Some of the information on this Web page has been provided by external sources. The Government of Canada is not responsible for the accuracy, reliability or currency of the information supplied by external sources. Users wishing to rely upon this information should consult directly with the source of the information. Content provided by external sources is not subject to official languages, privacy and accessibility requirements.

Claims and Abstract availability

Any discrepancies in the text and image of the Claims and Abstract are due to differing posting times. Text of the Claims and Abstract are posted:

  • At the time the application is open to public inspection;
  • At the time of issue of the patent (grant).
(12) Patent: (11) CA 2747119
(54) English Title: SEAL LEAKAGE GAS RECOVERY SYSTEM
(54) French Title: SYSTEME DE RECUPERATION DE GAZ EN CAS DE FUITE AU NIVEAU D'UN JOINT D'ETANCHEITE
Status: Granted
Bibliographic Data
(51) International Patent Classification (IPC):
  • F16J 15/40 (2006.01)
  • F01D 11/06 (2006.01)
  • F04D 29/12 (2006.01)
  • F16J 15/00 (2006.01)
  • F16J 15/34 (2006.01)
(72) Inventors :
  • SEARS, JOHN (Canada)
  • PATTERSON, SHAWN (Canada)
(73) Owners :
  • FLOWSERVE MANAGEMENT COMPANY (United States of America)
(71) Applicants :
  • FLOWSERVE MANAGEMENT COMPANY (United States of America)
(74) Agent: AVENTUM IP LAW LLP
(74) Associate agent:
(45) Issued: 2015-09-01
(86) PCT Filing Date: 2009-12-15
(87) Open to Public Inspection: 2010-07-01
Examination requested: 2014-12-09
Availability of licence: N/A
(25) Language of filing: English

Patent Cooperation Treaty (PCT): Yes
(86) PCT Filing Number: PCT/US2009/006578
(87) International Publication Number: WO2010/074725
(85) National Entry: 2011-06-14

(30) Application Priority Data:
Application No. Country/Territory Date
61/201,777 United States of America 2008-12-15

Abstracts

English Abstract




A dry gas seal leakage recovery system (14)
is provided which collects seal leakage gas from one or
more mechanical seal assemblies (24,25), pressurizing and
controlling the outlet distribution pressure of the collected
seal leakage, and re-injecting the gas back into the compressor
(16) or seal supply system.




French Abstract

L'invention concerne un système de récupération en cas de fuite d'un joint d'étanchéité étanche aux gaz secs, système qui récupère les gaz en cas de fuite au niveau du joint d'étanchéité sur un ou plusieurs ensembles de joints mécaniques, avec mise sous pression et contrôle de la pression de distribution de sortie de la fuite récupérée du joint d'étanchéité, et réinjection du gaz dans le compresseur ou système d'alimentation du joint d'étanchéité.

Claims

Note: Claims are shown in the official language in which they were submitted.


What is claimed is:
1. A seal leakage recovery system for recovering leakage
from at least one unit of rotating equipment having a process fluid
chamber, a rotatable shaft and an operator connected to said shaft
within said process fluid chamber for operating on a process fluid
disposed in said process fluid chamber during rotation of said
shaft, said recovery system comprising:
a housing having a central bore receiving said shaft
therethrough and having opposite inboard and outboard ends wherein
said inboard end is in fluid communication with said process fluid
chamber, said housing having seals along said shaft and comprising
at least first, second and third chambers disposed along said shaft
wherein said third chamber is disposed intermediately between said
first and second chambers;
said first chamber receiving a seal supply fluid into said
first chamber and receiving fluid leakage of said process fluid along
said shaft such that said seal supply fluid includes any said fluid
leakage therein, said seal supply fluid being flowable along said
shaft from said first chamber to said third chamber;
said second chamber receiving a buffer fluid therein which
flows into said second chamber and is flowable along said shaft
to said third chamber which mixes with said seal supply fluid
within said third chamber to define a leakage recovery fluid;
a flow distribution system which supplies said seal supply
fluid to said first chamber, said buffer fluid to said second chamber
and receives said leakage recovery fluid from said third chamber,
said flow distribution system including a pressurizing device
pressurizing said leakage recovery fluid to thereby define said seal
supply fluid which flows from said pressurizing device to said first
chamber as said seal supply fluid, said seal supply fluid at least
comprising said buffer fluid and any of said process fluid leakage
collected from said third chamber.
2. The recovery system according to Claim 1, wherein said
pressurizing device is a compressor.

