Language selection

Search

Patent 3026886 Summary

Third-party information liability

Some of the information on this Web page has been provided by external sources. The Government of Canada is not responsible for the accuracy, reliability or currency of the information supplied by external sources. Users wishing to rely upon this information should consult directly with the source of the information. Content provided by external sources is not subject to official languages, privacy and accessibility requirements.

Claims and Abstract availability

Any discrepancies in the text and image of the Claims and Abstract are due to differing posting times. Text of the Claims and Abstract are posted:

  • At the time the application is open to public inspection;
  • At the time of issue of the patent (grant).
(12) Patent Application: (11) CA 3026886
(54) English Title: SYSTEMS AND METHODS OF CONCRETE APPARATUS WITH INCORPORATED LIFTER
(54) French Title: SYSTEMES ET METHODES D'UN DISPOSITIF POUR BETON ARME AVEC LEVIER INTEGRE
Status: Examination Requested
Bibliographic Data
(51) International Patent Classification (IPC):
  • B28B 23/02 (2006.01)
  • B66C 1/66 (2006.01)
  • E04C 5/16 (2006.01)
  • E04G 21/00 (2006.01)
  • F16B 45/00 (2006.01)
  • B28B 11/02 (2006.01)
(72) Inventors :
  • FORE, PAT (United States of America)
(73) Owners :
  • PF3 GLOBAL, LLC (United States of America)
(71) Applicants :
  • PF3 GLOBAL, LLC (United States of America)
(74) Agent: SMART & BIGGAR LP
(74) Associate agent:
(45) Issued:
(86) PCT Filing Date: 2018-09-11
(87) Open to Public Inspection: 2020-01-11
Examination requested: 2023-09-11
Availability of licence: N/A
(25) Language of filing: English

Patent Cooperation Treaty (PCT): Yes
(86) PCT Filing Number: PCT/US2018/050520
(87) International Publication Number: WO3116/000394
(85) National Entry: 2018-12-07

(30) Application Priority Data:
Application No. Country/Territory Date
16/032,071 United States of America 2018-07-11

Abstracts

English Abstract



Systems and methods for a concrete apparatus with incorporated lifter are
provided. A concrete apparatus is formed by placing a reinforcement
system in a mold. The reinforcement system comprises a lifter. Concrete
is poured into the mold such that the lifter protrudes from the poured
concrete. After the concrete has hardened and the mold is removed, the
lifter is used to carry and position the concrete apparatus. After the
concrete apparatus is positioned, the lifter is removed at the
circumference of the concrete apparatus leaving no holes, thereby
eliminating water leakage due to lifting methods.


Claims

Note: Claims are shown in the official language in which they were submitted.



CLAIMS

Therefore, at least the following is claimed:

1. A method comprising:
weaving a lifting cable into a first reinforcing cage with a first set of bars
in a first direction and a second set of bars in a second different
direction, the lifting cable weaved under and over bars in the first
direction and between the bars in the second direction, the lifting
cable protruding from the cage to form a loop;
locating the reinforcement cage within a concrete form;
pouring concrete into the concrete form;
removing the concrete form, allowing the loop of the lifting cable to
spring out; and
filling a void left by the springing cable such that the surface is flush.
2. The method of claim 1, wherein the second direction is a
circumferential direction of the reinforcement cage.
3. The method of claim 2, further comprising installing rebar in the first
direction and inside the reinforcement cage in the circumferential
direction.
4. The method of claim 1, further comprising a second reinforcement
cage outside the first reinforcing cage, the lifting cable weaved into
the inside of the first reinforcing cage.
5. The method of claim 4, further comprising installing rebar in the first
direction and inside the reinforcement cage in the circumferential
direction.
6. The method of claim 5, wherein the rebar is installed on the inside of
the first reinforcing cage.

