Language selection

Search

Patent 2964803 Summary

Third-party information liability

Some of the information on this Web page has been provided by external sources. The Government of Canada is not responsible for the accuracy, reliability or currency of the information supplied by external sources. Users wishing to rely upon this information should consult directly with the source of the information. Content provided by external sources is not subject to official languages, privacy and accessibility requirements.

Claims and Abstract availability

Any discrepancies in the text and image of the Claims and Abstract are due to differing posting times. Text of the Claims and Abstract are posted:

  • At the time the application is open to public inspection;
  • At the time of issue of the patent (grant).
(12) Patent: (11) CA 2964803
(54) English Title: A METHOD FOR MEASURING AND DISPLAYING THE TRACK GEOMETRY OF A TRACK SYSTEM
(54) French Title: PROCEDE PERMETTANT DE MESURER ET DE REPRESENTER LA GEOMETRIE DES RAILS D'UNE VOIE FERREE
Status: Granted
Bibliographic Data
(51) International Patent Classification (IPC):
  • B61L 23/04 (2006.01)
  • B61K 9/08 (2006.01)
  • E01B 35/06 (2006.01)
  • E01B 35/08 (2006.01)
  • E01B 35/10 (2006.01)
  • E01B 27/17 (2006.01)
(72) Inventors :
  • LICHTBERGER, BERNHARD (Austria)
(73) Owners :
  • HP3 REAL GMBH (Austria)
(71) Applicants :
  • HP3 REAL GMBH (Austria)
(74) Agent: SMART & BIGGAR LP
(74) Associate agent:
(45) Issued: 2020-07-28
(86) PCT Filing Date: 2015-10-19
(87) Open to Public Inspection: 2016-04-28
Examination requested: 2020-03-24
Availability of licence: N/A
(25) Language of filing: English

Patent Cooperation Treaty (PCT): Yes
(86) PCT Filing Number: PCT/AT2015/050261
(87) International Publication Number: WO2016/061602
(85) National Entry: 2017-04-18

(30) Application Priority Data:
Application No. Country/Territory Date
A50758/2014 Austria 2014-10-22

Abstracts

English Abstract

The invention relates to a method for measuring and displaying the track geometry of a track system by means of a track-drivable superstructure machine having a control measurement system for measuring the track position to be corrected before a lifting/lining device, an acceptance measurement system for measuring the corrected track position after the lifting/lining device, and associated output units for displaying the measured values. The lifting/lining device is controlled in accordance with the measured values of the control measurement system and of the acceptance measurement system for the purpose of achieving a specified track target geometry. In order to create advantageous lining conditions, according to the invention, first a three-dimensional position image (figures 6, 7) is calculated from the curvature image (k(s), 2), the longitudinal height image (h (s), 4), and the crosslevel image (u (s), 3) of the track target geometry, the three dimensional position image (19) is put into a perspective display and is displayed by means of the output unit, and the measured error curves for the track parameters of track direction (39), crosslevel (23), twist (49), and longitudinal height (20) are added to the perspective position image.


French Abstract

L'invention concerne un procédé permettant de mesurer et de représenter la géométrie des rails d'une voie ferrée au moyen d'une machine de superstructure ferroviaire munie d'un système de mesure de commande permettant de mesurer la position des rails à corriger en amont d'un dispositif de levage et d'alignement, et un système de mesure de saisie permettant de relever la position corrigée des rails en aval du dispositif de levage et d'alignement, et des unités de sortie associées permettant la représentation des valeurs mesurées. Le dispositif de levage et d'alignement est commandé en fonction des valeurs mesurées du système de mesure de commande et du système de mesure de saisie en vue d'obtenir une géométrie des rails théorique prescrite. L'invention vise à créer des conditions avantageuses d'alignement. À cet effet, on calcule à partir de l'image de la courbure (k(s), 2), de l'image de la hauteur longitudinale (h (s), 4) et de l'image du dévers (u (s), 3) de la géométrie théorique des rails une image de position en trois dimensions (figures 6, 7), l'image de position en trois dimensions (19) est mise en représentation en perspective et est représentée au moyen de l'unité de sortie, et l'image de position en perspective est complétée par les profils de défaut mesurés pour les paramètres alignement des rails (39), dévers (23), gauchissement (49) et hauteur longitudinale (20).

