the reduction in
working efficiency of a vehicle.
Background
[0002] Conventionally, at large work sites such as a
rock crushing site and mine, transportation of soil is
performed by running a dump truck. That is, crushed rocks
are loaded on the dump truck as cargo by an excavator, a
wheel loader, and the like at a loading site. The dump
truck then transports the cargo to a soil discharging site
via a predetermined running route, and unloads the cargo at
the soil discharging site. Then, the dump truck moves to
the loading site again via the predetermined running route
and waits for another cargo to be loaded at the loading
site. The dump truck repeatedly performs such series of
work.
[0003] Among the life cycle costs of the dump truck, the
ratio of the cost of the tire is high. Therefore, it is
requested to extend the life of the tire and to reduce the
life cycle cost.
[0004] In order to reduce the tire life cycle cost, for
example, in Patent Literature 1, there are provided a
sensor that measures a state of a tire mounted on each of a
plurality of vehicles transporting mineral resources, and a
tire information management apparatus that wirelessly
receives the measured value output by the sensor. When the
received measured value is not within an allowable range,
the tire information management apparatus transmits, to the
vehicle that has transmitted the measured value,

CA 02923677 2016-03-08
2
deterioration restraint information for restraining
progression of the deterioration of the tire. The
deterioration restraint information is, for example,
information to urge checking of the tire, information to
urge reducing the loaded amount in the vehicle, or
information to urge decelerating the speed of the vehicle.
[0005] In Patent Literature 2, there are provided a load
sensor that measures the load on a tire or a vehicle, and a
speed sensor that detects a rotational speed of the tire or
a vehicle speed of the vehicle, and by using data from the
sensors, the vehicle speed and the load are adjusted to
extend the life of the tire.
Citation List
Patent Literature
[0006] Patent Literature 1: Japanese Laid-open Patent
Publication No. 2007-91202
Patent Literature 2: Japanese Laid-open Patent
Publication No. 04-135902
Summary
Technical Problem
[0007] However, there is a problem that working
efficiency of a vehicle reduces when, as described above, a
loaded amount in the vehicle is reduced or the speed of the
vehicle is decelerated to extend the life of a tire.
[0008] The present invention has been made in view of
the above, and an object thereof is to provide a tire
management system and a tire management method that can
extend the life of a tire while minimizing the reduction in
working efficiency of the vehicle.
Solution to Problem
[0009] To solve the above-described problem and achieve
the object, a tire management system according to the
present invention assigns work to each of a plurality of

CA 02923677 2016-03-08
1
t
1 *
3
vehicles, manages a loaded state of a tire mounted on each
of the vehicles that perform the assigned work and
includes: an overload vehicle detection unit configured to
detect an overload vehicle in which a tire load of the work
assigned to each of the vehicles exceeds a predetermined
tire load set in the tire itself of the vehicle; and a work
contents changing processing unit configured to perform,
when the overload vehicle is detected, processing of
changing work contents of the overload vehicle such that
the tire load of the overload vehicle becomes equal to or
less than the predetermined tire load.
[0010] Moreover, the tire management system according to
the present invention includes an actual tire load
calculation unit configured to calculate an actual tire
load which is a tire load of the vehicle in actual
operation based on loaded amount information and vehicle
speed information notified from each of the vehicles
connected wirelessly, the overload vehicle detection unit
detects an overload vehicle in which an actual tire load of
the work assigned to each of the vehicles exceeds the
predetermined tire load, and the work contents change
processing unit performs, when the overload vehicle is
detected, processing of changing the work contents of the
overload vehicle such that the actual tire load of the
overload vehicle in actual operation becomes equal to or
less than the predetermined tire load.
[0011] Moreover, the tire management system according to
the present invention includes a predicted tire load
calculation unit configured to calculate a predicted tire
load of work in a planning stage assigned to each of the
vehicles, the overload vehicle detection unit detects an
overload vehicle in which the predicted tire load exceeds
the predetermined tire load, and the work contents change

CA 02923677 2016-03-08
4
processing unit performs, when the overload vehicle is
detected, processing of changing the work contents in the
planning stage of the overload vehicle such that the
predicted tire load of the overload vehicle becomes equal
to or less than the predetermined tire load.
[0012] Moreover, in the tire management system according
to the present invention, the work contents change
processing unit determines whether there is a running route
in which the detected overload vehicle becomes equal to or
less than the predetermined tire load, changes to such a
running route when there is the running route for the
detected overload vehicle to become equal to or less than
the predetermined tire load, and decelerates the overload
vehicle or reduces the loaded amount when there is no
running route for the detected overload vehicle to become
equal to or less than the predetermined tire load.
[0013] Moreover, in the tire management system according
to the present invention, the tire load is a TKPH.
[0014] Moreover, a tire management method according to
the present invention assigns work to each of a plurality
of vehicles, manages a loaded state of a tire mounted on
each of the vehicles that perform the assigned work, and
includes: an overload vehicle detection step of detecting
an overload vehicle in which a tire load of the work
assigned to each of the vehicles exceeds a predetermined
tire load set in the tire itself of the vehicle; and a work
contents change processing step of performing, when the
overload vehicle is detected, processing of changing work
contents of the overload vehicle such that the tire load of
the overload vehicle becomes equal to or less than the
predetermined tire load.
[0015] Moreover, the above-described tire management
method according to the present invention includes an