14


7. The method of claim 1, further comprising tying the lifting cable to the
first reinforcing cage.
8. The method of claim 7, wherein the lifting cable is tied to the first
reinforcing cage where the loop meets the cage and at the end of
the lifting cable, on both sides.
9. The method of claim 1, further comprising installing spacers on the
reinforcing cage, the spacers configured to provide spacing
between the reinforcing cage and the concrete form.
10.The method of claim 1, wherein the reinforcing cage is in the form of
one of a round pipe, arch pipe, straight pipe, elliptical pipe, bent
pipe, curved pipe, culvert, pullbox, catch basin, retaining wall,
manhole sections, and building panel.
11. The method of claim 1, wherein the lifting cable is plastic coated.
12. An apparatus comprising:
a lifting cable configured to be woven into a reinforcing cage of a
concrete structure, the reinforcing structure comprising a first set
of bars in a first direction and a second set of bars in a second
different direction, the lifting cable further configured to be
woven in an under and over pattern of the bars in the first
direction and between the bars in the second direction.
13. The apparatus of claim 12, wherein the lifting cable is further
configured to protrude from the reinforcing cage to form a loop.
14. The apparatus of claim 13, wherein the loop of the lifting cable is
coated with a material, the coating material extending at least to the
reinforcement cage on both sides of the loop.
15. The apparatus of claim 12, wherein the lifting cable comprises
galvanized steel.



16.The apparatus of claim 12, further comprising at least one cable tie
configured to attach the lifting cable to the reinforcing cage.
17.The apparatus of claim 16, comprising a plurality of cable ties
configured to attach the lifting cable to the reinforcing cage at both
points where the loop meets the cage and at the both ends of the
lifting cable.
18. The apparatus of claim 12, further comprising spacers configured to
be installed on the reinforcing cage, the spacers configured to
provide spacing between the reinforcing cage and a concrete form
19.The apparatus of claim 12, wherein the reinforcing cage is in the form
of one of a round pipe, arch pipe, straight pipe, elliptical pipe, bent
pipe, curved pipe, culvert, pullbox, catch basin, retaining wall,
manhole sections, and building panel.

16

Description

Note: Descriptions are shown in the official language in which they were submitted.


Systems and Methods of Concrete Apparatus with
Incorporated Lifter
CROSS REFERENCE TO RELATED APPLICATION
[0001] This application is a continuation in part application of U.S
patent
application Ser. No. 14/492,431 filed on September 22, 2014, which is a
divisional application of U.S. patent application Ser. No. 12/421,337 filed
on April 9, 2009, entitled "Systems and Methods of Concrete Apparatus
with Incorporated Lifter," which are all incorporated by reference herein.
TECHNICAL FIELD
[0002] The present disclosure is generally related to concrete
fabrication and,
more particularly, is related to precast concrete apparatus.
BACKGROUND
[0003] Precast concrete is a form of construction, where concrete is cast
in a
reusable mold or "form" which is then cured in a controlled environment,
transported to the construction site and lifted into place. In contrast,
standard concrete is poured into site specific forms and cured on site.
Precast stone is distinguished from precast concrete by using a fine
aggregate in the mixture so the final product approaches the appearance
of naturally occurring rock or stone.
[0004] By producing precast concrete in a controlled environment
(typically
referred to as a precast plant), the precast concrete is afforded the
opportunity to properly cure and to be closely monitored by plant
employees. Many states across the United States require a precast plant
to be certified (either by NPCA or PCI) for a precast producer to supply
their product to a construction site sponsored by State and Federal
Departments of Transportation (DOTs).
[0005] Ancient Roman builders made use of concrete and soon poured the
material into molds to build their complex network of aqueducts, culverts
1
CA 3026886 2018-12-07

and tunnels. Modern uses for precast technology include a variety of
architectural and structural applications featuring parts of or an entire
building system. Precast architectural panels are also used to clad all or
part of a building facade, free-standing walls used for landscaping,
soundproofing and security walls. Storm water drainage, water and
sewage pipes and tunnels make use of precast concrete units. The
advantages of using precast concrete is the increased quality of the
material, when formed in controlled conditions, and the reduced cost of
constructing large forms used with concrete poured on site.
[0006] There are many different types of precast concrete forming systems
for
architectural applications, differing in size, function and cost.
SUMMARY
[0007] Example embodiments of the present disclosure provides systems of
concrete apparatus with incorporated lifter. Briefly described, in
architecture, one example embodiment of the apparatus, among others,
can be implemented as follows: a reinforcement cage; and at least one
lifter, the at least one lifter an incorporated lengthened portion of the
reinforcement cage.
[0008] Example embodiments of the present disclosure can also be viewed
as
providing systems of concrete apparatus with incorporated lifter. In this
regard, one embodiment of such a system, among others, can be broadly
summarized by the following: a concrete mold configured to accept: a
reinforcement cage, the reinforcement cage comprising at least one lifter,
the at least one lifter an incorporated lengthened portion of the
reinforcement cage; and concrete for molding around the reinforcement
cage.
[0009] Example embodiments of the present disclosure can also be viewed
as
providing systems of concrete apparatus with incorporated lifter. In this
regard, one embodiment of such a system, among others, can be broadly
summarized by the following: a reinforcement cage comprising at least
2
CA 3026886 2018-12-07