12

3. The recovery system according to Claim 2, wherein said
flow distribution system comprises a plurality of said
compressors in a lead-lag configuration wherein at least one of
said compressors is operable to pressurize said leakage recovery
fluid for return to said first chamber as said seal supply fluid.
4. The recovery system according to Claim 3, wherein said
flow distribution system comprises an accumulator which receives
said leakage recovery fluid and supplies said leakage recovery fluid
to said compressor.
5. The recovery system according to Claim 4, wherein said
accumulator receives said leakage recovery fluid from a plurality
of said rotating equipment units and said pressurizing device
supplies a plurality of said rotating equipment units with said
seal supply fluid.
6. The recovery system according to Claim 4, wherein said
accumulator receives said leakage recovery fluid from a plurality
of said rotating equipment units and said compressor supplies a
plurality of said rotating equipment units with said seal supply
fluid.
7. The recovery system according to Claim 1, wherein said
buffer fluid is an inert gas.
8. The recovery system according to Claim 1, wherein said
first chamber is disposed on an inboard side of said third chamber
adjacent said process fluid chamber, and said second chamber is
disposed on an outboard side of said third chamber.
9. The recovery system according to Claim 8, wherein said
second chamber has an inboard end and an outboard end, wherein
a separation fluid is supplied to said outboard end wherein
portions of said separation fluid can flow into said second chamber
and outwardly to an environment.

13

10. The recovery system according to Claim 1, wherein said
flow distribution system comprises fluid treatment units which
includes filters for processing said leakage recovery fluid prior
to supply to said first chamber as said seal supply fluid.
11. The recovery system according to Claim 1, wherein said
housing defines a fourth chamber disposed on an outboard side of
said second chamber wherein said fourth chamber receives any said
buffer fluid flowing along said shaft from said second chamber to
said fourth chamber wherein said buffer fluid in said fourth chamber
is vented to an exterior of said recovery system.
12. The recovery system according to Claim 1, wherein said
seal supply gas is pressurized to a supply pressure that is greater
than a process fluid pressure of said process fluid within said
process fluid chamber.
13. A method for recovering seal leakage from at least one
unit of rotating equipment having a process fluid chamber, a shaft
extending into said process fluid chamber, and an operator connected
to said shaft within said process fluid chamber for operating on
a process fluid disposed in said process fluid chamber during
rotation of said shaft, the method comprising the steps of:
providing a seal leakage recovery system comprising a housing
having a central bore receiving said shaft therethrough and having
opposite inboard and outboard ends wherein said inboard end is in
fluid communication with said process fluid chamber, said housing
comprising at least first, second and third chambers disposed along
said shaft wherein said third chamber is disposed intermediately
between said first and second chambers and is separated therefrom
by respective first and second shaft seals;
supplying a seal supply fluid into said first chamber, said
first chamber receiving fluid leakage of said process fluid along
said shafts such that said seal supply fluid includes any said seal
leakage therein, said seal supply fluid being flowable along said
shaft from said first chamber to said third chamber;

14

supplying a buffer fluid into said second chamber which flows
into said second chamber and is flowable along said shaft to said
third chamber which mixes with said seal supply fluid within said
third chamber to define a leakage recovery fluid;
recovering said leakage recovery fluid from said third
chamber which flows through a flow distribution system;
pressurizing said leakage recovery fluid recovered from said
third chamber which thereby defines said seal supply fluid and
flows from said pressurizing device to said first chamber as said
seal supply fluid, said seal supply fluid at least comprising said
buffer fluid and any of said process fluid leakage.
14. The method according to Claim 13, wherein said
pressurizing device is a compressor, the method includes the step
of operating said to pressurize said leakage recovery fluid for
return as said seal supply fluid to said first chamber.
15. The method according to Claim 13, wherein said seal
supply gas is pressurized to a supply pressure that is greater than
a process fluid pressure of said process fluid within said process
fluid chamber.
16. The method according to Claim 13, comprising the steps
of receiving said leakage recovery fluid in an accumulator prior
to said pressurizing device and supplying said leakage recovery
fluid from said accumulator to said pressurizing unit.
17. The method according to Claim 16, wherein said
accumulator receives said leakage recovery fluid from a
plurality of said rotating equipment units and said
pressurizing unit supplies a plurality of said rotating
equipment units with said seal supply fluid.
18. The method according to Claim 13, wherein said first
chamber is disposed on an inboard side of said third chamber adjacent
said process fluid chamber, and said second chamber is disposed on
an outboard side of said third chamber.