CA 02923677 2016-03-08
)
actual tire load calculation step of calculating an actual
tire load which is a tire load of the vehicle in actual
operation based on loaded amount information and vehicle
speed information notified from each of the vehicles
5 connected wirelessly, the overload vehicle detection step
detects an overload vehicle in which an actual tire load of
the work assigned to each of the vehicles exceeds the
predetermined tire load, and the work contents change
processing step performs, when the overload vehicle is
detected, processing of changing the work contents of the
overload vehicle such that the actual tire load of the
overload vehicle in actual operation becomes equal to or
less than the predetermined tire load.
[0016] Moreover, the above-described tire management
method according to the present invention includes a
predicted tire load calculation step of calculating a
predicted tire load of work in a planning stage assigned to
each of the vehicles, the overload vehicle detection step
detects an overload vehicle in which the predicted tire
load exceeds the predetermined tire load, and the work
contents change processing step performs, when the overload
vehicle is detected, processing of changing the work
contents in the planning stage of the overload vehicle such
that the predicted tire load of the overload vehicle
becomes equal to or less than the predetermined tire load.
[0017] Moreover, in the above-described tire management
method according to the present invention, the work
contents change processing step determines whether there is
a running route in which the detected overload vehicle
becomes equal to or less than the predetermined tire load,
changes to such a running route when there is the running
route for the detected overload vehicle to become equal to
or less than the predetermined tire load, and decelerates

CA 02923677 2016-03-08
6
the overload vehicle or reduces the loaded amount when
there is no running route for the detected overload vehicle
to become equal to or less than the predetermined tire
load.
[0018] Moreover, in the above-described tire management
method according to the present invention, the tire load is
a TKPH.
[0019] According to the present invention, the overload
vehicle detection unit detects an overload vehicle in which
a tire load of work assigned to each vehicle exceeds a
predetermined tire load set in the tire itself of the
vehicle, and the work contents change processing unit
performs, when the overload vehicle is detected, processing
of changing work contents of the overload vehicle such that
the tire load of the overload vehicle becomes equal to or
less than the predetermined tire load. At this time, the
work contents change to a running route in which the tire
load becomes equal to or less than the predetermined tire
load is preferentially performed. Therefore, it is
possible to extend the life of the tire while minimizing
the reduction in working efficiency of the vehicle.
Brief Description of Drawings
[0020] FIG. 1 is a schematic view illustrating a
schematic configuration of a management system including a
tire management system according to a first embodiment of
the present invention.
FIG. 2 is a diagram illustrating an example of a
running route network stored in a running route information
DB.
FIG. 3 is a side view illustrating a configuration of
a dump truck.
FIG. 4 is a block diagram illustrating the
configuration of the dump truck.

CA 02923677 2016-03-08
7
FIG. 5 is a block diagram illustrating a configuration
of a management apparatus.
FIG. 6 is a flowchart illustrating a tire load
balancing processing procedure by a tire load balancing
processing unit.
FIG. 7 is a time chart illustrating exemplary work of
one cycle.
FIG. 8 is a diagram illustrating a change over time of
an actual tire load of the dump truck.
FIG. 9 is a block diagram illustrating a configuration
of a management apparatus according to a second embodiment.
FIG. 10 is a flowchart illustrating a tire load
balancing processing procedure by a tire load balancing
processing unit illustrated in FIG. 9.
Description of Embodiments
[0021] In the following, embodiments of the present
invention will be described with reference to the attached
drawings.
[0022] (First Embodiment)
[Overview of System]
FIG. 1 is a schematic view illustrating a schematic
configuration of a management system including a tire
management system according to a first embodiment of the
present invention. A management system 1 is provided at a
large work site such as a rock crushing site and mine, and
transportation of soil, ores, and the like is performed by
running a plurality of dump trucks 2. At the large work
site, there are loading sites E21 and E22. A loading
machine 3 is disposed at each of the loading sites E21 and
E22. The loading machine 3 is capable of loading a cargo
on the dump truck 2. The loading machine 3 is an
excavator, an electric shovel, a wheel loader, or the like.
The dump truck 2 is an example of a vehicle capable of

