Language selection

Search

Patent 3047860 Summary

Third-party information liability

Some of the information on this Web page has been provided by external sources. The Government of Canada is not responsible for the accuracy, reliability or currency of the information supplied by external sources. Users wishing to rely upon this information should consult directly with the source of the information. Content provided by external sources is not subject to official languages, privacy and accessibility requirements.

Claims and Abstract availability

Any discrepancies in the text and image of the Claims and Abstract are due to differing posting times. Text of the Claims and Abstract are posted:

  • At the time the application is open to public inspection;
  • At the time of issue of the patent (grant).
(12) Patent: (11) CA 3047860
(54) English Title: COAL PYROLYSIS PROCESS DEVICE
(54) French Title: DISPOSITIF DE PROCEDE DE PYROLYSE DU CHARBON
Status: Granted and Issued
Bibliographic Data
(51) International Patent Classification (IPC):
  • C10B 57/02 (2006.01)
(72) Inventors :
  • ZHU, SHUCHENG (China)
  • WANG, XIBIN (China)
  • CAO, GUOCHAO (China)
  • LI, MINGDE (China)
  • LI, JINFENG (China)
  • LI, FANG (China)
  • LV, YANWU (China)
(73) Owners :
  • HENAN LONGCHENG COAL HIGH EFFICIENCY TECHNOLOGY APPLICATION CO., LTD.
(71) Applicants :
  • HENAN LONGCHENG COAL HIGH EFFICIENCY TECHNOLOGY APPLICATION CO., LTD. (China)
(74) Agent: ROBIC AGENCE PI S.E.C./ROBIC IP AGENCY LP
(74) Associate agent:
(45) Issued: 2021-03-30
(86) PCT Filing Date: 2017-12-07
(87) Open to Public Inspection: 2018-12-06
Examination requested: 2019-06-20
Availability of licence: N/A
Dedicated to the Public: N/A
(25) Language of filing: English

Patent Cooperation Treaty (PCT): Yes
(86) PCT Filing Number: PCT/CN2017/114976
(87) International Publication Number: WO 2018218915
(85) National Entry: 2019-06-20

(30) Application Priority Data:
Application No. Country/Territory Date
201710396454.9 (China) 2017-05-31

Abstracts

English Abstract

A coal pyrolysis process device, comprising a primary coal pyrolysis device (1) and a secondary coal pyrolysis device (2), wherein a discharge port (12) of the primary coal pyrolysis device (1) communicates with a feed port (21) of the secondary coal pyrolysis device (2). When coal is in the primary coal pyrolysis device (1), coal tar is extracted to the maximum extent, and then enters the secondary coal pyrolysis device (2). The coal continues to be heated and undergo pyrolysis at an upper portion of the secondary coal pyrolysis device (2), so that volatile matter of upgraded coal having undergone primary pyrolysis and upgrading are further reduced in the secondary coal pyrolysis device (2), and more gas is produced.


French Abstract

L'invention concerne un dispositif de traitement de pyrolyse du charbon, comprenant un dispositif de pyrolyse du charbon primaire (1) et un dispositif de pyrolyse du charbon secondaire (2), un orifice d'évacuation (12) du dispositif de pyrolyse du charbon primaire (1) communiquant avec un orifice d'alimentation (21) du dispositif de pyrolyse du charbon secondaire (2). Lorsque le charbon est dans le dispositif de pyrolyse du charbon primaire (1), du goudron de houille est extrait au maximum, puis entre dans le dispositif de pyrolyse du charbon secondaire (2). Le charbon continue à être chauffé et subir une pyrolyse au niveau d'une partie supérieure du dispositif de pyrolyse du charbon secondaire (2), de telle sorte que la matière volatile du charbon amélioré ayant subi une pyrolyse primaire et une amélioration soit en outre réduite dans le dispositif de pyrolyse du charbon secondaire (2), et que plus de gaz soit produit.

Claims

Note: Claims are shown in the official language in which they were submitted.