Claims

Note: Claims are shown in the official language in which they were submitted.


14
CLAIMS:
1. A method for measuring and displaying the track geometry of a track
system
using a track-driveable permanent-way machine having a control measurement
system measuring a value of the track position to be corrected before a
lifting
and lining device, an acceptance measurement system measuring a value of
the corrected track position after the lifting and lining device, and an
associated
output unit having a display that is visible to a user displaying the measured

values, said method comprising:
controlling the lifting and lining device depending on the measured
values of the control measurement system and the acceptance measurement
system so as to achieve a predetermined target track geometry including a
curvature image, a longitudinal level image and a superelevation image;
first calculating a three-dimensional position image from the curvature
image, longitudinal level image and superelevation image of the target track
geometry, putting the three-dimensional position image into a perspective
display so as to form a perspective position image, and
displaying the perspective position image using the output unit, and
supplementing the perspective position image by measured error
curves for track parameters including track direction, superelevation, twist,
and
longitudinal level.
2. A method according to claim 1, and further comprising assigning
synchronization points to the target track geometry, and displaying said
synchronization points at respective positions of the perspective display of
the
track progression, wherein once the permanent-way machine reaches the
synchronization points a synchronization of actual synchronization points on
the
track system is carried out with virtual synchronization points of the
perspective
display.

15
3. A method according to claim 1, wherein the track position of the
permanent-way
machine and current error values are displayed continuously in the display of
the output unit with continued travel of the machine.
4. A method according to claim 1, wherein a progression of residual errors
is
precalculated based on the measured error curves and performed control
interventions and is displayed on a display of the output unit.
5. A method according to claim 1, wherein the track position before the
permanent-way machine is recorded with an image recording device, a position
of the rails is calculated with image evaluation, and the calculated position
of the
rails and the target track geometry are displayed in perspective in the
perspective position image.
6. A method according to claim 1, and further comprising recording
synchronization points before the permanent-way machine with an image
recording device and inserting said synchronization points into the
perspective
image from a preselectable approach for synchronization.
7. A method according to claim 1, wherein a progression of deviations of
the track
position from the target position to be corrected is calculated, that trends
are
calculated and are displayed on the output unit so as to ensure the adherence
to tolerances by taking timely action on the lifting and lining devices.
8. A method according to claim 1, wherein corrections of calculated
deviations of
the track position to be corrected from the target position before the lifting
and
lining device are carried out by a control system of the lifting and lining
device.
9. A method according to claim 1, wherein the perspective position image is

projected via a head-up projector onto a front windscreen of the permanent-way

machine or displayed using data goggles.

16
10. A method according to claim 1, wherein the perspective position image is
transmitted via a radio data line to a control center spatially remote from an

operating location of the permanent-way machine that monitors progress of the
method.
11. A method according to claim 10, wherein the control center remotely
controls
the method.

Description

Note: Descriptions are shown in the official language in which they were submitted.


CA 02964803 2017-04-18
A method for measuring and displaying the track geometry of a track system
Field of the invention
The invention relates to a method for measuring and displaying the track
geometry of a
track system by means of a track-driveable permanent-way machine having a
control
measurement system for measuring the track position to be corrected before a
lifting and
lining device, an acceptance measurement system for measuring the corrected
track
position after the lifting and lining device, and associated output units for
displaying the
measured values, wherein the lifting and lining device is controlled depending
on the
measured values of the control measurement system and the acceptance
measurement
system for the purpose of achieving a specified target track geometry, which
is
predetermined especially in form of a curvature image, longitudinal level
image and
superelevation image.
Description of the prior art
Most tracks for railways are arranged as ballasted tracks. The sleepers lie in
the ballast.
The ballast is provided for dissipating the wheel forces into the subgrade,
the absorption of
transverse forces acting on the rail and the sleepers, and the drainage of the
surface water.
Irregular subsidence in the ballast and displacements in the lateral
positional geometry of
the track are caused by the acting wheel forces of the trains that travel over
said ballast.
The subsidence in the ballast bed causes errors in the longitudinal level, the
superelevation
(in the curve), the twist and the track lining position.
If specific comfort limit values or safety limit values of these geometric
parameters as
determined by railway authorities are exceeded, maintenance work is planned
and
performed in a timely fashion. If previously determined danger limit values
are exceeded,
the speed is reduced depending on the magnitude of the errors, or the track is
blocked and
the repair of the so-called individual errors is carried out immediately. The
repair and
correction of these geometric track errors is mostly currently carried out by
means of track
construction machines. There are measurement systems for detecting the current
track