one lifter, the at least one lifter an incorporated lengthened portion of the
reinforcement cage; and a concrete mold configured to accept the
reinforcement cage.
BRIEF DESCRIPTION OF THE DRAWINGS
[0010] FIG. 1 is a diagram of an example embodiment of a concrete device.
[0011] FIG. 2 is a diagram of an example embodiment of a reinforcement
structure with incorporated lifter used in the concrete device of FIG. 1.
[0012] FIG. 2A is a diagram of an example embodiment of the lifter of
F1G.2
incorporated by interweaving in an over and under method.
[0013] FIG. 3 is a diagram of an example embodiment of the concrete
device of
FIG. 1 with the lifter of FIG. 2.
[0014] FIG. 4 is a diagram of an example embodiment of the concrete
device of
FIG. 3 with the lifter removed at the outer circumference of the concrete
device.
[0015] FIG. 5 is a flow diagram of an example embodiment of a method of
manufacturing the concrete device of FIG. 3.
[0016] FIG. 6 is a flow diagram of an example embodiment of a method of
using
the concrete device of FIG. 3.
[0017] FIG. 7 provides a diagram of a reinforcement cage with rebar
installed.
[0018] FIG. 8 provides a length-wise cut-away diagram of a concrete pipe
with
lifting cable installed.
[0019] FIG. 9 provides a cross-wise cut-away diagram of a round concrete
pipe
with lifting cable installed.
3
CA 3026886 2018-12-07

[0020] FIG. 10 provides a diagram of a reinforcement cage with lifting
cable
installed.
[0021] FIG. 11 provides a diagram of a reinforcement cage with spacer
installed.
[0022] FIG. 12 provides a diagram of a formed concrete structure with
lifting
cable installed.
[0023] FIG. 13 provides a cross-wise cut-away diagram of an arch concrete
pipe
with lifting cable installed.
[0024] FIG. 14 provides a diagram of a formed concrete structure with a
coated
lifting cable installed.
DETAILED DESCRIPTION
[0025] Embodiments of the present disclosure will be described more fully

hereinafter with reference to the accompanying drawings in which like
numerals represent like elements throughout the several figures, and in
which example embodiments are shown. Embodiments of the claims may,
however, be embodied in many different forms and should not be
construed as limited to the embodiments set forth herein. The examples
set forth herein are non-limiting examples and are merely examples
among other possible examples.
[0026] Concrete is the world's most commonly used building material. In
its
simplest form, concrete may be a mixture of paste and aggregates. The
material (paste) used to manufacture concrete pipe may be composed
principally of cement and water, and may be used to coat the surface of
the fine and coarse aggregates. The cement may be a closely controlled
chemical combination of calcium, silicon, aluminum, iron, and small
amounts of other compounds, to which gypsum may be added in the final
grinding process to regulate the setting time of the concrete. The
cements chemistry comes to life in the presence of water. Soon after the
cement and water are combined, hydration occurs and the paste hardens
and gains strength to form a rock-like mass, the concrete. During
4
CA 3026886 2018-12-07