What is claimed is:
1. A coal pyrolysis process device, comprising a primary coal pyrolysis device
and
a secondary coal pyrolysis device, wherein the primary coal pyrolysis device
is
a heating coal decomposition apparatus which is in form of a rotary kiln
radiant
tube;
the primary coal pyrolysis device comprises a primary feed port, a primary
discharge port, a primary coal gas outlet, and a heating mechanism in form of
a
primary radiant tube;
the secondary coal pyrolysis device comprises a secondary feed port, a
secondary discharge port, a secondary coal gas outlet, and a secondary
heating mechanism;
the primary discharge port communicates with the secondary feed port,
coal tar is maximally extracted from coal in the primary coal pyrolysis device
and then the coal is introduced into the secondary coal pyrolysis device, and
the coal continues to be heated up and pyrolyzed at an upper portion of the
secondary coal pyrolysis device, so that volatile matter of upgraded coal
upgraded by a primary pyrolysis is further reduced in the secondary coal
pyrolysis device, and more coal gas is produced; and
the secondary feed port is located at one end of the secondary coal
pyrolysis device connected with the primary discharge port, and the secondary
coal gas outlet is located at the other end of the secondary coal pyrolysis
device opposite to the one end of the secondary coal pyrolysis device
connected with the primary discharge port.
2. The coal pyrolysis process device according to claim 1, wherein the
secondary
coal pyrolysis device is a heating coal decomposition apparatus which is in
form of a rotary kiln radiant tube or a shaft kiln heat exchange coal
decomposition apparatus.
7

3. The coal pyrolysis process device according to claim 1 or 2, wherein the
coal
pyrolysis process device further comprises a coal drying device disposed
upstream of the primary coal pyrolysis device, and dried coal is introduced
into
the primary coal pyrolysis device.
4. The coal pyrolysis process device according to any one of claims 1 to 3,
wherein the coal pyrolysis process device further comprises a deduster
disposed at the primary coal gas outlet and a deduster disposed at the
secondary coal gas outlet, and the deduster is a cyclone deduster or gravity
deduster or a high temperature membrane filter having a filter element coated
with a membrane at its surface.
5. The coal pyrolysis process device according to claim 4, wherein output of
the
primary coal gas outlet and output of the secondary coal gas outlet are mixed
together and enter the high temperature membrane filter.
6. The coal pyrolysis process device according to claim 4 or 5, wherein output
of
the primary coal gas outlet and output of the secondary coal gas outlet are
mixed together, and firstly pass through the cyclone deduster or the gravity
deduster and then enter the high temperature membrane filter.
7. The coal pyrolysis process device according to any one of claims 4 to 6,
wherein the primary coal gas outlet leads to a first membrane filter, and the
secondary coal gas outlet leads to a second membrane filter.
8. The coal pyrolysis process device according to any one of claims 4 to 7,
wherein output of the primary coal gas outlet passes through a first cyclone
deduster or gravity deduster and then enters a first membrane filter, and
output
of the secondary coal gas outlet passes through a second cyclone deduster or
gravity deduster and enters a second membrane filter.
8

Description

Note: Descriptions are shown in the official language in which they were submitted.