CA 02923677 2016-03-08
8
running for transporting the cargo. The cargo is soil and
ores generated by mining.
[0023] The dump truck 2 is capable of running a running
path HL between the loading sites E21 and E22 and soil
discharging sites El0 and Ell. The dump truck 2 is loaded
with the cargo at the loading sites E21 and E22. The
loading sites E21 and E22 are regions in which the cargo is
loaded in the mine. The dump truck 2 is loaded with the
cargo at loading positions P21 and P22 of the loading sites
E21 and E22. The loading machine 3 loads the cargo on the
dump truck 2 located at the loading positions P21 and P22.
Thereafter, the dump truck 2 moves to the objective soil
discharging sites El0 and Ell via the predetermined running
path HL. Then, the dump truck 2 unloads the cargo at the
objective soil discharging sites El0 and Ell. The soil
discharging sites El0 and Ell are regions in which the
cargo is discharged in the mine. The dump truck 2
discharges the cargo at soil discharging positions P10 and
Pll of the soil discharging sites El0 and Ell.
[0024] The management system 1 manages at least the
plurality of dump trucks 2. Each dump truck 2 is an
unmanned dump truck operated by a command signal from a
management apparatus 4, that is, no operator is in the dump
truck 2. The management apparatus 4 is disposed in a
control facility 6. Between the management apparatus 4 and
the dump truck 2, a wireless communication system
wirelessly connecting the management apparatus 4 and the
dump truck 2 via a base station 5 is formed.
[0025] [Example of Running Route Network]
The dump truck 2 repeats the cycle of transporting the
cargo from the loading site to the soil discharging site,
discharging the cargo at the soil discharging site, and
then returning to the loading site without the cargo. Work

CA 02923677 2016-07-18
9
performed by the dump truck 2 includes loading of the
cargo, loaded running, discharging soil, and unloaded
running. A large work site, as indicated in the running
route network illustrated in FIG. 2, has a plurality of
loading positions P21 to P24 of the loading sites, a
plurality of soil discharging positions Pll to P15 of the
soil discharging sites, a plurality of intersections P31
to P34, and a plurality of running paths HL connecting
between the loading positions P21 to P24, the soil
discharging positions Pll to P15, and the intersections
P31 to P34. In FIG. 2, the loading positions P21 and P22
are loading positions of ores, and the loading positions
P23 and P24 are loading positions of surface soil.
Moreover, the soil discharging position Pll is a soil
discharging position for the crusher, the soil
discharging positions P12 and P13 are soil discharging
positions of the ores, and the soil discharging positions
P14 and P15 are soil discharging positions of the surface
soil. There are also a refueling position P41 and a
parking lot position P42. Specific work of the dump truck
2 is, for example, work that passes through a running
route R1 illustrated in FIG. 2. That is, the dump truck 2
is loaded with ores at the loading position P21 and
transports the ores via the intersections P31 and P32,
discharges the ores at the soil discharging position P13,
and returns to the loading position P21 via the
intersections P32 and 231. The dump truck 2 performs work
according to the operation instruction from the
management apparatus 4. The operation instruction
includes information of loading sites, soil discharging
sites, and running routes. The work performed by the dump
truck 2 may include the running to the refueling position
and the running to the parking lot position.
[0026] [Dump Truck]

CA 02923677 2016-03-08
As illustrated in FIGS. 3 and 4, the dump truck 2 has
a vehicle main body 21, a vessel 22, a processing unit 23,
a gyro sensor 24, a speed sensor 25, a load sensor 26, a
communication unit 27 to which an antenna 27a is connected,
5 and a GPS apparatus 28 to which an antenna 28a is connected
and which detects a position of the vehicle main body 21.
A driving apparatus is disposed in the vehicle main body
21. The driving apparatus includes an internal combustion
engine such as a diesel engine, a generator operated by the
10 internal combustion engine, and an electric motor operated
by the power generated by the generator. A vehicle wheel
29 is driven by the electric motor. The vehicle wheel 29
is of a so-called electric driven type including a tire 29a
and a wheel 29b. The vehicle wheel may be of a so-called
mechanical driven type, which transmits motive power of the
internal combustion engine to the vehicle wheel via a
transmission including a torque converter.
[0027] The vessel 22 includes a load-carrying platform
on which the cargo is loaded. The vessel 22 is disposed on
top of the vehicle main body 21 so as to be swingable. The
cargo is loaded into the vessel 22 by the loading machine
3. At the soil discharging time, the vessel 22 is lifted
to discharge the cargo. The load sensor 26 is provided on
a suspension cylinder 30 and detects the loaded amount in
the vessel 22. The load sensor 26 outputs a detection
signal to the processing unit 23. The processing unit 23
determines the loaded amount in the dump truck 2 based on
the detection signal of the load sensor 26.
[0028] The gyro sensor 24 detects an orientation change
amount of the dump truck 2. The gyro sensor 24 outputs a
detection signal to the processing unit 23. The processing
unit 23 can determine an orientation of the dump truck 2
based on the detection signal of the gyro sensor 24.