Description

Note: Descriptions are shown in the official language in which they were submitted.


CA 02747119 2011-06-14
WO 2010/074725 PCT/US2009/006578
SEAL LEAKAGE GAS RECOVERY SYSTEM
FIELD OF THE INVENTION
[0001] The invention relates to a recovery system for dry
gas seals and more particularly, to assist in recovering
sealed leakage gas from a mechanical seal assembly used for
sealing a rotating shaft of rotating equipment such as
compressors.
BACKGROUND OF THE INVENTION
[0002] Rotating equipment such as compressors include a
motor-driven shaft that drives a rotatable component such as
an impeller for pumping a fluid such as a gas or other type of
processed fluid. Such mechanical seals typically include
opposed pairs of relatively rotatable seal rings which are
supported in a seal housing and are mounted in surrounding
relation to the equipment shaft. One seal ring remains
stationary while the other seal ring is fixedly mounted on the
shaft so as to rotate therein wherein the seal rings are
relatively rotatable and have opposed interfacing seal faces
which define a sealing region that prevent or greatly
minimizes the leakage of process fluid across the sealing
region.
[0003] Mechanical seals can be provided in various
combinations including double and tandem configurations. In
dry gas mechanical seals of this type, a buffer fluid can be
provided outboard of the seal rings, and additionally a seal
supply gas can be supplied to the region adjacent the seal
faces. During shaft rotation, a thin fluid film forms between
the seal faces to separate the seal faces and provide dry gas,
non-contacting operation of the mechanical seal.
[0004] In various mechanical seal configurations, the
separation of the seal faces may allow for a process fluid
located adjacent the seal rings to leak past the seal
interface. However, discharge of such process fluid into the
atmosphere is highly undesirable, and therefore, the invention
relates to a recovery system for recovering any leakage across
1

CA 02747119 2014-12-09
the seal rings to thereby prevent seal leakage from leaking to
the ambient environment.
[0004.1] According to one aspect of the present invention,
there is provided a seal leakage recovery system for recovering
leakage from at least one unit of rotating equipment having a
process fluid chamber, a rotatable shaft and an operator
connected to said shaft within said process fluid chamber for
operating on a process fluid disposed in said process fluid
chamber during rotation of said shaft, said recovery system
comprising:
a housing having a central bore receiving said shaft
= therethrough and having opposite inboard and outboard ends
wherein said inboard end is in fluid communication with said
process fluid chamber, said housing having seals along said
shaft and comprising at least first, second and third chambers
disposed along said shaft wherein said third chamber is disposed
intermediately between said first and second chambers;
said first chamber receiving a seal supply fluid into said
first chamber and receiving fluid leakage of said process fluid
along said shaft such that said seal supply fluid includes any
said fluid leakage therein, said seal supply fluid being
flowable along said shaft from said first chamber to said third
chamber;
said second chamber receiving a buffer fluid therein which
flows into said second chamber and is flowable along said shaft
to said third chamber which mixes with said seal supply fluid
within said third chamber to define a leakage recovery fluid;
a flow distribution system which supplies said seal supply
fluid to said first chamber, said buffer fluid to said second
chamber and receives said leakage recovery fluid from said third
chamber, said flow distribution system including a pressurizing
2

CA 02747119 2014-12-09
device pressurizing said leakage recovery fluid to thereby
define said seal supply fluid which flows from said pressurizing
device to said first chamber as said seal supply fluid, said seal
supply fluid at least comprising said buffer fluid and any of
said process fluid leakage collected from said third chamber.
[0004.2]
According to another aspect of the present invention,
there is provided a method for recovering seal leakage from at
least one unit of rotating equipment having a process fluid
chamber, a shaft extending into said process fluid chamber, and
an operator connected to said shaft within said process fluid
chamber for operating on a process fluid disposed in said process
fluid chamber during rotation of said shaft, the method
comprising the steps of:
providing a seal leakage recovery system comprising a
housing having a central bore receiving said shaft therethrough
and having opposite inboard and outboard ends wherein said
inboard end is in fluid communication with said process fluid
chamber, said housing comprising at least first, second and third
chambers disposed along said shaft wherein said third chamber
is disposed intermediately between said first and second
chambers and is separated therefrom by respective first and
second shaft seals;
supplying a seal supply fluid into said first chamber,
said first chamber receiving fluid leakage of said process fluid
along said shafts such that said seal supply fluid includes any
said seal leakage therein, said seal supply fluid being flowable
along said shaft from said first chamber to said third chamber;
supplying a buffer fluid into said second chamber which
flows into said second chamber and is flowable along said shaft
to said third chamber which mixes with said seal supply fluid
within said third chamber to define a leakage recovery fluid;
2a