hydration, a node forms on the surface of each cement particle. The node
grows and expands until it links up with nodes from other cement particles
or adheres to adjacent aggregates. Within this process lies the key to
concrete--it's plastic and malleable when newly mixed and strong and
durable when hardened.
[0027] The character of the concrete may be determined by the quality of
the
paste. The strength of the paste, in turn, may depend on the ratio of water
to cement. The water-cement ratio is the weight of the mixing water
divided by the weight of the cement. High-quality concrete may be
produced by lowering the water-cement ratio as much as possible without
sacrificing the workability of fresh concrete. Generally, using less water
produces a higher quality concrete provided the concrete is properly
placed, consolidated, and cured. Typically, a mix may be about 10 to 15
percent cement, 60 to 75 percent aggregate and 15 to 20 percent water.
Entrained air in many concrete mixes may also take up another 5 to 8
percent.
[0028] Almost any natural water that is drinkable and has no pronounced
taste or
odor may be used as mixing water for concrete. However, some waters
that are not fit for drinking may be suitable for concrete. Specifications
usually set limits on chlorides, sulfates, alkalis, and solids in mixing water

unless tests can be performed to determine what effect the impurity has
on various properties.
[0029] The type and size of the aggregate mixture depends on the
thickness and
purpose of the final concrete product. A continuous gradation of particle
sizes is desirable for efficient use of the paste. In addition, aggregates are

preferably clean and free from any matter that might affect the quality of
the concrete.
[0030] Curing may begin after the exposed surfaces of the concrete have
hardened sufficiently to resist marring. Curing ensures the continued
hydration of the cement and the strength gain of the concrete. Concrete
CA 3026886 2018-12-07

surfaces may be cured by steam or water. The longer the concrete is kept
moist, the stronger and more durable it will become. The rate of hardening
may depend upon the composition and fineness of the cement, the mix
proportions, and the moisture and temperature conditions. Most of the
hydration and strength gain may take place within the first month of
concrete's life cycle, but hydration continues at a slower rate for many
years. Concrete continues to get stronger as it gets older.
[0031] Precast concrete products may be cast in a factory setting.
Precast
concrete products may benefit from tight quality control achieved at a
production plant. Precast concrete pipe may be produced in highly
controlled plant environments under rigid production standards and
testing specifications. Previous methods of moving precast concrete pipe
have involved leaving a hole in the precast concrete pipe, inserting a
lifting means in the hole and using the lifting means to move the precast
concrete pipe into position. After the precast concrete pipe was moved
into position, the lifting means was removed and the hole is plugged. The
hole may be a source for leaking and weakness in the precast concrete
pipe. However, using the apparatus and methods of precast concrete
device with incorporated lifter disclosed herein, the hole in the concrete
pipe is eliminated such that the concrete pipe isn't weakened, and is
actually strengthened compared to the previous lifting methods.
[0032] FIG. 1 provides an example embodiment of precast concrete pipe
100. It
should be noted that, although an example of a concrete pipe is used in
this disclosure, the methods and systems disclosed herein may be
applicable in any type of precast concrete device. Concrete pipe 100 is
shown with a first end 120 and a second end 110. Although this pipe is
shown as a hollow pipe, the pipe could be solid, or the device could
alternatively be a precast culvert, pullbox, catch basin, retaining wall,
manhole sections, and building panel, as non-limiting examples. Concrete
pipe 100 is shown to be straight and circular, but may be elliptical, arched,
bent, and curved, as non-limiting examples.
6
CA 3026886 2018-12-07

[0033] FIG. 2 provides an example embodiment of reinforcement system 200.

This example embodiment of reinforcement system 200 comprises
reinforcement cage 230 with a first open end 220 and a second open end
210. Reinforcement cage 230 may be constructed of steel, fiber, and
fiber-reinforced plastic as non-limiting examples. As provided in FIG. 2A,
lifter 240 is incorporated to provide lifting functionality after concrete is
poured around reinforcement cage 230. Lifter 240 is placed such that lifter
240 protrudes past the outer diameter of concrete pipe 100. Lifter 240
may be separate from reinforcement cage 230 or it may be an integrated
part of reinforcement cage 230. Lifter 240 may be incorporated into
reinforcement cage 230 by interweaving in an over and under method.
Lifter 240 extends out from reinforcement cage 230, and may be a
lengthened piece of reinforcement cage 230 or a slackened piece of
reinforcement cage 230 as non-limiting examples. Lifter 240 may be
comprised of galvanized steel or any other material which is strong
enough to support the weight of concrete pipe 100. Regarding the use of
the galvanized lifter cable, the galvanized cable will not rust and it is easy