CA 02923677 2016-03-08
11
[0029] The speed sensor 25 detects a running speed of
the dump truck 2. The speed sensor 25 detects the running
speed of the dump truck 2 by detecting a rotational speed
of a drive shaft of the vehicle wheel 29. The speed sensor
25 outputs a detection signal to the processing unit 23.
The processing unit 23 can determine a moving distance
(running distance) of the dump truck 2 based on the
detection signal of the speed sensor 25 and time
information from a timer (not illustrated) incorporated in
the processing unit 23.
[0030] The GPS apparatus 28 detects the position of the
dump truck 2 using signals from a plurality of global
positioning system (GPS) satellites 7 (refer to FIG. 1).
The detection signal is output to the processing unit 23.
[0031] The processing unit 23 has an identification ID
23a that identifies the dump truck 2. The processing unit
23 transmits, together with the identification ID 23a, at
least vehicle position information, loaded amount
information, and vehicle speed information to the
management apparatus 4 via the communication unit 27.
[0032] In response, the management apparatus 4 outputs,
together with the identification ID 23a, the running route
and speed command to the dump truck 2 so that the dump
truck 2 runs on the running route corresponding to the
planned work. A running control unit 31 controls the
running of the dump truck 2 by controlling driving of a
corresponding actuator 32 based on the input running route
and speed command.
[0033] [Management Apparatus]
As illustrated in FIG. 5, the management apparatus 4
has a management unit 40, an operation input unit 41, a
display unit 42, a storage unit 43, and a communication
unit 44 including an antenna 44a.

CA 02923677 2016-03-08
12
[0034] The operation input unit 41 includes a keyboard,
a touch panel, a mouse, and the like. The operation input
unit 41 is capable of inputting an operation signal to the
management unit 40. The operation input unit 41 may be a
touch panel that functions also as the display unit 42.
[0035] The display unit 42 includes, for example, a flat
panel display such as a liquid crystal display. The
display unit 42 is capable of displaying information on the
position of the dump truck 2.
[0036] The storage unit 43 has a work assignment
database (DB) 55, a running route information database (DB)
56, and a map database (DB) 57. In the work assignment DB
55, for example, a plurality of work contents done in a day
is described in association with each identification ID 23a
of the dump truck 2. In the work contents, the loading
site, the soil discharging site, and the running route are
described. For each identification ID 23a of the dump
truck 2, a set tire load, an actual tire load, and a
predetermined tire load are described. The set tire load
and the predetermined tire load are values that are set in
advance. On the other hand, the actual tire load is a
value updated in real time during operation of the dump
truck 2.
[0037] Generally, the tire load includes a tire TKPH
(Ton Km Per Hour) which is a load index set in advance to
the tire itself, and a working condition TKPH which is a
load index in actual work. The set tire load is the tire
TKPH, the index indicating the possible work amount within
the range not exceeding the limit for heat generation of
the tire, and is represented by (load x speed). On the
other hand, the working condition TKPH is the actual tire
load, and is represented by (average applied tire load) x
(average working speed). The average applied tire load is

CA 02923677 2016-03-08
,
13
determined by:
average applied tire load = ((applied tire load when
vehicle is empty) + (applied tire load when vehicle is
loaded))/2.
The average working speed is determined by:
average working speed = ((distance of one cycle) x
(number of cycles in a day))/(total working time in a day).
The applied tire load, when the vehicle is empty, is the
average applied tire load obtained by dividing the load,
registered in advance, of the empty dump truck 2 by the
number of tires of the dump truck. Moreover, the applied
tire load, when the vehicle is loaded, is the average
applied tire load obtained by dividing the load of the
loaded dump truck 2 determined based on the loaded amount
information sent from the dump truck 2 by the number of
tires of the dump truck. It is preferable to use the tire
so as to satisfy set tire load > actual tire load. When
used without satisfying this condition, the tire causes,
for example, heat separation which shortens the tire life.
The predetermined tire load is a value set in the
embodiment, and is a threshold value equal to or less than
the set tire load.
[0038] In the running route information DB 56, the
information of the running route network illustrated in
FIG. 2 is described. The information of the running route
network includes each position information such as the
loading position, the soil discharging position, and the
intersection, and each connection relationship information.
In the running route information DE 56, the vehicle speed
set on each running path HL is defined.
[0039] The communication unit 44 is connected
communicatively to each dump truck 2 via the antenna 44a
and the base station 5.