CA 02964803 2017-04-18
2
position for the parameters of lining, lifting, twisting and transverse
inclination for the
purpose of controlling the process.
In order to ensure that the track can be released for operation again after
such track
geometry repair work, the permanent-way railway machines are equipped with so-
called
acceptance measurement systems and acceptance recording systems. So-called
acceptance tolerances have been determined by the railway authorities for the
quality of
the track position after the improvement by the permanent-way machines or
other methods.
They represent the minimum requirements placed on the quality of the
implemented
geometric improvements. They are proven by acceptance measurement systems and
acceptance recording systems. The recorded results represent official safety-
relevant
documents. That is why such acceptance measurement systems and acceptance
recording systems are subjected to regular calibration and acceptance by
authorised
parties. The parameters to be disclosed, corrected and recorded are the
twisting of the
track, longitudinal level of the track, direction or lateral position of the
track, the track gauge,
and the transverse inclination or superelevation of the track.
The target geometries of the railway tracks are available in form of track
plans and can be
used after input into the control computer for calculating the systematic
errors with
knowledge of the behaviour of the measurement systems. On track construction
machines,
there is the front section operator who is responsible for controlling the
machine concerning
the target geometry and also concerning the acceptance by the data recorder.
In the event
of an error that is displayed by the acceptance recorder, the machine must
travel back for
example and repair the error so that the acceptance tolerances are maintained.
The front section operator of track construction machines sees the track
geometry
according to the currently used methods in form of curvature progressions of
the track over
the arc length. The illustration occurs visually on a computer screen in form
of diagrams.
The machine operator is shown diagrams on a separate additional screen which
represent
the deviations of the individual parameters from the target position.
According to the
currently used methods, the machine operator can enter additional corrective
values
depending on these deviations. If the track springs back, the machine operator
can allow
the track to be slightly overpressed by the machines. The effects of the
corrective value are

CA 02964803 2017-04-18
3
only visible with delays because the acceptance recorder records the track
position only
approximately 10 m after the location where the track position is processed.
The illustration as a curvature image, longitudinal inclination image and
superelevation
image is abstract and not generally understandable to the machine operator.
The view from
the front window of the machine which shows a track position in reality is not
congruent
with the illustrated, mathematically abstract computer image on the screen.
This current
method therefore places complex demands on the machine operator; the
information
provided is unclear, difficult to understand and can therefore easily lead to
operating errors.
This is not only aggravated by two independent computers for the guidance
after the track
target position and the digital acceptance recorder, but also by the fact that
the display
axes of the measurement recorders are usually shown in a precisely reverse
manner.
The recording of geometric track positions currently occurs as a standard
mostly with
asymmetric cord measurement systems (cord sections a, b). A steel cord is
centrally
tensioned in this process between a front and a rear measuring carriage which
is pressed
onto the track on one side. A measuring carriage is arranged and pressed on
one side
between these tensioning carriages. The measuring carriage carries a scanning
apparatus
which measures of the position of the steel cord from the centre position.
This value is
known as arrow height. The carriages are pressed to the outside of the bend
for the
direction. The inner curved rail is used as a reference for the height. The
target curvature
image is converted by means of the following arrow height formula into a
target arrow
height image (proportional to the curvature image).
a b
f = 2 R
The progression of the thus calculated target arrow height is compared with
the measured
actual arrow height during the measurement and the differences are recorded.
Acceptance
limit values are specified for these differences by the railway administration
authorities.
This procedure is also used similarly for the longitudinal inclination
curvature image. The
superelevation can be stated directly as a reference via the centroid axis and
can be