CA 03047860 2019-06-20
PO19015921
Coal Pyrolysis Process Device
Technical Field
[0001] The present disclosure relates to the technical field of heat exchange,
and in particular to a coal pyrolysis process device.
Background Art
[0002] Depending on different requirements of final products, coal pyrolysis
apparatuses are greatly different from one another, and also have greatly
different coal tar yields, for example, a coke furnace for making coke and a
semi-coke furnace for producing semi-coke have a great difference in furnace
type. The coke furnace produces coke with a relatively low amount of volatile
matter, has low coal tar yield, but produces a large amount of coal gas,
whereas the semi-coke furnace produces semi-coke with a higher amount of
volatile matter, has relatively high coal tar yield, and produces a slightly
lower
amount of coal gas. With the demand of petroleum strategy, a rotary kiln for
coalite tar with high oil yield has become a new favorite in recent years. A
Chinese Patent with application number 201010262786.6 and publication
number 0N101985558, entitled ''Coal Decomposing Equipment", discloses a
coal decomposing equipment including an airtight kiln body with an coal inlet
and an coal outlet, wherein a flame gas pipeline heating facility is set in
the kiln
body and a channel for impelling and decomposing coal is formed between the
flame gas pipeline heating facility and an inner wall of the kiln body; and a
coal
decomposition gas collecting pipe is provided on the kiln body to communicate
with the channel for impelling and decomposing coal. Since this invention
allows a large amount of heat produced by the flame gas pipeline heating
facility to be conducted and radiated to the pulverized coal in the channel
for
impelling and decomposing coal, the pulverized coal fully absorbs the heat so
as to be heated and decomposed to the fuel gas, tar gas and coal with a higher
heat-value in the channel for impelling and decomposing coal. The fuel gas
and tar gas communicate with a gas dedust and liquefaction facility outside of
the rotary kiln through the coal decomposition gas collecting pipe, and the
decomposed fuel gas and tar gas are dedusted, separated, and pressure
liquefied.
[0003] The above-mentioned patent indeed provides relatively high oil yield,
and is regarded as an example, but only the maximum tar yield is taken into
consideration in this patent, and a relatively large amount of volatile matter
in
the upgraded coal resulting from such pyrolysis at low temperature and the
coal gas amount required by hydrogenation of tar are not taken into
consideration. The above-mentioned patent has its limitations in that it
either
provides a high coal tar yield but low coal gas amount, or provides a high gas
yield but low coal tar yield, but cannot satisfy both requirements.
P019015921

Summary
[0004] In view of this, an object of the present disclosure is to provide a
coal
pyrolysis process device in response to the disadvantages of the prior art,
which
can achieve high-efficient production of both gas and coal tar.
[0005] In order to solve the above technical problem, the following technical
solution is adopted in the present disclosure: a coal pyrolysis process
device,
comprising a primary coal pyrolysis device and a secondary coal pyrolysis
device,
wherein the primary coal pyrolysis device is a coal decomposition apparatus
which
is in form of a rotary kiln radiant tube and of heating type, and the primary
coal
pyrolysis device comprises a primary feed port, a primary discharge port, a
primary
coal gas outlet, and a heating mechanism in form of a primary radiant tube;
the secondary coal pyrolysis device comprises a secondary feed port, a
secondary discharge port, a secondary coal gas outlet, and a secondary heating
mechanism;
the primary discharge port communicates with the secondary feed port, coal tar
is
maximally extracted from coal in the primary coal pyrolysis device and then
the coal
is introduced into the secondary coal pyrolysis device, and the coal continues
to be
heated up and pyrolyzed at an upper portion of the secondary coal pyrolysis
device,
so that volatile matter of the upgraded coal upgraded by the primary pyrolysis
is
further reduced in the secondary coal pyrolysis device, and more coal gas is
produced.
[0005-a]
Another embodiment of the invention relates to a coal pyrolysis
process device, comprising a primary coal pyrolysis device and a secondary
coal
pyrolysis device, wherein the primary coal pyrolysis device is a heating coal
decomposition apparatus which is in form of a rotary kiln radiant tube;
the primary coal pyrolysis device comprises a primary feed port, a primary
discharge port, a primary coal gas outlet, and a heating mechanism in form of
a
primary radiant tube;
2
Date Recue/Date Received 2020-10-29