CA 02923677 2016-03-08
14
[0040] The management unit 40 has a work assignment
processing unit 50, a tire load balancing processing unit
51, an operation instruction control unit 52, and a
monitoring unit 53. The work assignment processing unit 50
performs processing of creating the work assignment DB 55
of a day according to the operation input from the
operation input unit 41. At that time, the actual tire
load of the work assignment DB 55 is not set.
[0041] The tire load balancing processing unit 51 has an
actual tire load calculation unit 61, an overload vehicle
detection unit 62, and a work contents change processing
unit 63. The actual tire load calculation unit 61
calculates the actual tire load of the dump truck 2 in
actual operation based on the loaded amount information and
the vehicle speed information notified from each dump truck
2 connected wirelessly. The overload vehicle detection
unit 62 detects an overload vehicle in which the actual
tire load of the work assigned to each dump truck 2 exceeds
the predetermined tire load equal to or less than the set
tire load of the dump truck. The work contents change
processing unit 63 performs, when the overload vehicle is
detected, processing of changing the work contents of each
dump truck 2 so that the actual tire load in actual
operation becomes equal to or less than the predetermined
tire load. Detailed processing in the tire load balancing
processing unit 51 will be described later.
[0042] The operation instruction control unit 52, as
will be described later, outputs to each dump truck 2 an
operation instruction which causes the dump truck 2 to
execute the work contents described in the work assignment
DB 55, and instructs the running control of the dump truck
2.
[0043] The monitoring unit 53 monitors the operating

CA 029237 2316-133-
7
status of the dump truck 2. Furthermore, the monitoring
unit 53 displays the operating status of the dump truck 2
on the display unit 42 based on the vehicle position
information and the vehicle speed information transmitted
5 from the dump truck 2. At this time, a map from the map DB
57 is displayed on the display unit 42. On the map, the
running route network from the running route information DB
56, and an icon of the dump truck 2 are displayed. The
icon is displayed differently between a loaded state and an
10 unloaded state. For example, the color of a load-carrying
platform is changed between the loaded state and the
unloaded state. In addition, the identification ID of the
dump truck is also added on the icon.
[0044] [Running Control of Dump Truck]
15 As described above, the management unit 40 outputs the
running route and the speed command to the dump truck 2.
As a result, the dump truck 2 runs on the running path HL
between the loading site and the soil discharging site
based on the input running route and speed command. The
processing unit 23 runs the dump truck 2 according to the
created running route while estimating the current position
of the dump truck 2 using dead reckoning. The dead
reckoning is a navigation to estimate the current position
of the dump truck 2 based on the orientation and the moving
distance from the origin whose latitude and longitude are
known. The orientation of the dump truck 2 is detected
using the gyro sensor 24 disposed in the dump truck 2. The
moving distance of the dump truck 2 is detected using the
speed sensor 25 disposed in the dump truck 2. The
processing unit 23 outputs a steering command and a speed
command to the running control unit 31 so that the dump
truck 2 runs on the planned running route, based on the
orientation and the moving distance of the dump truck 2.

CA 02923677 2016-03-08
16
[0045] The processing unit 23 runs the dump truck 2
while correcting the estimated position determined by the
dead reckoning described above using the GPS apparatus 28.
When the running distance of the dump truck 2 gets longer,
an error between the estimated position and the actual
position occurs due to the accumulation of the detection
error of the gyro sensor 24 and the speed sensor 25. As a
result, there is a possibility that the dump truck 2 runs
deviating from the running route. Therefore, the
processing unit 23 runs the dump truck 2 while making
corrections using the position information of the dump
truck 2 detected by the GPS apparatus 28.
[0046] [Tire Load Balancing Processing]
The tire load balancing processing procedure by the
tire load balancing processing unit 51 will be described
with reference to the flowchart illustrated in FIG. 6. The
processing is repeatedly performed at predetermined
intervals.
[0047] In FIG. 6, first, the actual tire load
calculation unit 61 acquires the loaded amount information
and the vehicle speed information of each dump truck 2
(step S101). Then, the actual tire load calculation unit
61 calculates the actual tire load of one work cycle (step
S102). After that, the overload vehicle detection unit 62
determines whether the actual tire load calculated by the
actual tire load calculation unit 61 exceeds the
predetermined tire load (step S103). When the actual tire
load does not exceed the predetermined tire load (step
S103, No), the work contents change processing unit 63 ends
the present processing. In step S102, the actual tire load
of one work cycle is calculated. Alternatively, however,
the actual tire loads of a plurality of work cycles may be
calculated.

CA 02923677 2016-03-08
17
[0048] On the other hand, when the actual tire load
exceeds the predetermined tire load (step S103, Yes), the
work contents change processing unit 63 determines whether
there is a running route in which the actual tire load
becomes equal to or less than the predetermined tire load
(step S104). When there is a running route in which the
actual tire load becomes equal to or less than the
predetermined tire load (step S104, Yes), the work contents
change processing unit 63 performs processing of changing
the work contents of the target dump truck 2 to the running
route in which the actual tire load becomes equal to or
less than the predetermined tire load (step S105), and ends
the present processing.
[0049] On the other hand, when there is no running route
in which the actual tire load becomes equal to or less than
the predetermined tire load (step S104, No), the work
contents change processing unit 63 performs processing of
changing the work contents of the target dump truck 2 to
the work of decelerating for the actual tire load to become
equal to or less than the predetermined tire load, or to
the work of reducing the loaded amount (step S106), and
ends the present processing.
[0050] In step S104, the determination as to whether
there is a running route in which the actual tire load
becomes equal to or less than the predetermined tire load
is performed so as to suppress the reduction in working
efficiency of the dump truck 2 by preferentially performing
a work change of only changing the running route.
[0051] As illustrated in FIG. 2, in a case where the
current running route is defined as R2 by the loading
position P24, the intersection P34, and the soil
discharging position P15, the work change of only the
running route includes, for example, a case where the