CA 02964803 2017-04-18
,
4
measured via a pendulum or other inclinometers, and the deviations can be
stated by
comparison with the target superelevations. Acceptance limit values also apply
to the
superelevation deviations. Arrow height measurements are subjected to a so-
called
transfer function, i.e. the amplification and phase position of the measured
errors are
dependent on wavelength and correspond only qualitatively to the actual track
geometry
errors.
Summary of the invention
The invention is thus based on the object of providing a method of the kind
mentioned
above with which the target track geometry, the actual track geometry and the
deviations
from the target track geometry caused by imprecision in the work are to be
illustrated in
such a clear fashion that the probabilities for operating errors of the
machine are reduced
and intuitive control of the machine is enabled.
This object is achieved in accordance with the invention in such a way that
first a three-
dimensional position image is calculated from the curvature image, the
longitudinal level
image and the superelevation image of the target track geometry, that the
three-
dimensional position image is put into a perspective display and is displayed
by means of
the output unit, and that the perspective position image is supplemented by
the measured
error curves for the track parameters of track direction, superelevation,
twist, and
longitudinal level.
The target track geometry, the actual track geometry and the deviations from
the target
track geometry produced by imprecision in the work are shown in perspective in
an image,
in addition to the effects of corrective action by the machine operator, which
image is
substantially congruent with the view from his window in the working
direction. In addition,
certain track markers (synchronisation points) such as switch positions,
bridge positions or
main points of the curvature (positions in the track in which the direction
curvature image,
the longitudinal inclination image or the superelevation image change) can be
entered in
this perspective image. Synchronisation points are associated for this purpose
with the
target track geometry, which synchronisation points are illustrated at the
respective
positions of the respective illustration of the track progression, wherein a
synchronisation of

CA 02964803 2017-04-18
the actual synchronisation points on the track system is made with the virtual

synchronisation points of the perspective display upon reaching the
synchronisation points
with the permanent-way machine.
The position of the permanent-way machine in the display of the output unit
and the display
of the current error values occurs continuously with the progression of the
machine. The
view of the machine operator from his window in the working direction is thus
always
substantially congruent with the perspective illustration. The progression of
the residual
errors is pre-calculated depending on the measured error curves and the
performed control
interventions are also displayed in the perspective illustration.
Furthermore, the track position in front of the permanent-way machine can be
recorded
with an image recording device, the position of the rails can be calculated
with an image
evaluation unit, and the calculator position of the rails and the target track
geometry can be
displayed in perspective in the position image. The machine operator can thus
consider in
advance any required corrective actions that need to be made by the operator.
It is
recommended for this purpose that the progression of the deviations of the
track position to
be corrected is calculated from the target position and trends are calculated
and are
displayed on the output unit in order to ensure adherence to the tolerances by
timely
intervention on the lifting and lining device.
Corrections of calculated deviations of the track position to be corrected
from the target
position in front of the lifting and lining device can be carried out in an
automated manner
by a control system of the lifting and lining device.
Since the permanent-way machines mostly measure the arc length via odometers
and they
are provided with slightly imprecise values as a result of slippage, soiling
of the wheel etc,
the machine is synchronised at the synchronisation points with the target arc
length. For
this purpose, synchronisation points in front of the permanent-way machine can
be
recorded with an image recording device and can be displayed in the
perspective image
from a preselected approach for synchronisation. The synchronisation prevents
the adding
up of the measurement errors of the arc length. The synchronisation can be
carried out
manually or automatically.