the secondary coal pyrolysis device comprises a secondary feed port, a
secondary discharge port, a secondary coal gas outlet, and a secondary heating
mechanism;
the primary discharge port communicates with the secondary feed port, coal tar
is maximally extracted from coal in the primary coal pyrolysis device and then
the
coal is introduced into the secondary coal pyrolysis device, and the coal
continues
to be heated up and pyrolyzed at an upper portion of the secondary coal
pyrolysis
device, so that volatile matter of upgraded coal upgraded by a primary
pyrolysis is
further reduced in the secondary coal pyrolysis device, and more coal gas is
produced; and
the secondary feed port is located at one end of the secondary coal pyrolysis
device connected with the primary discharge port, and the secondary coal gas
outlet
is located at the other end of the secondary coal pyrolysis device opposite to
the
one end of the secondary coal pyrolysis device connected with the primary
discharge port.
[0006] The secondary coal pyrolysis device is a heating coal decomposition
apparatus which is in form of a rotary kiln radiant tube or a shaft kiln heat
exchange
coal decomposition apparatus.
[0007] The coal pyrolysis process device further comprises a coal drying
device
disposed upstream of the primary coal pyrolysis device, and the dried coal is
introduced into the primary coal pyrolysis device.
[0008] The coal pyrolysis process device further comprises a deduster disposed
at the primary coal gas outlet and a deduster disposed at the secondary coal
gas
outlet, and the deduster is a cyclone deduster or gravity deduster or a high
temperature membrane filter having a filter element coated with a membrane at
its
surface.
[0009] Output of the primary coal gas outlet and output of the secondary coal
gas
outlet are mixed together and enter the high temperature membrane filter.
2a
Date Recue/Date Received 2020-10-29

[0010] Output of the primary coal gas outlet and Output of the secondary coal
gas
outlet are mixed together, and firstly pass through the cyclone deduster or
gravity
deduster and then enter the high temperature membrane filter.
2b
Date Recue/Date Received 2020-10-29

CA 03047860 2019-06-20
P019015921
[0011] The primary coal gas outlet leads to a first membrane filter, and the
secondary coal gas outlet leads to a second membrane filter.
[0012] Output of the primary coal gas outlet passes through a first cyclone
deduster or gravity deduster and then enters a first membrane filter, and
output
of the secondary coal gas outlet passes through a second cyclone deduster or
gravity deduster and enters a second membrane filter..
[0013] The present disclosure has the advantage that when coal is placed in
the primary coal pyrolysis device, the tar yield reaches the maximum value,
and the primary upgraded coal which still has a relatively high amount of
volatile matter is introduced into the secondary coal pyrolysis device in a
hot
state and continues to be heated up and pyrolyzed, such that upgraded coal
with a lower amount of volatile matter is produced, and at the same time more
coal gas is additionally produced. The coal gas produced by secondary
pyrolysis contains more amount of CO and H2, and CO can be converted into
H2 via coal gas, such that sufficient H2 source can be provided for
hydrogenation of coal tar, and the cost of hydrogenation of coal tar is
effectively reduced.
[0014] The drying device is added to contribute to reduction of energy
consumption in coal pyrolysis; and the filter is added in order to filter out
and
remove dust from coal gas containing dust and containing tar before
separation of oil and gas to ensure the cleanliness of oil and gas so as to
establish a good foundation for subsequent treatments of oil and gas.
Brief Description of Drawings
[0015] FIG. 1 is a schematic structural view of a first embodiment of the
present disclosure;
FIG. 2 is a schematic structural view of a second embodiment of the present
disclosure;
FIG. 3 is a schematic structural view of a third embodiment of the present
disclosure; and
FIG. 4 is a schematic structural view of a fourth embodiment of the present
disclosure.
Detailed Description of Embodiments
[0016] In order to make the objects, technical solutions and advantages of
the embodiments of the present disclosure clearer, the technical solutions of
the embodiments of the present disclosure will be described below clearly and
completely with reference to FIGS. 1-4 of the embodiments of the present
disclosure. It is apparent that the embodiments to be described are some, but
not all of the embodiments of the present disclosure. All the other
embodiments obtained by those of ordinary skill in the art in light of the
3 P019015921