CA 02923677 2016-03-08
18
current running route is changed to a new running route R3
that passes through the intersections P34 and P33 without
changing the loading position P24 and the soil discharging
position P15, and a case where the current running route is
changed to a running route R4 where the soil discharging
position P15 is changed to the soil discharging position
P14.
[0052] As illustrated in FIG. 7, the work of one cycle
that passes through the running route includes a loading
process, a loaded running process, a soil discharging
process, and an unloaded running process. There are some
running routes in which the vehicle speed is low in a
loaded running process and an unloaded running process, and
it is possible to reduce the actual tire load by changing
to such a running route in which a low vehicle speed
applies. Moreover, since there are a loading position and
a soil discharging position where the waiting time is long
in the loading process and the soil discharging process, it
is possible to reduce the actual tire load by changing to a
running route including the loading position and the soil
discharging position with long waiting time.
[0053] The work change by step S106 is for decelerating
the vehicle speed of the dump truck 2 itself or reducing
the loaded amount without changing the running route.
[0054] The tire load balancing processing unit 51
extends the life of the tire overall by balancing the tire
load of each work while minimizing the reduction in work
efficiency by, as described above, performing the work
contents change of changing the running route.
[0055] Therefore, as illustrated in FIG. 8, work that
indicates an actual tire load characteristic Li that
exceeds a set tire load L is reduced, and the work is
changed to work in which the actual tire load becomes equal

CA 029237 2016-03-08
19
to or less than the predetermined tire load Lth like actual
tire load characteristics L2 and L3. As a result, the tire
load of the work is balanced, thereby extending the life of
the tire overall.
[0056] The actual tire load calculation unit 61
described above may be provided in the dump truck 2 and
configured to transmit the calculation result to the
management apparatus 4.
[0057] (Second Embodiment)
FIG. 9 is a block diagram illustrating a configuration
of a management apparatus 4 of a tire management system
according to a second embodiment of the present invention.
According to the first embodiment described above, the work
contents are changed by detecting the actual tire load in
real time. In the second embodiment, however, a predicted
tire load is calculated in the planning stage and the tire
load of the work is balanced in the planning stage.
[0058] The management apparatus 4 illustrated in FIG. 9
is provided with a tire load balancing processing unit 71
instead of the tire load balancing processing unit 51
illustrated in FIG. 5. The other configuration is the same
as that in the first embodiment. The tire load balancing
processing unit 71 has a predicted tire load calculation
unit 81, an overload vehicle detection unit 82, and a work
contents change processing unit 83.
[0059] The predicted tire load calculation unit 81
calculates a predicted tire load of the work in the
planning stage assigned to each dump truck. The overload
vehicle detection unit 82, with reference to a work
assignment DB 55, detects an overload vehicle in which the
predicted tire load exceeds a predetermined tire load equal
to or less than a set tire load set to the tire itself of
each dump truck 2. The work contents change processing

CA 029237 2016-03-
20
unit 83 performs, when the overload vehicle is detected,
processing of changing the work contents in the planning
stage of each dump truck 2 so that the predicted tire load
of the overload vehicle becomes equal to or less than the
5 predetermined tire load.
[0060] [Tire Load Balancing Processing in Planning
Stage]
The tire load balancing processing procedure by the
tire load balancing processing unit 71 will be described
with reference to the flowchart illustrated in FIG. 10.
The processing is repeatedly performed at predetermined
intervals.
[0061] In FIG. 10, first, the predicted tire load
calculation unit 81 acquires planned work at the planning
stage of each dump truck 2 from the work assignment DE 55
(step S201). Then, the predicted tire load calculation
unit 81 calculates a predicted tire load of the planned
work (step S202).
[0062] The predicted tire load (predicted working
condition TKPH) is determined by:
predicted tire load = (predicted applied tire load) x
(predicted working speed).
The predicted applied tire load is determined by:
predicted applied tire load = ((applied tire load when
vehicle is empty) + (applied tire load when vehicle is
loaded))/2.
As described above, the applied tire load, when the vehicle
is empty, is the average applied tire load obtained by
dividing the load of the empty dump truck 2 registered in
advance by the number of tires of the dump truck.
Moreover, the applied tire load, when the vehicle is
loaded, is the average applied tire load obtained by
dividing the load of the loaded dump truck 2 determined