83990867
6
In accordance with the invention, the target track geometry which is
predetermined by
the curvature images for the lateral position, the longitudinal inclination
images for the
height position and the superelevation images for the track superelevation is
converted into a three-dimensional space curve and the target track geometry
is
subsequently displayed visually in perspective, on a screen or the like. The
detected
deviations of the generated track position from the target position are
entered in the
perspective image and used for correction via the control unit, either in an
automatic
mode or manual mode. Synchronisation points of the track which are used for
synchronisation of the measured arc length of the track construction machine
with the
actual arc length are also shown in perspective with respect to their
position, similar
to other important track points such as switches, bridges, level crossings
etc.
Automatic correction of the residual track geometry errors can occur for
example by
calculating the mean values of the recorded errors of the longitudinal level,
the
direction and superelevation (e.g. over the last 10 m), in that the average
value of the
respective errors is returned to the control unit of the permanent-way machine
for
correction (feedback loop). If the mean value of the superelevation error is
at -2 mm
for example, the superelevated side is lifted higher by 2 mm by the permanent-
way
machine in order to compensate this error. The same also applies to the other
measurement parameters.
The perspective image can be projected via a head-up projector onto the front
window
screen of the permanent-way machine and/or displayed with data goggles.
Furthermore, the perspective image can be transmitted by a radio data line to
a control
centre remote from the operations site of the permanent-way machine for the
purpose
of monitoring the progress of the work, wherein the work can optionally be
carried out in
a remote-controlled manner from the control centre.
According to some embodiments of the present invention, there is provided a
method
for measuring and displaying the track geometry of a track system using a
track-
driveable permanent-way machine having a control measurement system measuring
a
value of the track position to be corrected before a lifting and lining
device, an
acceptance measurement system measuring a value of the corrected track
position
CA 2964803 2020-03-24

83990867
6a
after the lifting and lining device, and an associated output unit having a
display that is
visible to a user displaying the measured values, said method comprising:
controlling
the lifting and lining device depending on the measured values of the control
measurement system and the acceptance measurement system so as to achieve a
predetermined target track geometry including a curvature image, a
longitudinal level
image and a superelevation image; first calculating a three-dimensional
position image
from the curvature image, longitudinal level image and superelevation image of
the
target track geometry, putting the three-dimensional position image into a
perspective
display so as to form a perspective position image, and displaying the
perspective
position image using the output unit, and supplementing the perspective
position image
by measured error curves for track parameters including track direction,
superelevation,
twist, and longitudinal level.
Brief description of the drawings
The subject matter of the invention is shown in the drawings by way of
example,
wherein:
CA 2964803 2020-03-24

CA 02964803 2017-04-18
7
Fig. 1 shows a monitor display of a target curvature image, a superelevation
image and a
longitudinal inclination image as well as the synchronisation points according
to the prior
art;
Fig. 2 shows an illustration of a screen image of a measurement recording
after completed
maintenance work according to the prior art;
Fig. 3 shows a perspective view in accordance with the invention of the track
geometry, the
remaining track errors and the synchronisation points;
Fig. 4 shows a landscape view of a track position in a layout plan with
asymmetric cord
measurement;
Fig. 5 shows an illustration of a track system in a layout plan with
indication of the
curvature radius, track curve angle and the adjoining tangent;
Fig. 6 shows an illustration of the composition of the three-dimensional
display coordinates
consisting of the layout plan, height position and superelevation, and
Fig. 7 shows a detailed view of the composition of the three-dimensional
display
coordinates consisting of the layout plan, height position and superelevation.
Description of the preferred embodiment
Fig. 1 shows a schematic monitor display A of a track geometry computer
according to the
prior art by way of example. The first column 1 shows the stationing in
kilometres of the arc
length. The next column 2 shows the progression of the so-called curvature
image k(s).
The curvature 5 corresponds to the reciprocal value of the track radius 1/R1.
In order to
ensure that no excessive jerk is produced when a train travels from straight
tracks into a
track curve, so-called transition curves are implemented. The simplest form of
the transition
curve is the linear transition curve, in which the curvature increases
continuously with the
arc length until it has reached the curvature which corresponds to the track
radius. The
following applies to the progression of the curvature of the linear transition
curve:

CA 02964803 2017-04-18
8
S 1 1
fiir k = 0 bis k = ¨R
In the layout plan, the linear transition curve represents a clothoid. In
addition to this
transition curve, there are also other embodiments such as the so-called Bloss
transition
curve, with a progression of the curvature according to the equation:
k = 3 = (5-)2 ¨ 2 (¨s)3
Cosine-shaped or sinusoidal as well as biquadratic (Helmert) transition curves
and other
shapes are known. It is a general property thereof that analytical methods
cannot be
applied for determining Cartesian coordinates for the layout plan, but
approximation
methods or numerical methods must be used instead. The display of the
curvature over the
arc length k(s) requires double integration for the representation in a
Cartesian coordinate
system.
The next column 3 shows the progression of the superelevation 6 u(s). The
superelevation
is usually stated in millimetres. It is the dimension by which the outer
curved rail is laid in a
lifted manner in relation to the inner track curve as a reference.
The last column 4 shows the longitudinal inclination image h(s) 7, which is
also indicated
as a curvature image. Since the inclinations in railways are relatively small,
no transition
curves are necessary for the longitudinal level. Mostly, only very low
vertical curves of the
transition occur from one inclination to another, or none at all. Column 1
also displays
synchronisation points on the main curve points 15 or for special points such
as for bridges
34 or switches 34 in form of symbols. The position of the machine 22 is
illustrated in the
geometry during the work as a horizontal line.

CA 02964803 2017-04-18
9
Fig. 2 schematically shows the monitor screen B of a digital recorder of the
geometric track
position according to the prior art after the track-position correction work.
The lowermost
line 1 shows the stationing in kilometres (arc length). The uppermost line 8
shows the
progression of the measured arrow height (direction) and the permissible
tolerances 14
around said measured value. If these tolerances are exceeded, the machine
operator is
warned via a signal. The second line 9 from above represents the progression
of the
measured superelevation and the tolerance lines. There is an overshoot in the
downward
direction in 16. In this case, the machine must retract and correct this
region again until the
tolerances match. The third line from above 10 shows the progression of the
longitudinal
level of the tolerance lines. An overshoot is present in 12 in this case too.
Finally, a quantity
derived from the superelevation, i.e. the twist, is represented in the fourth
column from
above 11. The twist is a quantity which due to its relevance for safety
against derailment is
especially safety-critical. The illustrated overshoot in 13 requires
reprocessing by the
tamping machine. The position of the perpendicular line 28 represents the
position of the
current measurement recording.
Fig. 3 shows the perspective image of machine guidance in accordance with the
invention.
The aforementioned two monitor images for the track position computer A and
the
acceptance recorder B in curvature images over the arc length are integrated
in an image
in form of a perspective illustration. A three-dimensional position image is
calculated from
the target track geometry default values, the curvature image k(,), 2,
longitudinal level
image h(s), 4, and superelevation image u(s), 3 of the target track geometry.
The three-
dimensional position image 19 is brought to a perspective view and is
displayed with the
output unit. Furthermore, the perspective position image is supplemented by
the measured
error curves for the track parameters of track direction 39, superelevation
23, twist 49 and
longitudinal level 20. A spatial target curve is calculated in Cartesian
coordinates and it is
converted into a perspective view and presented. 19 shows the calculated track
of the
target position of the track. 29 symbolically displays the working position of
the machine. 28
shows the current position of the permanent-way machine. 22 shows the position
of the
recording of the recorder. 20 shows the deviation of the longitudinal level
from the target
track height position. 21 shows the current last deviation. The value of this
deviation is
indicated in field 40. 31 shows the predicted value which would be obtained by
the
correction. Line 44 shows the previously calculated progression in the event
of manual

CA 02964803 2017-04-18
action of the machine operator via the compensation potentiometer. In the
automatic mode,
the computer would calculate and carry out the necessary correction itself. 48
shows the
permitted limit values for the measured acceptance parameter. R stands for the
deviation
of the track lining position in mm, H for the deviations of the height
position in mm, u for the
deviation of the superelevation in mm, and %o for the permissible limit value
of the twist in
per mil. The line 39 indicates the horizontal track position deviations
relating to the target
curve of the track. The deviation present at the current measurement point is
output in 38
in numerical values. 43 indicates the progression of the previously calculated
curve in a
manual or automatic correction. The previously calculated value of the
deviation is
indicated in 37. 23 represents the deviation of the superelevation. The angle
of the hatched
area indicates whether it is an upward or downward superelevation error. The
adjoining 50
represents the current deviation in numerical values. 24 represents the
superelevation as a
symbol. Since it concerns a left curve, the right rail is superelevated. The
deviation of the
track lining position is always shown in the rail that is on the outside in
the curve and the
longitudinal level on the rail that is on the inside of the curve because it
is the reference rail
for the height. 42 is the predicted curve of the development of the
superelevation error at
respective manual or automatic correction. 35 is the value which would
presumably be
obtained during the subsequent measurement. 27 is the current deviation of the