CA 03047860 2019-06-20
P019015921
described embodiments of the present disclosure will fall within the scope of
the present disclosure as claimed.
[0017] First Embodiment: As shown in FIG. 1, a coal pyrolysis process
device comprises a primary coal pyrolysis device 1 and a secondary coal
pyrolysis device 2, wherein the primary coal pyrolysis device 1 is a coal
decomposition apparatus which is in form of a rotary kiln radiant tube and of
heating type, and the primary coal pyrolysis device 1 comprises a primary feed
port 11, a primary discharge port 12, a primary coal gas outlet 13, and a
heating mechanism in form of a primary radiant tube 14;
the secondary coal pyrolysis device 2 comprises a secondary feed port 21, a
secondary discharge port 22, a secondary coal gas outlet 23, and a secondary
heating mechanism 24;
the primary discharge port 12 communicates with the secondary feed port
21, coal tar is maximally extracted from coal in the primary coal pyrolysis
device 1 and then the coal is introduced into the secondary coal pyrolysis
device 2, and the coal continues to be heated up and pyrolyzed at an upper
portion of the secondary coal pyrolysis device 2, so that volatile matter of
the
upgraded coal upgraded by the primary pyrolysis is further reduced in the
secondary coal pyrolysis device 2, and more coal gas is produced.
[0018] The secondary coal pyrolysis device 2 is a coal decomposition
apparatus which is in form of a rotary kiln radiant tube and of heating type.
[0019] The coal pyrolysis process device further comprises a coal drying
device 3 disposed upstream of the primary coal pyrolysis device 1, and the
dried coal is introduced into the primary coal pyrolysis device 1.
[0020] The primary coal gas outlet and the secondary coal gas outlet lead to
a high temperature membrane filter 5.
[0021] Second Embodiment: As shown in FIG. 2, a coal pyrolysis process
device comprises a primary coal pyrolysis device 1 and a secondary coal
pyrolysis device 2, wherein the primary coal pyrolysis device 1 is a coal
decomposition apparatus which is in form of a rotary kiln radiant tube and of
heating type, and the primary coal pyrolysis device 1 comprises a primary feed
port 11, a primary discharge port 12, a primary coal gas outlet 13, and a
heating mechanism in form of a primary radiant tube 14;
the secondary coal pyrolysis device 2 comprises a secondary feed port 21, a
secondary discharge port 22, a secondary coal gas outlet 23, and a secondary
heating mechanism 24;
the primary discharge port 12 communicates with the secondary feed port
21, coal tar is maximally extracted from coal in the primary coal pyrolysis
device 1 and then the coal is introduced into the secondary coal pyrolysis
device 2, and the coal continues to be heated up and pyrolyzed at an upper
4 PO19015921

CA 03047860 2019-06-20
P0190 i 5921
portion of the secondary coal pyrolysis device 2, so that volatile matter of
the
upgraded coal upgraded by the primary pyrolysis is further reduced in the
secondary coal pyrolysis device 2, and more coal gas is produced.
[0022] The secondary coal pyrolysis device 2 is a coal decomposition
apparatus which is in form of a rotary kiln radiant tube and of heating type.
[0023] The coal pyrolysis process device further comprises a coal drying
device 3 disposed upstream of the primary coal pyrolysis device 1, and the
dried coal is introduced into the primary coal pyrolysis device 1.
[0024] The primary coal gas outlet 13 and the secondary coal gas outlet 23
converge through a cyclone deduster or gravity deduster 4 and then into the
high temperature membrane filter 5.
[0025] Third Embodiment: As shown in FIG. 3, a coal pyrolysis process
device comprises a primary coal pyrolysis device 1 and a secondary coal
pyrolysis device 2, wherein the primary coal pyrolysis device 1 is a coal
decomposition apparatus which is in form of a rotary kiln radiant tube and of
heating type, and the primary coal pyrolysis device 1 comprises a primary feed
port 11, a primary discharge port 12, a primary coal gas outlet 13, and a
heating mechanism in form of a primary radiant tube 14;
the secondary coal pyrolysis device 2 comprises a secondary feed port 21, a
secondary discharge port 22, a secondary coal gas outlet 23, and a secondary
heating mechanism 24;
the primary discharge port 12 communicates with the secondary feed port
21, coal tar is maximally extracted from coal in the primary coal pyrolysis
device 1 and then the coal is introduced into the secondary coal pyrolysis
device 2, and the coal continues to be heated up and pyrolyzed at an upper
portion of the secondary coal pyrolysis device 2, so that volatile matter of
the
upgraded coal upgraded by the primary pyrolysis is further reduced in the
secondary coal pyrolysis device 2, and more coal gas is produced.
[0026] The secondary coal pyrolysis device 2 is a coal decomposition
apparatus of a shaft kiln heat exchange type.
[0027] The coal pyrolysis process device further comprises a coal drying
device 3 disposed upstream of the primary coal pyrolysis device 1, and the
dried coal is introduced into the primary coal pyrolysis device 1.
[0028] The primary coal gas outlet 13 leads to a first membrane filter 51, and
the secondary coal gas outlet 23 leads to a second membrane filter 52.
[0029] Fourth Embodiment: As shown in FIG. 4, a coal pyrolysis process
device comprises a primary coal pyrolysis device 1 and a secondary coal
pyrolysis device 2, wherein the primary coal pyrolysis device 1 is a coal
decomposition apparatus which is in form of a rotary kiln radiant tube and of
P019015921