CA 02747119 2014-12-09
recovering said leakage recovery fluid from said third
chamber which flows through a flow distribution system;
pressurizing said leakage recovery fluid recovered from
said third chamber which thereby defines said seal supply fluid
and flows from said pressurizing device to said first chamber
as said seal supply fluid, said seal supply fluid at least
comprising said buffer fluid and any of said process fluid
leakage.
[0005] In particular, the invention relates to a leakage
recovery system which collects any seal leakage gas from one or
more dry gas seals in a recovery system, pressurizes such seal
= leakage, and returns the seal leakage to the compressor system
at a point in the compressor system wherein the seal leakage can
be used as a supply gas provided adjacent the inboard process side
of the mechanical seal rings or alternatively, provided to the
suction side of the compressor.
[0006] Other objects and purposes of the invention, and
variations thereof, will be apparent upon reading the following
specification and inspecting the accompanying drawings.
BRIEF DESCRIPTION OF DRAWINGS
[0007] Figure 1 is a diagram of a compressor system.
[0008] Figure 2 is a first diagram of the control panel for
the compressor system.
[0009] Figure 3 is an additional diagram of the control panel
of Figure 2.
[0010] Figure 4 is a first diagram of a compressor recovery
system for the compressor system.
[0011] Figure 5 is a second diagram of the recovery system of
Figure 4.
2b

CA 02747119 2014-12-09
[0012] Figure 6 is a-legend showing the symbols used in the
foregoing diagrams.
[0013] Certain terminology will be used in the following
description for convenience and reference only, and will not be
limiting. For example, the words "upwardly", "downwardly",
"rightwardly" and "leftwardly" will refer to directions in the
drawings to which reference is made. The words "inwardly" and
"outwardly" will refer to directions toward and away from,
respectively, the geometric center of the arrangement and
designated parts thereof. Said terminology will include the
2c

CA 02747119 2011-06-14
WO 2010/074725
PCT/US2009/006578
.vords specifically mentioned, derivatives thereof, and words
of similar import.
DETAILED DESCRIPTION
[0014] ' Referring to Figure 1, a compressor system 10 is
illustrated which is configured for connection to a dry gas
seal control panel 12 illustrated in Figures 2 and 3, and a
dry gas seal leakage recovery system 14 illustrated in Figures
4 and 5. While the diagrams of Figures 1-5 illustrate in
detail the sensors, valves and piping of such systems, the
invention relates more generally to the interconnection of
these components for recovering dry gas seal leakage and re-
injecting same into the compressor system 10. Figure 6 is
included as a legend for the various symbols used in the
diagrams of Figures 1-5.
[0015] Referring to Figure 1, the compressor system 10 is
illustrated as an exemplary embodiment for use with the
recovery system 14, although it will be understood that the
recovery system 14 is suitable for use with other compressor
and pumping systems and with a variety of mechanical seals and
mechanical seal configurations.
[0016] The compressor system 10 comprises a compressor 16
having a process fluid chamber 17 through which extends a
rotatable drive shaft 18 having a drive end 19 that is driven
by a motor, and a non-drive end 20. The shaft 18 mounts
thereon impellers 21 which rotate in unison with shaft 18 to
pressurize and displace the process fluid such as a process
gas that is received in the process fluid chamber 17 through a
compressor inlet and discharged therefrom through a compressor
outlet. The construction of the compressor 16 is generally
conventional such that specific illustration of the inlet and
outlet is not required. It will be understood that the
recovery system 14 is not limited or restricted to use with
compressors and is readily adaptable to a variety of equipment
having mechanical seals therein.
3