superelevation at the measuring point. 49 represents the deviation curve of
the twist. 25 is
the symbol for the twist. 26 is the current deviation at the measuring point.
45 is the
previously calculated curve of the manual or automatic corrective action. 33
is the value
which would be obtained with the current corrective values at the working
point. One of the
signs 17 appears upon exceeding one of the limit values of the acceptance
curves or if the
progression of the acceptance curves is satisfactory. The symbol to the right
would indicate
a flawless progression, the middle one would represent an impermissible
exceeding of the
tolerances, while the one on the left would indicate that the trend of the
deviation indicates
an imminent exceeding of the limit values. 36 indicates the synchronisation
points of the
main curve points. Other potential synchronisation points such as a bridge 34
or a switch
41 are illustrated in an "expressive" manner. 32 shows the horizon. If the
machine, apart
from a preset threshold value, approaches a synchronisation point (e.g. 5 m),
a visual
and/or acoustic warning is made and the image of the synchronisation point
video camera
is displayed in 30. The synchronisation occurs by the machine operator by
means of the
video image or by inspection from the window manually via a push button. The

CA 02964803 2017-04-18
11
synchronisation points are usually marked on the rail. If the front tension
carriage is
precisely above the synchronisation point, synchronisation is carried out.
From a
perspective view, the image C is shown from a slight bird's eye perspective,
with a
vanishing point in infinity common to both rails. The progression of the rails
is only
calculated and displayed up to a finite length (e.g. 50 m).
Fig. 4 shows an arc 46 in a layout plan. So-called arrow height measurement
methods are
commonly used in permanent-way machines for measuring the track position. A
cord (a, b)
of length I = a+b is guided on the rail via measuring carriages along the arc
(arc length s).
47 shows a track error. The calculated target arrow height fab is compared by
the machine
with the measured arrow height Val,. This leads to the deviation F which is
compensated by
the machine by respective lining. Asymmetric cords with section lengths a and
b are
usually used. The arrow height is then obtained from
a = b
f = 2R
Fig. 5 schematically shows an arc 46 in the plan view (x, y coordinates) and
the correlation
between arc angle p and radian measure s. The following mathematical
correlations apply
to the calculation of the coordinative illustration:

CA 02964803 2017-04-18
(s)=12
r p(s) ds = k(s) ds
dx = cos cp(s) ds
dy = sin (p(s) ds
s2 s2 (f s2
x= j" COS (p(s) ds = cos , k(s)ds ds
r s2 s2 r s2
y = sin p(s) ds = sin k(s) dsi ds
si si
Since the integrals are usually not analytically solvable, they are calculated
numerically. k(s)
represents the curvature progression in the layout plan. Procedure is carried
out
analogously for the height position; the height progression is mapped onto the
y, z plane.
The superelevation can be calculated directly (because stated as u(s)) and can
be added
to the Z axis of the reference rail (which is always the rail on the outside
of the curve). The
rails have the distance d (d = track gauge, normal gauge = 1435 mm).
Fig. 6 shows how the three-dimensional progression of the rails can be
calculated from the
layout plan (in the x, y plane), the vertical plan view (y, z plane), the
superelevation u and
the track gauge d.
Fig. 7 represents the assembly in detail. A calculated point (Pi,0) with the
coordinates (xi, yi)
in the x, y plane is supplemented by the z coordinate from the vertical plan
view to form the
three-dimensional point P,,1 with the coordinates (xi, yi, zi). Since it
concerns a right-hand
arc, the superelevation u must be entered on the left rail. The point Pi,2
with the coordinates
(x,, y,, z, + ui) is obtained. The track gauge d is deducted perpendicularly (-
1/k5i) on the
tangent t (ascending gradient k,i) in the layout plan. This leads to the point
P',,0 with the
coordinates (x'i, y'i). In order to obtain the three-dimensional point P'1,1,
the z coordinate is
supplemented to form the coordinates (x'õ y',, z',). In the event of precise
calculation, the
superelevation (on the outside curve) is not perpendicular to the x, y plane
but slightly

CA 02964803 2017-04-18
13
oblique (maximum approx. 6 ). This deviation F' is irrelevant for the
perspective illustration
and is therefore disregarded.