CA 03047860 2019-06-20
PO i9015921
heating type, and the primary coal pyrolysis device 1 comprises a primary feed
port 11, a primary discharge port 12, a primary coal gas outlet 13, and a
heating mechanism in form of a primary radiant tube 14;
the secondary coal pyrolysis device 2 comprises a secondary feed port 21, a
secondary discharge port 22, a secondary coal gas outlet 23, and a secondary
heating mechanism 24;
the primary discharge port 12 communicates with the secondary feed port
21, coal tar is maximally extracted from coal in the primary coal pyrolysis
device 1 and then the coal is introduced into the secondary coal pyrolysis
device 2, and the coal continues to be heated up and pyrolyzed at an upper
portion of the secondary coal pyrolysis device 2, so that volatile matter of
the
upgraded coal upgraded by the primary pyrolysis is further reduced in the
secondary coal pyrolysis device 2, and more coal gas is produced.
[0030] The secondary coal pyrolysis device 2 is a coal decomposition
apparatus of a shaft kiln heat exchange type.
[0031] The coal pyrolysis process device further comprises a coal drying
device 3 disposed upstream of the primary coal pyrolysis device 1, and the
dried coal is introduced into the primary coal pyrolysis device 1.
[0032] The primary coal gas outlet 13 leads to a first membrane filter 51, and
the secondary coal gas outlet 23 leads to a second membrane filter 52.
[0033] Output of the primary coal gas outlet 13 passes through a first
cyclone deduster or gravity deduster 41 and then enters a first membrane
filter
51, and output of the secondary coal gas outlet 23 passes through a second
cyclone deduster or gravity deduster 42 and enters a second membrane filter
52..
[0034] The above description is illustrative of preferred embodiments of the
present disclosure, and it should be noted that several improvements and
modifications can be made by those of ordinary skill in the art without
departing
from the principles described in the present disclosure, and these
improvements and modifications should also be considered to fall within the
scope of protection of the present disclosure.
6 P019015921

Representative Drawing
A single figure which represents the drawing illustrating the invention.
Administrative Status

2024-08-01:As part of the Next Generation Patents (NGP) transition, the Canadian Patents Database (CPD) now contains a more detailed Event History, which replicates the Event Log of our new back-office solution.

Please note that "Inactive:" events refers to events no longer in use in our new back-office solution.

For a clearer understanding of the status of the application/patent presented on this page, the site Disclaimer , as well as the definitions for Patent , Event History , Maintenance Fee  and Payment History  should be consulted.