to use. Additionally, no further attachments are necessary.
[0034] Reinforcement system 200 is placed in a concrete mold (not shown)
and
concrete is poured into the mold encasing reinforcement system 200.
Once the concrete is poured into the mold, lifter 240 may be folded down
until the mold is removed and lifter 240 springs up for lifting. FIG. 3
provides concrete pipe 100 after the mold has been removed with lifter
240 protruding from concrete pipe 100. Lifter 240 makes for a safe and
easy way to lift, transport, and lay concrete pipe 100.
[0035] After pipe 100 is laid in a desired position, lifter 240 may be
left in
position. In an alternative embodiment, however, lifter 240 may be
removed. FIG. 4 provides concrete pipe 100 with the protruding section of
lifter 240 detached at points 410, 420 on the outer surface of concrete
pipe 100. If lifter 240 is a galvanized cable, lifter 240 may be severed with
a cable cutter or other detachment means. By severing lifter 240 at the
7
CA 3026886 2018-12-07

outer surface of concrete pipe 100, lifting holes and water leakage may be
reduced or substantially eliminated.
[0036] FIG. 5 provides a flow chart of an example embodiment of method
500 of
manufacturing a concrete device with an incorporated lifter. In block 510
of method 500, a casting mold is provided. In block 520, a reinforcement
structure is provided in the casting mold. In block 530, a lifter is provided,

the lifter protruding from the reinforcement structure. In block 540,
concrete is poured into the casting mold such that the lifter protrudes from
the concrete.
[0037] FIG. 6 provides method 600 of using a concrete device with
incorporated
lifter. In block 620 a precast concrete device is placed, the precast
concrete device comprising an incorporated cable lifter. In block 620, the
cable lifter is detached at the perimeter of the precast concrete device.
[0038] In an example embodiment of a method of installing a lifter, first
a
reinforcement cage is formed. Example standards for cages include but
are not limited to ASTM C-76, AASHTO M170, ASTM 0-506, and
AASHTO M-206. After the reinforcement cage is formed, rebar may be
attached to further reinforce the area where the lifter is installed. Table 1
provides example sizes and placements based on the size of a round
pipe, for example, in reference to the round pipe of FIG. 7 Reinforcement
cage 730 comprises spigot end 710 and bell end 720. The spigot end of a
first pipe may fit into the bell end of a second pipe. Rebar pieces 735 may
be sized and located per Table 1, though other sizing and locations may
be used. In Table 1, Round Size is the diameter of a round pipe, Rebar
Size is the size of the rebar material, Rebar Length is the length of the
rebar material, and Rebar Spacing is the space between the attachment
of more than one piece of rebar.
8
CA 3026886 2018-12-07

Rebar Rebar
Round Size Rebar Size
Length Spacing
12" #3 10"-18" 6"
15" #3 10"-18" 6"
18" #3 10"-18" 6"
24" #3 10"-18" 6"
30" #3 10"-18" 6"
Table 1.
[0039] When the rebar size and location is determined, the rebar may be
welded
to one or more of the circumferential bars (that go around the cage), but
preferably at least two. In an example embodiment, the rebar is welded on
the inside of the circumferential bars the inside of the longitudinal bars.
However, in an alternative embodiment, the rebar is welded on the
outside of the circumferential bars. When multiple cages are used in a
structure, the rebar may be welded on the inside of the circumferential
bars of the inside cage. In an alternative embodiment with multiple cages,
the rebar may be welded on the inside of the circumferential bars of the
outside cage. Although, the spacing of the rebar may match the vertical
bar spacing of the reinforcing cage, the spacing may also differ. In an
example embodiment, the rebar is attached to the reinforcing cage by
welding. In an alternative embodiment, the rebar may be tied, clipped, or
secured in any manner to hold it in place on the reinforcing cage.
Although, #3 and #4 bars are listed in Table 1, the rebar sizes and lengths
may vary depending on the application. Table 1 is listed merely for
guidance.
[0040] The lifting cable diameter and length may be chosen according to
Table 2,
as a non-limiting example. In Table 2, Round Size is the diameter of a
round pipe, Cable Diameter is the diameter of the lifting cable, Cable
9
CA 3026886 2018-12-07