CA 02923677 2016-03-08
,
,
21
based on the loaded amount information sent from the dump
truck 2 by the number of tires of the dump truck.
[0063] Meanwhile, a predicted working speed can be
determined based on an interval vehicle speed which is
registered in advance for each running path HL in the
running route information DB 56. The predicted working
speed may be determined based on a designated speed (speed
command) to the dump truck 2 calculated based on running
route three dimensional information of the running route
information DB 56. The designated speed is determined by
using tilt information, curvature information, swing
acceleration limit, and the like of the running path HL.
The predicted working speed may be obtained by predicting
the interval speed information based on past dump truck
running record information of the running route.
[0064] Then, the overload vehicle detection unit 82
determines whether the predicted tire load calculated by
the predicted tire load calculation unit 81 exceeds the
predetermined tire load (step S203). After that, when the
predicted tire load does not exceed the predetermined tire
load (step S203, No), the work contents change processing
unit 83 ends the present processing.
[0065] On the other hand, when the predicted tire load
exceeds the predetermined tire load (step S203, Yes), the
work contents change processing unit 83 determines whether
there is a running route in which the predicted tire load
becomes equal to or less than the predetermined tire load
(step S204). When there is a running route in which the
predicted tire load becomes equal to or less than the
predetermined tire load (step S204, Yes), the work contents
change processing unit 83 performs processing of changing
the planned work contents of the target dump truck 2 to the
running route in which the predicted tire load becomes

CA 029237 2016-03-08
22
equal to or less than the predetermined tire load (step
S205), and ends the present processing.
[0066] On the other hand, when there is no running route
in which the predicted tire load becomes equal to or less
than the predetermined tire load (step S204, No), the work
contents change processing unit 83 performs processing of
changing the planned work contents of the target dump truck
2 to the planned work of decelerating for the predicted
tire load to become equal to or less than the predetermined
tire load, or to the planned work of reducing the loaded
amount (step S206), and ends the present processing.
[0067] In the second embodiment, similar to the first
embodiment, in step S204, the determination as to whether
there is a running route in which the predicted tire load
becomes equal to or less than the predetermined tire load
is performed so as to suppress the reduction in working
efficiency of the dump truck 2 by preferentially performing
a work change of only changing the running route.
[0068] In the second embodiment, since the tire load
balancing of the work is performed before the actual
operation of the dump truck 2, it is possible to extend the
life of the tire while suppressing the reduction in working
efficiency immediately after the start of the actual
operation. In the second embodiment, the tire load
balancing processing in real time may be performed similar
to the processing in the first embodiment.
[0069] It should be noted that in the first and second
embodiments described above, the predetermined tire load is
preferably set at a predetermined ratio of the tire load
(tire TKPH) of each dump truck. In addition, the
predetermined tire load is preferably provided on each
vehicle such as the dump truck 2. Furthermore, in the
second embodiment, a large predetermined tire load is set

CA 02923677 2016-03-08
23
in advance, and when the predicted tire load does not
exceed the predetermined tire load, it is preferable that
the predetermined tire load be lowered sequentially, and
the work contents change to the planned work with the
highest predicted tire load be preferentially performed.
As a result, the tire load balancing processing which
further extends the life of the tire can be reliably
performed.
[0070] In the first and second embodiments described
above, an unmanned dump truck has been described as an
example of a transporting vehicle, but also a manned dump
truck can be applied. In a case of a manned dump truck,
the operation instruction such as work contents change is
displayed on a display unit of the manned dump truck, so
that the operator of the manned dump truck is notified to
the operation instruction.
[0071] In addition, the wireless communication system
between the management apparatus 4 serving as a master
station and each dump truck 2 serving as a slave station is
connected to the base station 5. Alternatively, the
wireless communication system may be a wireless ad hoc
network system not using any base station 5, that is, an
autonomous decentralized wireless network system. In such
case, it is preferable that a similar function to that of
the management apparatus 4 serving as the master station be
mounted in one dump truck 2. By performing vehicle-to-
vehicle communication between the dump trucks 2, the
wireless communication system with a simple configuration
can be realized. The vehicle-to-vehicle communication may
be realized through a system in which the dump trucks 2
communicate with each other, or may be realized by
communicatively connecting the dump trucks 2 by creating a
simple wireless area on the roadside.