Event History

Description Date
Grant by Issuance 2021-03-30
Inactive: Cover page published 2021-03-29
Pre-grant 2021-02-11
Inactive: Final fee received 2021-02-11
Notice of Allowance is Issued 2021-01-15
Letter Sent 2021-01-15
Notice of Allowance is Issued 2021-01-15
Inactive: Approved for allowance (AFA) 2021-01-12
Inactive: Q2 passed 2021-01-12
Common Representative Appointed 2020-11-07
Amendment Received - Voluntary Amendment 2020-10-29
Examiner's Report 2020-07-13
Inactive: Report - No QC 2020-07-08
Common Representative Appointed 2019-10-30
Common Representative Appointed 2019-10-30
Inactive: Cover page published 2019-08-01
Inactive: IPC removed 2019-07-29
Inactive: IPC assigned 2019-07-29
Inactive: First IPC assigned 2019-07-29
Inactive: IPC removed 2019-07-29
Inactive: IPC removed 2019-07-29
Amendment Received - Voluntary Amendment 2019-07-26
Inactive: Acknowledgment of national entry - RFE 2019-07-10
Inactive: IPC assigned 2019-07-04
Inactive: IPC assigned 2019-07-04
Inactive: IPC assigned 2019-07-04
Application Received - PCT 2019-07-04
Inactive: First IPC assigned 2019-07-04
Letter Sent 2019-07-04
National Entry Requirements Determined Compliant 2019-06-20
Request for Examination Requirements Determined Compliant 2019-06-20
All Requirements for Examination Determined Compliant 2019-06-20
Application Published (Open to Public Inspection) 2018-12-06

Abandonment History

There is no abandonment history.

Maintenance Fee

The last payment was received on 2020-11-18

Note : If the full payment has not been received on or before the date indicated, a further fee may be required which may be one of the following

  • the reinstatement fee;
  • the late payment fee; or
  • additional fee to reverse deemed expiry.

Please refer to the CIPO Patent Fees web page to see all current fee amounts.

Fee History

Fee Type Anniversary Year Due Date Paid Date
Request for examination - standard 2019-06-20
Basic national fee - standard 2019-06-20
MF (application, 2nd anniv.) - standard 02 2019-12-09 2019-11-15
MF (application, 3rd anniv.) - standard 03 2020-12-07 2020-11-18
Final fee - standard 2021-05-17 2021-02-11
MF (patent, 4th anniv.) - standard 2021-12-07 2021-11-23
MF (patent, 5th anniv.) - standard 2022-12-07 2022-11-24
MF (patent, 6th anniv.) - standard 2023-12-07 2023-11-22
Owners on Record

Note: Records showing the ownership history in alphabetical order.

Current Owners on Record
HENAN LONGCHENG COAL HIGH EFFICIENCY TECHNOLOGY APPLICATION CO., LTD.
Past Owners on Record
FANG LI
GUOCHAO CAO
JINFENG LI
MINGDE LI
SHUCHENG ZHU
XIBIN WANG
YANWU LV
Past Owners that do not appear in the "Owners on Record" listing will appear in other documentation within the application.
Documents

To view selected files, please enter reCAPTCHA code :



To view images, click a link in the Document Description column. To download the documents, select one or more checkboxes in the first column and then click the "Download Selected in PDF format (Zip Archive)" or the "Download Selected as Single PDF" button.

List of published and non-published patent-specific documents on the CPD .

If you have any difficulty accessing content, you can call the Client Service Centre at 1-866-997-1936 or send them an e-mail at CIPO Client Service Centre.


Document
Description 
Date
(yyyy-mm-dd) 
Number of pages   Size of Image (KB) 
Abstract 2019-06-20 2 102
Drawings 2019-06-20 2 29
Description 2019-06-20 6 325
Claims 2019-06-20 2 66
Representative drawing 2019-06-20 1 14
Cover Page 2019-07-17 1 47
Claims 2019-07-26 2 78
Description 2020-10-29 8 380
Claims 2020-10-29 2 87
Drawings 2020-10-29 4 62
Representative drawing 2021-03-03 1 5
Cover Page 2021-03-03 1 39
Acknowledgement of Request for Examination 2019-07-04 1 186
Notice of National Entry 2019-07-10 1 229
Reminder of maintenance fee due 2019-08-08 1 111
Commissioner's Notice - Application Found Allowable 2021-01-15 1 552
Patent cooperation treaty (PCT) 2019-06-20 3 118
National entry request 2019-06-20 3 95
Patent cooperation treaty (PCT) 2019-06-20 2 77
International search report 2019-06-20 4 128
Amendment / response to report 2019-07-26 6 225
Examiner requisition 2020-07-13 3 161
Amendment / response to report 2020-10-29 31 1,101
Final fee 2021-02-11 4 100