Length is the length of the lifting cable, and B and C wall refers to the wall

thickness of the pipe (such as A, B, and C, where B and C are the most
common). A lifting cable may be used in all three wall thicknesses.
Round Size Cable Diameter Cable Length
12"
15"
18" 3/8 44" (B-wall)
54" (C-wall)
24"
30"
:
-
= reti .
14 N- ".,':t7 AAA 1sa
Table 2.
The lifting cable may be woven into the reinforcing cage, behind the
added rebar, and over and under each horizontal bar between the vertical
(circumferential) bars. A weaving method may be used so that the lifting
cable does not easily pull out of the concrete. The weaving makes it
tighten down and "grab" itself. Alternative methods of holding the cable in
the concrete include a cable clamp and welding the lifting cable to the
reinforcement cage.
[0041] In an example embodiment, the lifting cable forms a loop or
lifting eye as
shown in FIG. 8, in which lifting eye/loop/lifting cable 840 protrudes
beyond the outside of walls 850. In an example embodiment, lifting eye
840 is positioned at the midpoint between spigot end 810 and bell end
820. When laying pipe, the balance of the pipe should be tilted towards
the spigot end. The offset of the lifting point from the midpoint of the pipe
may achieve the desired tilting. The size and length of the cable may be
determined according to Table 3 as a non-limiting example. In Table 3,
CA 3026886 2018-12-07

Size is the inside diameter of the pipe, Wall is the wall thickness, Length
is the length of the pipe (and may vary), D-1 is distance from outside wall
of the pipe to the inside of the lifting cable, D-2 is the distance from the
end of the bell of the pipe to the center of the lifting cable, Cable Dia. is
the diameter of the lifting cable, Cable Length (B Wall) is 44", and Cable
Length (C Wall) is 54".
Awl I U-1' " tt:/ I = õ It t
4 4 1 = 44
i";
õõ.
I ;4! 1 = 4,1
=
=='.= 44
. , = .
:===. I
fl =`.
' 4
, . = .
:==
Table 3
FIG. 9 provides a cross-sectional view of an example round pipe structure
with lifting cable 940 protruding from pipe wall 950.
[0042] In an example embodiment, as provided in FIG. 10, lifting cable
1040 is
attached to reinforcing cage 1030 by cable ties such as cable ties 1060,
1070. Cable tie 1060 attaches lifting cable 1040 to reinforcing cage 1030
at the rebar attachment. Cable tie 1070 attaches lifting cable 1040 to
reinforcing cage 1030 at or near the end of the cable. Lifting cable 1040
may be tied to reinforcing cage 1030 at both pieces of rebar and at both
ends.
11
CA 3026886 2018-12-07

[0043] In an example embodiment, as provided in FIG. 11, one or more
spacers
1180 are added to reinforcing cage 1130 to ensure proper coverage. Both
interior and exterior spacers may be added. If two cages are used, the
cages may use spacers to keep the cages at acceptable distances apart.
Cage diameters may be adjusted within specification to ensure the
additional rebar and lifting eye achieves the proper cover. In an example
embodiment, reinforcing cage 1130 inside the concrete pipe has proper
cover to the surface of the concrete. To achieve proper cover between the
cage and the surface, one or more spacers 1180 are used to hold the
cage in place. Spacers may also be used to hold the cages a proper
distance apart from one another when multiple cages are used.
[0044] After the reinforcement cage is prepared, the reinforcing cage is
located
within a concrete form (cage may be placed within a form or the form may
be placed over the cage), and concrete is poured in the form. In an
example embodiment, the concrete form is removed before the concrete
is fully set. When the pipe mold is filled and vibrated, a header is applied
to the casted pipe and the pipe is stripped from the mold. In an example
implementation, the pipe is let to set for more than 2 minutes on a small
size pipe, but typically no more than 20 minutes on larger sizes. Once the
concrete form is removed, the cable will pop out or spring out of the
concrete, leaving a small void where the lifting cable rested while the
structure was being cast. Once the lifting cable has popped out, the void
left by the cable may be filled. In an example embodiment, the void is
filled with the same concrete mix used in the casting of the structure. The
void may be filled such that the surface of the structure is flush with no
visible indentation present as provided in FIG. 12, with lifting cable 1240
protruding from concrete structure 1250.
[0045] FIG. 13 provides a cross-sectional view of an arch pipe concrete
structure
with lifting cable 1340 protruding from sidewall 1350.
[0046] FIG. 14 provides an example embodiment of concrete structure 1450
with
coated lifting cable 1440. In an example embodiment, the cable is coated
12
CA 3026886 2018-12-07