CA 02747119 2011-06-14
WO 2010/074725
PCT/US2009/006578
[0017] The compressor unit 16 further comprises a housing
23 wherein the opposite drive and non-drive ends of the
housing 23 each mount therein a pair of mechanical seal
assemblies 24 and 25. In particular, these mechanical seals
24 and 25 respectively define inboard and outboard seals 24
and 25.
[0018] On the inboard process fluid side of the mechanical
seal 24, a seal supply chamber 26 is defined having a supply
gas inlet 27 through which a supply gas will be supplied as
described further hereinafter. Between each respective pair
of seals 24 and 25, a buffer fluid chamber 29 is defined that
is formed in inboard and outboard sections which are separated
by a divider wall but are still in communication with each
other by a flow-restricting labyrinth 31.
[0019] It is noted that the buffer fluid chamber 29 further
includes an inlet 32A through which a buffer fluid is injected
or supplied as will be described further below. The inboard
section of the buffer fluid chamber 29 includes an outlet port
30 to allow for egress or discharge of dry gas seal leakage
which may leak into such chamber section.
[0020] On the outboard end of the housing 23, a separation
seal supply inlet 32B is provided which also supplies an inert
gas to the shaft surface to further separate the outboard
seals 25 from atmosphere. An outboard chamber 33 is defined
at this end which includes an outlet 34.
[0021] The compressor unit 16 is connected to various gas
supply lines and discharge lines as will be described further.
[0022] As to the gas supply, the illustrated embodiment
preferably is provided with a buffer fluid defined by a
nitrogen gas, although it will be understood that other
fluids, preferably gases, may be provided. In particular, the
buffer fluid gas is first provided through separation seal
supply lines 36 and 37 which respectively connect to the
inlets 32B at the drive end (DE) and non-drive end (NDE).
These lines 36 and 37 supply the nitrogen gas at the outboard
end of the compressor unit 16.
4

CA 02747119 2011-06-14
WO 2010/074725 PCT/US2009/006578
[0023] Further, the nitrogen gas also is supplied as an
interstage seal supply which flows through supply lines 38 and
39. The supply lines 38 and 39 connect to the buffer fluid
inlets 32A and supply the nitrogen gas to the barrier fluid
chambers 29 which fluid is able to flow from the outboard
chamber sections through the intermediate labyrinths 31 to the
inboard chamber sections 29. As such, any barrier fluid
reaching this inboard chamber section may then discharge or
flow therefrom through the outlet 30.
[0024] Also, a supply gas is fed to the supply gas chambers
26 through the inlets 27. This supply gas preferably differs
from the buffer fluid in the illustrated embodiment, since it
is fed with process fluid collected from the compressor unit
16 or its associated piping, for example, from the discharge
side of the compressor or even at an intermediate location in
the compressor system. This pressurized supply gas preferably
is provided at a pressure which is slightly higher than the
process fluid pressure generated in the process fluid chamber
17. Due to the inherent operation of the inboard mechanical
seals 24 which results in slight separation of the seal faces,
the supply gas provided through the supply lines 40 and 41 and
the respective inlets 27 may leak past the inboard mechanical
seals 24 into the inboard chamber section of the buffer fluid
chamber 29. Any such dry gas seal leakage, however, is able
to exit therefrom through the outlet ports 30 for subsequent
collection by the recovery system 14 described below.
[0025] It is understood that the compressor unit 16 in the
illustrated embodiment is a tandem-L mechanical seal
configuration and that other seal configurations may be
provided for use with the recovery system 14 of the invention.
[0026] In the illustrated compressor unit 16, the buffer
fluid may flow to the outlet 30, wherein a substantial portion
of the buffer fluid that is provided to the buffer fluid
chamber 29 is able to flow to this outlet 30. Additionally,
leakage may occur through the mechanical seals 24, which
leakage may be process fluid itself or the supply gas as