CA 02923677 2016-03-08
24
Reference Signs List
[0072] 1 Management system
2 Dump truck
3 Loading machine
4 Management apparatus
5 Base station
6 Control facility
7 GPS satellite
21 Vehicle main body
22 Vessel
23 Processing unit
23a Identification ID
24 Gyro sensor
25 Speed sensor
26 Load sensor
27a,28a,44a Antenna
27,44 Communication unit
28 GPS apparatus
29 Vehicle wheel
29a Tire
29b Wheel
Suspension cylinder
31 Running control unit
32 Actuator
25 40 Management Unit
41 Operation input unit
42 Display unit
43 Storage unit
50 Work assignment processing unit
30 51,71 Tire load balancing processing unit
52 Operation instruction control unit
53 Monitoring unit
61 Actual tire load calculation unit

CA 02923677 2016-03-08
62,82 Overload vehicle detection unit
63,83 Work contents change processing unit
81 Predicted tire load calculation unit
55 Work assignment DB
5 56 Running route information DB
57 Map DB
R1 to R4 Running route

Representative Drawing
A single figure which represents the drawing illustrating the invention.
Administrative Status

2024-08-01:As part of the Next Generation Patents (NGP) transition, the Canadian Patents Database (CPD) now contains a more detailed Event History, which replicates the Event Log of our new back-office solution.

Please note that "Inactive:" events refers to events no longer in use in our new back-office solution.

For a clearer understanding of the status of the application/patent presented on this page, the site Disclaimer , as well as the definitions for Patent , Event History , Maintenance Fee  and Payment History  should be consulted.

Event History

Description Date
Common Representative Appointed 2019-10-30
Common Representative Appointed 2019-10-30
Maintenance Request Received 2017-09-07
Grant by Issuance 2017-07-11
Inactive: Cover page published 2017-07-10
Inactive: Reply to s.37 Rules - PCT 2017-05-23
Pre-grant 2017-05-23
Inactive: Final fee received 2017-05-23
Notice of Allowance is Issued 2016-11-23
Letter Sent 2016-11-23
4 2016-11-23
Notice of Allowance is Issued 2016-11-23
Inactive: Approved for allowance (AFA) 2016-11-21
Inactive: Q2 passed 2016-11-21
Amendment Received - Voluntary Amendment 2016-07-18
Maintenance Request Received 2016-06-27
Inactive: IPC removed 2016-05-04
Inactive: First IPC assigned 2016-05-04
Inactive: IPC assigned 2016-05-04
Inactive: Cover page published 2016-04-04
Inactive: Acknowledgment of national entry - RFE 2016-03-23
Letter Sent 2016-03-18
Letter Sent 2016-03-18
Inactive: First IPC assigned 2016-03-17
Inactive: IPC assigned 2016-03-17
Application Received - PCT 2016-03-17
National Entry Requirements Determined Compliant 2016-03-08
Request for Examination Requirements Determined Compliant 2016-03-08
All Requirements for Examination Determined Compliant 2016-03-08
Application Published (Open to Public Inspection) 2015-03-26

Abandonment History

There is no abandonment history.

Maintenance Fee

The last payment was received on 2016-06-27

Note : If the full payment has not been received on or before the date indicated, a further fee may be required which may be one of the following

  • the reinstatement fee;
  • the late payment fee; or
  • additional fee to reverse deemed expiry.

Patent fees are adjusted on the 1st of January every year. The amounts above are the current amounts if received by December 31 of the current year.
Please refer to the CIPO Patent Fees web page to see all current fee amounts.

Owners on Record

Note: Records showing the ownership history in alphabetical order.

Current Owners on Record
KOMATSU LTD.
Past Owners on Record
TSUGIO SUDOU
Past Owners that do not appear in the "Owners on Record" listing will appear in other documentation within the application.
Documents

To view selected files, please enter reCAPTCHA code :



To view images, click a link in the Document Description column (Temporarily unavailable). To download the documents, select one or more checkboxes in the first column and then click the "Download Selected in PDF format (Zip Archive)" or the "Download Selected as Single PDF" button.

List of published and non-published patent-specific documents on the CPD .

If you have any difficulty accessing content, you can call the Client Service Centre at 1-866-997-1936 or send them an e-mail at CIPO Client Service Centre.


Document
Description 
Date
(yyyy-mm-dd) 
Number of pages   Size of Image (KB) 
Representative drawing 2017-06-07 1 10
Cover Page 2017-06-07 1 43
Description 2016-03-07 25 1,086
Drawings 2016-03-07 9 173
Claims 2016-03-07 4 153
Representative drawing 2016-03-07 1 22
Abstract 2016-03-07 1 22
Cover Page 2016-04-03 2 43
Description 2016-07-17 25 1,084
Claims 2016-07-17 4 150
Acknowledgement of Request for Examination 2016-03-17 1 176
Notice of National Entry 2016-03-22 1 202
Courtesy - Certificate of registration (related document(s)) 2016-03-17 1 101
Commissioner's Notice - Application Found Allowable 2016-11-22 1 162
Patent cooperation treaty (PCT) 2016-03-07 1 41
International search report 2016-03-07 4 132
National entry request 2016-03-07 5 171
Amendment - Abstract 2016-03-07 1 74
Maintenance fee payment 2016-06-26 1 51
Amendment / response to report 2016-07-17 9 328
Final fee / Response to section 37 2017-05-22 1 56
Maintenance fee payment 2017-09-06 2 49