with plastic to prevent against water following the cable to the inside of the

concrete, and, potentially, to the reinforcing cage. Although plastic is used
as an example, other non-limiting example coatings include rubber,
powder coating, or any other protective coating. The coating may extend
the entire length of the cable or it may only cover the exposed cable that
extends from the concrete.
[0047] Although the present disclosure has been described in detail, it
should be
understood that various changes, substitutions and alterations can be
made thereto without departing from the spirit and scope of the disclosure
as defined by the appended claims.
13
CA 3026886 2018-12-07

Representative Drawing
A single figure which represents the drawing illustrating the invention.
Administrative Status

For a clearer understanding of the status of the application/patent presented on this page, the site Disclaimer , as well as the definitions for Patent , Administrative Status , Maintenance Fee  and Payment History  should be consulted.

Administrative Status

Title Date
Forecasted Issue Date Unavailable
(86) PCT Filing Date 2018-09-11
(85) National Entry 2018-12-07
(87) PCT Publication Date 2020-01-11
Examination Requested 2023-09-11

Abandonment History

There is no abandonment history.

Maintenance Fee

Last Payment of $277.00 was received on 2024-03-11


 Upcoming maintenance fee amounts

Description Date Amount
Next Payment if small entity fee 2024-09-11 $100.00
Next Payment if standard fee 2024-09-11 $277.00

Note : If the full payment has not been received on or before the date indicated, a further fee may be required which may be one of the following

  • the reinstatement fee;
  • the late payment fee; or
  • additional fee to reverse deemed expiry.

Patent fees are adjusted on the 1st of January every year. The amounts above are the current amounts if received by December 31 of the current year.
Please refer to the CIPO Patent Fees web page to see all current fee amounts.

Payment History

Fee Type Anniversary Year Due Date Amount Paid Paid Date
Registration of a document - section 124 $100.00 2018-12-07
Application Fee $400.00 2018-12-07
Maintenance Fee - Application - New Act 2 2020-09-11 $100.00 2020-09-10
Maintenance Fee - Application - New Act 3 2021-09-13 $100.00 2021-09-08
Maintenance Fee - Application - New Act 4 2022-09-12 $100.00 2022-09-12
Request for Examination 2023-09-11 $816.00 2023-09-11
Maintenance Fee - Application - New Act 5 2023-09-11 $277.00 2024-03-11
Late Fee for failure to pay Application Maintenance Fee 2024-03-11 $150.00 2024-03-11
Owners on Record

Note: Records showing the ownership history in alphabetical order.

Current Owners on Record
PF3 GLOBAL, LLC
Past Owners on Record
None
Past Owners that do not appear in the "Owners on Record" listing will appear in other documentation within the application.
Documents

To view selected files, please enter reCAPTCHA code :



To view images, click a link in the Document Description column. To download the documents, select one or more checkboxes in the first column and then click the "Download Selected in PDF format (Zip Archive)" or the "Download Selected as Single PDF" button.

List of published and non-published patent-specific documents on the CPD .

If you have any difficulty accessing content, you can call the Client Service Centre at 1-866-997-1936 or send them an e-mail at CIPO Client Service Centre.


Document
Description 
Date
(yyyy-mm-dd) 
Number of pages   Size of Image (KB) 
Representative Drawing 2019-12-24 1 12
Representative Drawing 2019-12-24 1 9
Cover Page 2019-12-24 1 39
Abstract 2018-12-07 1 14
Description 2018-12-07 13 538
Claims 2018-12-07 3 75
Drawings 2018-12-07 10 158
PCT Correspondence 2018-12-07 5 124
Maintenance Fee Payment 2024-03-11 1 33
Request for Examination 2023-09-11 5 137