CA 02747119 2011-06-14
WO 2010/074725 PCT/US2009/006578
provided through the supply lines 40 and 41. As such, the gas
exiting through the outlet 30 typically contains a certain
level of such process fluid and supply gas in combination with
buffer fluid. In some seal configurations, a substantial
portion of the fluid exiting the outlets 30 will be such
process fluid or supply gas. As such, the discharged leakage
cannot be directly vented to atmosphere since such would be a
contaminant. Therefore, the leakage fluid exiting through the
ports 30 flows downstream through the discharge lines 43 and
44, which lines may also be configured for venting to
emergency flare.
[0027] Additionally, the outlets 34 may contain an inert
separation seal gas therein and are not contaminated, such
that the outlets 34 can be connected to discharge lines 46 and
47 and vented to atmosphere.
[0028] As to Figure 2, Figure 2 illustrates the piping
system for supplying the barrier fluid gas, i.e. nitrogen gas,
to the supply lines 36, 37, 38 and 39. This gas is provided
from a source 50 wherein the gas is piped through various
monitoring and control components including a filter 51.
[0029] Further, the supply gas is provided to the supply
lines 40 and 41 through the supply gas system 52, which system
includes a dry gas seal filter 54. This filter 54 removes
debris and/or moisture from the gas being supplied thereto.
The supply gas is provided through inlet line 55 which
receives compressor gas from the compressor unit 16.
Additionally, a second inlet line 56 is provided upstream of
the filter 54, which inlet line 56 receives recovered gas from
the recovery system 14 described below for re-injection into
the compressor system.
[0030] Referring to Figure 3, the non-drive end leakage
exits the compressor unit 16 and flows through the discharge
line 43, while the drive end leakage flows through the line
44. The collected leakage flows through the lines 43 and 44
and is then provided to the control panel 12. As this leakage
flows through control panel lines 58 and 59 seen in Figure 3,
6

CA 02747119 2011-06-14
WO 2010/074725 PCT/US2009/006578
such lines 58 and 59 in turn are configured for connection to
the recovery system 14 illustrated in Figures 4 and 5.
[0031] Turning to Figure 4, these leakage lines 58 and 59
form two inlet sources for the recovery system 14. It is
noted that the recovery system 14 also may connect to
additional leakage lines 60-63 which correspond to four
additional seals, for example, provided on the drive end (DE)
or non-drive end (NDE) of additional compressors. Hence, the
recovery system 14 may connect to one to six dry gas seals
through one to six leakage lines 58-63, although any number of
additional leakage lines may be accommodated by suitable
sizing of the system components.
[0032] Referring more particularly to the recovery system
14, such recovery system includes a first accumulator or
receiver 65 and a second accumulator or receiver 66 located
downstream therefrom. Between the receiver 65 and 66, a pair
of compressor units 68 and 69 are provided to pump and
pressurize the leakage collected in the receiver or
accumulator 65 and pass such fluid to the receiver or
accumulator 66.
[0033] More particularly, the leakage lines 58-63 connect
to respective leakage inlet lines 71-76 which pass through
respective control valves 77. The valves 77 are preferably
set at 200 kPag wherein the seal leakage then flows downstream
from such valves 77 to the collection accumulator or receiver
65. The receiver 65 is sized to have a suitable volume
capacity depending upon the number of leakage lines and flow
rate being received therein. Further, this 50-gallon receiver
includes an emergency flare system 79 connected thereto as
well as a liquid drain system 80.
[0034] The pressure in the receiver 65 is monitored by a
pressure sensor 82, while the safety vent 79 is controlled by
connection 83 which in turn connects to a PLC 84 that allows
for programmable control of the recovery system 14. The PLC
84 can monitor the pressure sensor 82 and affect an emergency
release if necessary.
7

CA 02747119 2011-06-14
WO 2010/074725 PCT/US2009/006578
[0035] The leakage gas found in the receiver 65 then is
piped to each of the compressor units 68 and 69, which units
each comprise a compressor 85, motor 86, control panel 87
controlled by the PLC 84, inlet 88 which receives fluid from
the receiver 65, outlet 89 which discharges pressurized fluid
to a cooler 90, wherein the pressurized fluid in turn flows
into the downstream receiver 66. This receiver 66 includes a
respective pressure sensor 91 which connects to the PLC 84 and
allows monitoring for suitable pressurization of the leakage
fluid.
[0036] With these components, the dry gas seal leakage is
piped through the lines 58-63 and 71-76 so as to have a
controlled setback pressure that can vary from 0.5 to 3 bar
pressure depending upon the application. The flow of the seal
leakage gases are collected in the accumulator tank 65 wherein
the receiver pressure at sensor 82 is fed to the local mounted
PLC 84 that will be used to govern the on/off control of the
compressors 85 that are used to re-pressurize the recovered
dry seal leakage gas to a pressure up to 250 bar depending
upon application.
[0037] The compressors 85 are standard industry electric
motor-driven compressors used for low-flow/high pressure ratio
applications. The compression system also includes the
coolers 90 that maintain discharge temperatures to meet
specific application requirements and are sized per system
design. The discharge from the compressors 85 is then
collected in the receiver 66 that also acts as a pulsation
dampener and also drains off any liquids formed in the gas
through the liquid collection line 92 that flows to the drain
80 mentioned above.
[0038] Preferably, the compressors 85 are operated as
lead/lag compressors wherein typically, only one compressor is
required to be operated for most operational pressures and
fluid flows. The on/off operation of the compressors 85 is
controlled by the PLC 84, although the PLC logic may be
modified as desired. Typically, a lead compressor 85 will be
8