Representative Drawing
A single figure which represents the drawing illustrating the invention.
Administrative Status

For a clearer understanding of the status of the application/patent presented on this page, the site Disclaimer , as well as the definitions for Patent , Administrative Status , Maintenance Fee  and Payment History  should be consulted.

Administrative Status

Title Date
Forecasted Issue Date 2020-07-28
(86) PCT Filing Date 2015-10-19
(87) PCT Publication Date 2016-04-28
(85) National Entry 2017-04-18
Examination Requested 2020-03-24
(45) Issued 2020-07-28

Abandonment History

There is no abandonment history.

Maintenance Fee

Last Payment of $210.51 was received on 2023-09-21


 Upcoming maintenance fee amounts

Description Date Amount
Next Payment if standard fee 2024-10-21 $277.00
Next Payment if small entity fee 2024-10-21 $100.00

Note : If the full payment has not been received on or before the date indicated, a further fee may be required which may be one of the following

  • the reinstatement fee;
  • the late payment fee; or
  • additional fee to reverse deemed expiry.

Patent fees are adjusted on the 1st of January every year. The amounts above are the current amounts if received by December 31 of the current year.
Please refer to the CIPO Patent Fees web page to see all current fee amounts.

Payment History

Fee Type Anniversary Year Due Date Amount Paid Paid Date
Application Fee $400.00 2017-04-18
Maintenance Fee - Application - New Act 2 2017-10-19 $100.00 2017-09-27
Maintenance Fee - Application - New Act 3 2018-10-19 $100.00 2018-09-24
Maintenance Fee - Application - New Act 4 2019-10-21 $100.00 2019-09-25
Request for Examination 2020-10-19 $800.00 2020-03-24
Final Fee 2020-09-21 $300.00 2020-06-10
Maintenance Fee - Patent - New Act 5 2020-10-19 $200.00 2020-09-21
Maintenance Fee - Patent - New Act 6 2021-10-19 $204.00 2021-10-04
Maintenance Fee - Patent - New Act 7 2022-10-19 $203.59 2022-09-30
Maintenance Fee - Patent - New Act 8 2023-10-19 $210.51 2023-09-21
Owners on Record

Note: Records showing the ownership history in alphabetical order.

Current Owners on Record
HP3 REAL GMBH
Past Owners on Record
None
Past Owners that do not appear in the "Owners on Record" listing will appear in other documentation within the application.
Documents

To view selected files, please enter reCAPTCHA code :



To view images, click a link in the Document Description column. To download the documents, select one or more checkboxes in the first column and then click the "Download Selected in PDF format (Zip Archive)" or the "Download Selected as Single PDF" button.

List of published and non-published patent-specific documents on the CPD .

If you have any difficulty accessing content, you can call the Client Service Centre at 1-866-997-1936 or send them an e-mail at CIPO Client Service Centre.


Document
Description 
Date
(yyyy-mm-dd) 
Number of pages   Size of Image (KB) 
PPH Request 2020-03-24 13 454
PPH OEE 2020-03-24 11 790
Claims 2020-03-24 3 88
Description 2020-03-24 14 639
Final Fee 2020-06-10 5 134
Representative Drawing 2020-07-07 1 12
Cover Page 2020-07-07 1 54
Cover Page 2017-07-04 2 66
Maintenance Fee Payment 2017-09-27 2 82
Abstract 2017-04-18 1 32
Claims 2017-04-18 3 100
Drawings 2017-04-18 4 62
Description 2017-04-18 13 596
Representative Drawing 2017-04-18 1 27
Patent Cooperation Treaty (PCT) 2017-04-18 1 36
Patent Cooperation Treaty (PCT) 2017-04-18 3 137
International Preliminary Report Received 2017-04-18 14 470
International Search Report 2017-04-18 4 143
Amendment - Abstract 2017-04-18 2 111
National Entry Request 2017-04-18 3 63