CA 02747119 2011-06-14
WO 2010/074725
PCT/US2009/006578
operated and if there is a failure of such compressor or if
the compressor is not able to handle the leakage flow, the lag
compressor may in turn be operated. Normally one compressor
85 would be operated, although there may be an upset condition
of the seal which requires operation of both compressors 85.
It may even be desirable to alternate operation of the
compressors 85 whereby the lead or lag role of the compressor
is alternated. For example, a lead compressor may require
servicing wherein the second compressor 85 would then be made
the lead compressor and the former compressor could be
serviced and maintained as a lag compressor for a period of
time. Also, two compressors 85 are illustrated but it will be
understood that multiple compressors may be provided wherein
one compressor is a lead compressor and one or more lag
compressors are then provided as lagl and lag2 compressors.
[0039] Figure 4 includes a listing of the on/off logic for
the compressors based upon the pressure sensed at pressure
sensors 82 and 91. In this regard, the first compressor 85
could be turned on when the pressure at sensor 82 exceeds 1800
kPag and if the pressure exceeds 1900 kPag, the other lag
compressor 85 could then be turned on. Further, the lag and
lead compressors may be turned off depending upon the
compressor shut-off logic wherein, for example, the lead
compressor may be turned off when the pressure at sensor 82
drops below 500 kPag. Further, all operation of the
compressors 85 may be shut off in an emergency situation
should the sensor 91 detect a pressure which is 1000 kPag
greater than the regulated downstream injection pressure
described below.
[0040] Referring to Figure 5, the pressurized accumulator
66 has an outlet 96 that discharges to a discharge line 97
that passes through a control valve 98. The control valve 98
is set at 6000 kPag in the particular application illustrated
and connects to a pressure sensor 99 that monitors the
regulated injection pressure. Hence, emergency shut-off may
occur when the pressure at receiver sensor 91 exceeds the
9

CA 02747119 2011-06-14
WO 2010/074725
PCT/US2009/006578
pressure at sensor 99 by 1000 kPag or some other emergency
pressure differential which would prevent over pressure of the
system.
[0041] An emergency vent unit 100 is piped in to allow for
emergency flare of pressurized gases in an emergency
situation.
[0042] In non-emergency situations, the injection gas flows
through either of two downstream discharge pipes 101 or 102
which connect to the aforementioned piping connection 56
(Figure 2) or alternatively to a compressor connection 103
provided on the suction side of the compressor unit 16.
[0043] Hence, the output of the system can be controlled by
the control valve or regulator 98 so as to be at 10 BARG to
250 BARG depending upon the system application. During normal
operation, the leakage gas is then re-injected upstream of the
dry seal control system supply filters through re-injection
line 56 which is located upstream of the filter 54.
Alternatively or in combination therewith, re-injection of the
gas can be to the suction or discharge sides of the compressor
unit 16 through re-injection line 102.
[0044] This system is designed for continuous operation and
may be readily installed on existing compressor systems with a
minimal amount of reconfiguration of the compressor unit 16 or
the control panel 12. The lead and lag compressors 85 can be
intermittently operated as needed and also can be readily
serviced while the system remains online due to the ability to
operate the system based solely upon one compressor 85 while
the second compressor 85 is taken down for service.
[0045] The seal leakage recovery system 14 is made part of
the dry seal control system and is capable of re-injecting all
greenhouse gas emissions or leakage from the dry gas seals
during normal operation. Servicing and maintenance of the
compressors 85 can be done by isolating a compressor 85 and
continuing operation of the system while the first compressor
is serviced. Further, low point drains can be made manual or
auto depending upon system needs.

CA 02747119 2011-06-14
WO 2010/074725
PCT/US2009/006578
[0046] Although a particular preferred embodiment of the
invention have been disclosed in detail for illustrative
purposes, it will be recognized that variations or
modifications of the disclosed apparatus, including the
rearrangement of parts, lie within the scope of the present
invention.
11

Representative Drawing
A single figure which represents the drawing illustrating the invention.
Administrative Status

For a clearer understanding of the status of the application/patent presented on this page, the site Disclaimer , as well as the definitions for Patent , Administrative Status , Maintenance Fee  and Payment History  should be consulted.

Administrative Status

Title Date
Forecasted Issue Date 2015-09-01
(86) PCT Filing Date 2009-12-15
(87) PCT Publication Date 2010-07-01
(85) National Entry 2011-06-14
Examination Requested 2014-12-09
(45) Issued 2015-09-01

Abandonment History

There is no abandonment history.

Maintenance Fee

Last Payment of $263.14 was received on 2023-12-08


 Upcoming maintenance fee amounts

Description Date Amount
Next Payment if standard fee 2024-12-16 $624.00
Next Payment if small entity fee 2024-12-16 $253.00

Note : If the full payment has not been received on or before the date indicated, a further fee may be required which may be one of the following

  • the reinstatement fee;
  • the late payment fee; or
  • additional fee to reverse deemed expiry.

Patent fees are adjusted on the 1st of January every year. The amounts above are the current amounts if received by December 31 of the current year.
Please refer to the CIPO Patent Fees web page to see all current fee amounts.

Payment History

Fee Type Anniversary Year Due Date Amount Paid Paid Date
Application Fee $400.00 2011-06-14
Maintenance Fee - Application - New Act 2 2011-12-15 $100.00 2011-09-28
Registration of a document - section 124 $100.00 2011-11-24
Maintenance Fee - Application - New Act 3 2012-12-17 $100.00 2012-11-21
Maintenance Fee - Application - New Act 4 2013-12-16 $100.00 2013-11-20
Maintenance Fee - Application - New Act 5 2014-12-15 $200.00 2014-11-19
Request for Examination $800.00 2014-12-09
Final Fee $300.00 2015-06-09
Maintenance Fee - Patent - New Act 6 2015-12-15 $200.00 2015-12-14
Maintenance Fee - Patent - New Act 7 2016-12-15 $200.00 2016-12-13
Maintenance Fee - Patent - New Act 8 2017-12-15 $200.00 2017-12-11
Maintenance Fee - Patent - New Act 9 2018-12-17 $200.00 2018-12-10
Maintenance Fee - Patent - New Act 10 2019-12-16 $250.00 2019-12-06
Maintenance Fee - Patent - New Act 11 2020-12-15 $250.00 2020-12-11
Maintenance Fee - Patent - New Act 12 2021-12-15 $255.00 2021-12-10
Maintenance Fee - Patent - New Act 13 2022-12-15 $254.49 2022-12-09
Maintenance Fee - Patent - New Act 14 2023-12-15 $263.14 2023-12-08
Owners on Record

Note: Records showing the ownership history in alphabetical order.

Current Owners on Record
FLOWSERVE MANAGEMENT COMPANY
Past Owners on Record
None
Past Owners that do not appear in the "Owners on Record" listing will appear in other documentation within the application.
Documents

To view selected files, please enter reCAPTCHA code :



To view images, click a link in the Document Description column. To download the documents, select one or more checkboxes in the first column and then click the "Download Selected in PDF format (Zip Archive)" or the "Download Selected as Single PDF" button.

List of published and non-published patent-specific documents on the CPD .

If you have any difficulty accessing content, you can call the Client Service Centre at 1-866-997-1936 or send them an e-mail at CIPO Client Service Centre.


Document
Description 
Date
(yyyy-mm-dd) 
Number of pages   Size of Image (KB) 
Abstract 2011-06-14 2 71
Claims 2011-06-14 5 193
Drawings 2011-06-14 8 164
Description 2011-06-14 11 499
Representative Drawing 2011-08-11 1 11
Abstract 2011-08-23 2 71
Cover Page 2011-08-23 1 41
Description 2014-12-09 14 598
Claims 2014-12-09 4 178
Representative Drawing 2015-07-29 1 10
Cover Page 2015-07-29 1 39
PCT 2011-06-14 8 286
Assignment 2011-06-14 4 118
Assignment 2011-11-24 4 154
Correspondence 2011-11-24 2 48
Prosecution-Amendment 2014-12-09 1 45
Prosecution-Amendment 2014-12-09 14 563
Final Fee 2015-06-09 2 67